From: Bobby Jocz <bobby jocz@suntribesolar.com>
Sent: Wednesday, December 5, 2018 4:19 PM
To: Frank Pohl
Subject: RE: Floodplain Development question
Attachments: Tiverton -Alt Energy Application Plan_P12.11.2015.pdf,
TivertonDHRAmendment6approval_12.15.2015.pdf
See attached
Bobby Jocz
Development Engineer
,g� Sun Tribe Solar
300 East Main St, Suite 200, Charlottesville, VA 22902
Sun Tribe M 540-229-1116 T 800.214.4579 F 434.245.4904
SOLAR Bobby. iocz(cDsuntribesolar.comIwww.suntribesolar.com
This e-mail message, including any attachments, is for the sole use of the person to whom it has been sent, and may contain information that is confidential or legally
protected. If you are not the intended recipient or have received this message in error, you are not authorized to copy, distribute, or otherwise use this message or its
attachments. Please notify the sender immediately by return e-mail and permanently delete this message and any attachments.
From: Frank Pohl <fpohl@albemarle.org>
Sent: Wednesday, December 5, 2018 3:59 PM
To: Bobby Jocz <bobby.jocz@suntribesolar.com>
Subject: RE: Floodplain Development question
Yes, that will make a difference... Do you have any documentation to back that up?
Frank
Frank V. Pohl, PE, CFM
County Engineer
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 (ext. 7914)
From: Bobby Jocz <bobby.iocz@suntribesolar.com>
Sent: Wednesday, December 5, 2018 3:28 PM
To: Frank Pohl <fpohl@albemarle.org>
Subject: RE: Floodplain Development question
Frank,
Thanks for the response. A complication may be that the location shown for the project is the location approved by the
historic preservation committee. The location was identified due to the fact its not visible from the main house, which is
a historic structure. I don't know if this will have any impact to the decision, but may be a bit of added information.
Thanks
Bobby
Bobby Jocz
Development Engineer
�,- Sun Tribe Solar
300 East Main St, Suite 200, Charlottesville, VA 22902
Sun Tribe M 540-229-1116 T 800.214.4579 F 434.245.4904
SOLAR Bobby.jocz suntribesolar.com www.suntribesolar.com
This e-mail message, including any attachments, is for the sole use of the person to whom it has been sent, and may contain information that is confidential or legally
protected. If you are not the intended recipient or have received this message in error, you are not authorized to copy, distribute, or otherwise use this message or its
attachments. Please notify the sender immediately by return e-mail and permanently delete this message and any attachments.
From: Frank Pohl <fpohl@albemarle.org>
Sent: Wednesday, December 5, 2018 1:56 PM
To: Bobby Jocz <bobby.iocz@suntribesolar.com>
Subject: RE: Floodplain Development question
Sorry for the delay. I have asked for input from zoning. So far I am hearing it isn't allowed since it requires a building
permit, and anything that requires a building permit can't be located in the buffer if there is another location outside of
the buffer/floodplain.
I should have something tomorrow after our internal legal meeting.
Thanks,
Frank
Frank V. Pohl, PE, CFM
County Engineer
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 (ext. 7914)
From: Bobby Jocz <bobby.iocz@suntribesolar.com>
Sent: Wednesday, December 5, 2018 11:57 AM
To: Frank Pohl <fpohl@albemarle.org>
Subject: RE: Floodplain Development question
Frank,
I know your busy, but just wanted to circle back to see if you had a chance to look at this?
: A
Bobby Jocz
Development Engineer
�,- Sun Tribe Solar
300 East Main St, Suite 200, Charlottesville, VA 22902
Sun Tribe M 540-229-1116 T 800.214.4579 F 434.245.4904
SOLAR Bobby.jocz suntribesolar.com www.suntribesolar.com
This e-mail message, including any attachments, is for the sole use of the person to whom it has been sent, and may contain information that is confidential or legally
protected. If you are not the intended recipient or have received this message in error, you are not authorized to copy, distribute, or otherwise use this message or its
attachments. Please notify the sender immediately by return e-mail and permanently delete this message and any attachments.
From: Frank Pohl <fpohl@albemarle.org>
Sent: Monday, December 3, 2018 8:55 AM
To: Bobby Jocz <bobby.iocz@suntribesolar.com>
Subject: RE: Floodplain Development question
Bobby,
Please confirm. This is the parcel I am coming up with (see link). What is the address?
http://gisweb.albemarle.org/Map/Viewer.aspx?state=320605898041
Frank V. Pohl, PE, CFM
County Engineer
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 (ext. 7914)
From: Bobby Jocz <bobby.iocz@suntribesolar.com>
Sent: Friday, November 30, 2018 9:17 AM
To: Frank Pohl <fpohl@albemarle.org>
Subject: RE: Floodplain Development question
TMP is 70-14
Thanks
Bobby Jocz I Development Engineer
(C) 540.229.1116 (T) 800.214.4579 (F) 434.245.4909 - Bobby.Jocz(a)suntribesolar.com - www.suntribesolar.com
Sun Tribe
From: Frank Pohl <fpohl@albemarle.org>
Sent: Friday, November 30, 2018 9:15 AM
To: Bobby Jocz <bobby.iocz@suntribesolar.com>
Subject: RE: Floodplain Development question
Bobby,
All is well, and hope things are well for you also!
Can you provide the TMP so I can confirm a few things?
Thanks,
Frank
Frank V. Pohl, PE, CFM
County Engineer
401 McIntire Road
Charlottesville, VA 22902
3
434-296-5832 (ext. 7914)
From: Bobby Jocz <bobby.iocz@suntribesolar.com>
Sent: Thursday, November 29, 2018 3:40 PM
To: Frank Pohl <fpohl@albemarle.org>
Subject: Floodplain Development question
Hey Frank,
Hope all is going well over at the County. I have a quick question regarding a small project we are building for a
landowner in town that I was hoping you could answer. As the attached image shows it sits at the edge of the 100ft
floodplain and thus within the WPO Buffer area. No grading or land disturbance will be required to construct the system
other than driving piles and the total area of disturbance should be much less than the 10,000 sq-ft that would trigger
the need for SWM and E&S plan submittal. My memory is a little hazy, but If I recall projects within the floodplain need
to apply for a Floodplain development permit. Because of the nature of the project I wouldn't anticipate any impact to
the floodplain, so would we simply need to submit a floodplain development permit application along with some sort of
no -rise certification?
Any advice would be greatly appreciated, I hope I'm not missing anything here?
Bobby