HomeMy WebLinkAboutWPO201800079 Plan - VSMP WPO VSMP 2019-01-15Ua
U
CID rn=
N C,
0 LD TRAI L V1 LLAG E
Q2 Q=
, Z O
rr
U 2 0(too'g;o
>U_
O Q CCW JZ
Z OU > <
Filterc W w
�� w W
C) to �
J N
SC AND SWM NQ? QLO
W rc pec Urn
a ° CV
V WO OCOUNTY �
VIRGINIA 4% rc ��
COL W w °n
co o
Ucq
y Z�
O�
M
07 �
w
Z
OUj
O
--- —€
f
I
Z f f
O
Z N 7
F
A4
zz
LU LU
2 ? :E
{
0 0
z�z
0l0
Lu
8?8
Q O ui
SEWER
0 mj�
`o
Z
E
�1,TH OF vl1A
G?
rmy L. Taggart
Lic.$No.
o� 01 X 6419 �4
��SIONAL SSG
zW Q
Q � W z
J q rr Ir
0- J >
J �-- w w
Q J W
Q
U) LL
Q Q m w
�_ Q
LL
QI— Z Cc � ° o
U ~ �
0�zz
Wo W o
O 0
il� ?I"l i'; ��i���ig1 'tt9i4.
OLD TRAIL DRIVE ENTRY FEATUREPLAOFALBEMARLE,
SITE DATA SHEET INDEX
- � ---------__ -- � - -- - --, - SHEET 1 ---------- COVER SHEET
OWNER /DEVELOPER: MARCH MOUNTAIN PROPERTIES LLC CONTACT DAVE BROCKMANm r
1005 HEATHERCROFT CIRCLE, SU/TE 100 CELL: (702)-985-9088
SHEET 2 ---------- EXISTING CONDITIONS/EROSION CONTROL PLAN/DETAILSU_
CROZET, VA 22932 dove�nldtroilvilloge.com
PLAN PREPARER: ROUDABUSH, GALE, & Assoc�ATEs SHEET 3 ---------- DRAINAGE COMPLIANCE MAP
172 SOUTH PANTOPS DRIVE
CHARLOTTESVILLE, VA. 22902
SHEET 4 ---------- EROSION CONTROL NARRATIVE
(434)-977-0205
TAX MAP PARCEL No: A PORTION OF 055E -01-A3 and A PORTION OF 55E -01--A4 � SHEET 5 ---------- LANDSCAPE PLAN/DETAILS
o � Or
ZONING.
a�s
ZON/NG: NEIGHBORHOOD MODEL DISTRICT /N ACCORDANCE WITH PROFFERS OF ZMA-04-024 � a
APPROVED ON SEPTEMBER 14, 2005 d
MAGISTERIAL DISTRICT- WHITE HALL MAGISTERIAL DISTRICT �
�O
STORMWATER MANAGEMENT AS DEFINED BY THE OVERALL STORMWATER MASTER PLAN (WP0201600009), APPROVED
4/25/2016. THIS PROPOSED ENTRY FEATURE DEVELOPMENT ON BLOCKS 34 AND 19 REQUIRE ��
APPROX/MA TEL Y A TOTAL OF 0.03 LB/YR OF PHOSPHORUS REMOVAL. THERE IS CURREN R Y o �
SURPLUS OF TREATMENT ACREAGE IN THE SWM MASTER PLAN, WH/CH /S UNDERSTOOD TO BE a
SUFFICIENT COVERAGE FOR WATER QUALITY REQUIREMENTS UNTIL THE FINAL WPO PLAN FOR
THESE BLOCKS ARE APPROVED BY ALBEMARLE COUNTY ENGINEERING.
WATERSHED: L/CK/NGHOLE CREEK
TOPOGRAPHY. LOUISA AER/AL SURVEYS, AUGUST 2012
ROUDABUSH GALE & ASSOC. TOPOGRAPHIC FIELD SURVEY, OCTOBER 2018 � EXISTING INTERMEDIATE CONTOUR �-32 '----- -' � �
BENCHMARK: WEST TRAFFIC POLE CONC BASE = 708.2
EXISTING INDEX CONTOUR
3o EXISTING WATERLINE � TEE
PROPOSED CNt�t�� Zo I�CC41� WATERLINE V4%EP
/ TEE
DATUM: VERTICAL - NAVD 88, HORIZONTAL -NAD 83 --'
EXISTING � ANT EX. EP
EXISTING I�IF�E DINT
4
CRl71CAL SLOPES: NO CRITICAL SLOPES- EX/ST WITH/N THE PROJECT UMTS PROPOSED OF PAVEMEU.
NT
PROPOSED � HYDRANT `-
FLOODPLAIN. HIS PROJECT IS NOT LOCATED W/TH/N FLOODPLAIN. LIMITS' AS SHOWN ON FLOOD EXISTING AND GUTTER EXISTING WATER VALVE
INSURANCE RATE MAP. COMMUNITY PANEL NUMBER 51003 0237 D. EFFECTIVE DATE.• � G-6
FEBRUARY 4. 2005.
PROPOSED CURB A I�iT`I�R
PROPOSED WATER VALVE
TRANSITION FROM SC -5 I�CLL-T`�S' -� I�C�i_I_-`iC�� PROPOSED °AtATE}� METER
LANDSCAPING. TO BE SUBMITTED UNDER SEPARATE COVER ��� if) � ��� EXISTING
E�#STItmiO STORM
TO BE SUBM/TIED UNDER SEPARATE COVER PROPOSED STORM SEWER �� �� ��
LIGHTING:
I. NANI�1' M (CG -12)
if �I�'I' SANITARY SEWER C Ci�:NC7-i'E`1 CG -12 ANDIOR JURISDICTIONAL
STANDARD RAMP CONSTRUCTION
LCST�ATECS�T OF `�i"L1, VT`U'T'
NO EVIDENCE OF A BUR/AL SITE WAS FOUND ON THIS PORTION OF PARCELS - -=
CHt�SE SANITARY SVFG
- � AKIN INIIA`it�H
THERE ARE NO STREAM BUFFER(S) WITH/N OR DIRECTLY ADJACENT TO THE PROJECT SITE. OT I�� INDICATES THE NUMBER OF TYPICAL PARKING SPACESEASEMENT
THE PROJECT SITE /S NOT LOCATED Wl'TH/N AN AGRICULTURAL -FORESTAL DISTRICT. LI BENCHMARK
THE PROJECT SITE /S LOCATED WITHIN THE WATERSHED. OF A PUBLIC WATER SUPPLY RESERVOIR. � CENTERLINE CRITICAL SLOPE
SLOPES �"CS T�Tm SEEDED, Ci€ISLf��9ET� & TAGiCTwi7
SI Ems` o Rte 250 Llili`S c� CLEARING AND/OR IN
L
—_> �iSi"INC S�'C�[" L�ii�ICiN +12.0
` �fEi�llm1 HES DAA° �3tJNT
�-_J CHiaCO SPOT LE�i,ATIt�IN .. 1.0
PROPOSED STREET NAME SIGN
i �,I10�[TS CF' DEMOLITION
......
EXISTING FLOODPLAIN - EXISTING SIGN U'
_ ST�sE;�€ BUFFER SE SIGN
EXISTING THEE iI�IF' DINE
SANITARY MANHOLE IDENTIFIER
VICINITY MAP
EXISTING EE Si"OI11 DRAIN STRUCTURE IDENTIFIER
DATE:
10-19-2018
SCALE:
NA
JOB:
8053
CONTOUR INTERVAL: NA
SHEET:
OF 05
; ��,
SCALE: 1=1000 FEET
-- -
-
Ua
U
CID rn=
N C,
0 LD TRAI L V1 LLAG E
Q2 Q=
, Z O
rr
U 2 0(too'g;o
>U_
O Q CCW JZ
Z OU > <
Filterc W w
�� w W
C) to �
J N
SC AND SWM NQ? QLO
W rc pec Urn
a ° CV
V WO OCOUNTY �
VIRGINIA 4% rc ��
COL W w °n
co o
Ucq
y Z�
O�
M
07 �
w
Z
OUj
O
--- —€
f
I
Z f f
O
Z N 7
F
A4
zz
LU LU
2 ? :E
{
0 0
z�z
0l0
Lu
8?8
Q O ui
SEWER
0 mj�
`o
Z
E
�1,TH OF vl1A
G?
rmy L. Taggart
Lic.$No.
o� 01 X 6419 �4
��SIONAL SSG
zW Q
Q � W z
J q rr Ir
0- J >
J �-- w w
Q J W
Q
U) LL
Q Q m w
�_ Q
LL
QI— Z Cc � ° o
U ~ �
0�zz
Wo W o
O 0
il� ?I"l i'; ��i���ig1 'tt9i4.
OLD TRAIL DRIVE ENTRY FEATUREPLAOFALBEMARLE,
SITE DATA SHEET INDEX
- � ---------__ -- � - -- - --, - SHEET 1 ---------- COVER SHEET
OWNER /DEVELOPER: MARCH MOUNTAIN PROPERTIES LLC CONTACT DAVE BROCKMANm r
1005 HEATHERCROFT CIRCLE, SU/TE 100 CELL: (702)-985-9088
SHEET 2 ---------- EXISTING CONDITIONS/EROSION CONTROL PLAN/DETAILSU_
CROZET, VA 22932 dove�nldtroilvilloge.com
PLAN PREPARER: ROUDABUSH, GALE, & Assoc�ATEs SHEET 3 ---------- DRAINAGE COMPLIANCE MAP
172 SOUTH PANTOPS DRIVE
CHARLOTTESVILLE, VA. 22902
SHEET 4 ---------- EROSION CONTROL NARRATIVE
(434)-977-0205
TAX MAP PARCEL No: A PORTION OF 055E -01-A3 and A PORTION OF 55E -01--A4 � SHEET 5 ---------- LANDSCAPE PLAN/DETAILS
o � Or
ZONING.
a�s
ZON/NG: NEIGHBORHOOD MODEL DISTRICT /N ACCORDANCE WITH PROFFERS OF ZMA-04-024 � a
APPROVED ON SEPTEMBER 14, 2005 d
MAGISTERIAL DISTRICT- WHITE HALL MAGISTERIAL DISTRICT �
�O
STORMWATER MANAGEMENT AS DEFINED BY THE OVERALL STORMWATER MASTER PLAN (WP0201600009), APPROVED
4/25/2016. THIS PROPOSED ENTRY FEATURE DEVELOPMENT ON BLOCKS 34 AND 19 REQUIRE ��
APPROX/MA TEL Y A TOTAL OF 0.03 LB/YR OF PHOSPHORUS REMOVAL. THERE IS CURREN R Y o �
SURPLUS OF TREATMENT ACREAGE IN THE SWM MASTER PLAN, WH/CH /S UNDERSTOOD TO BE a
SUFFICIENT COVERAGE FOR WATER QUALITY REQUIREMENTS UNTIL THE FINAL WPO PLAN FOR
THESE BLOCKS ARE APPROVED BY ALBEMARLE COUNTY ENGINEERING.
WATERSHED: L/CK/NGHOLE CREEK
TOPOGRAPHY. LOUISA AER/AL SURVEYS, AUGUST 2012
ROUDABUSH GALE & ASSOC. TOPOGRAPHIC FIELD SURVEY, OCTOBER 2018 � EXISTING INTERMEDIATE CONTOUR �-32 '----- -' � �
BENCHMARK: WEST TRAFFIC POLE CONC BASE = 708.2
EXISTING INDEX CONTOUR
3o EXISTING WATERLINE � TEE
PROPOSED CNt�t�� Zo I�CC41� WATERLINE V4%EP
/ TEE
DATUM: VERTICAL - NAVD 88, HORIZONTAL -NAD 83 --'
EXISTING � ANT EX. EP
EXISTING I�IF�E DINT
4
CRl71CAL SLOPES: NO CRITICAL SLOPES- EX/ST WITH/N THE PROJECT UMTS PROPOSED OF PAVEMEU.
NT
PROPOSED � HYDRANT `-
FLOODPLAIN. HIS PROJECT IS NOT LOCATED W/TH/N FLOODPLAIN. LIMITS' AS SHOWN ON FLOOD EXISTING AND GUTTER EXISTING WATER VALVE
INSURANCE RATE MAP. COMMUNITY PANEL NUMBER 51003 0237 D. EFFECTIVE DATE.• � G-6
FEBRUARY 4. 2005.
PROPOSED CURB A I�iT`I�R
PROPOSED WATER VALVE
TRANSITION FROM SC -5 I�CLL-T`�S' -� I�C�i_I_-`iC�� PROPOSED °AtATE}� METER
LANDSCAPING. TO BE SUBMITTED UNDER SEPARATE COVER ��� if) � ��� EXISTING
E�#STItmiO STORM
TO BE SUBM/TIED UNDER SEPARATE COVER PROPOSED STORM SEWER �� �� ��
LIGHTING:
I. NANI�1' M (CG -12)
if �I�'I' SANITARY SEWER C Ci�:NC7-i'E`1 CG -12 ANDIOR JURISDICTIONAL
STANDARD RAMP CONSTRUCTION
LCST�ATECS�T OF `�i"L1, VT`U'T'
NO EVIDENCE OF A BUR/AL SITE WAS FOUND ON THIS PORTION OF PARCELS - -=
CHt�SE SANITARY SVFG
- � AKIN INIIA`it�H
THERE ARE NO STREAM BUFFER(S) WITH/N OR DIRECTLY ADJACENT TO THE PROJECT SITE. OT I�� INDICATES THE NUMBER OF TYPICAL PARKING SPACESEASEMENT
THE PROJECT SITE /S NOT LOCATED Wl'TH/N AN AGRICULTURAL -FORESTAL DISTRICT. LI BENCHMARK
THE PROJECT SITE /S LOCATED WITHIN THE WATERSHED. OF A PUBLIC WATER SUPPLY RESERVOIR. � CENTERLINE CRITICAL SLOPE
SLOPES �"CS T�Tm SEEDED, Ci€ISLf��9ET� & TAGiCTwi7
SI Ems` o Rte 250 Llili`S c� CLEARING AND/OR IN
L
—_> �iSi"INC S�'C�[" L�ii�ICiN +12.0
` �fEi�llm1 HES DAA° �3tJNT
�-_J CHiaCO SPOT LE�i,ATIt�IN .. 1.0
PROPOSED STREET NAME SIGN
i �,I10�[TS CF' DEMOLITION
......
EXISTING FLOODPLAIN - EXISTING SIGN U'
_ ST�sE;�€ BUFFER SE SIGN
EXISTING THEE iI�IF' DINE
SANITARY MANHOLE IDENTIFIER
VICINITY MAP
EXISTING EE Si"OI11 DRAIN STRUCTURE IDENTIFIER
DATE:
10-19-2018
SCALE:
NA
JOB:
8053
CONTOUR INTERVAL: NA
SHEET:
OF 05
,I
01
P
�
°
I
I
I
i
I
I F
I
I
I
Cr)
� 00
I
I
VARIABLE WIDTH'
II
"
I I
I I
I
I
I
SLOPE EASEMENT S 11153'24" E'"
baa and 5b
I t
Tall fescue makes
(COUNTY)
w
+/-ARM CENTER = 727.4
+/- GROUND 707.6
I }�
DB 2886 PG 134-155 I /
J ✓
+/- GROUND 706.1 "'o
I
(PLAT)
3
C1 L0 00
of cover.
EX. TR F C
I
�
.s 7�tf S� C�
desired.
Crownvetch
Q
� I
U
M
Lo
Service lespedeza
013
a,
w
9•;2
►�
I
o
�
I
:=ca�.LJ
3.
X
`
� I
3 bu,
",-
i
C''7
d-
P
0)Q.
�
�
I
EXISTING FENCE TO BE REMOVED
Fall the year
Not required. not closer
stand of Tall
Rye (4)
2.5 bu.
0
following
than 4" if occasional
Tescue & Service
5-10-10
500
EXISTING LANDSCAPING TO BE REMOVED
establish- ment
mowing is desired, and
lespedeza, or
TO COINCIDE WITH PROPOSED
L
and every 4-5
LANDSCAPE PLAN BY ARCHITECT II
Birdsfoot Trefoil.
10/15
JZZ
TMP 055E0 -01-00-000A3 -`'-----�_�
years thereafter.
has matured.
Weeping
MARCH MOUNTAIN PROPERTIES, LLC
150 lbs,
�L'coco
Spring the year
BLOCKS 24, 33 AND 34 I�
Lovegrass &
X
DB 4954 PC 14 (PLAT) II
following
than 4" if occasional
Service lespedeza
DB 3973 PG 134-139 (PLAT)
II
500
11.5
establishment
EXISTING TREELINE ----
fairly uniform plant
X
X
TO REMAIN. THE PROPOSEDI '
and every 3-4
fall after sericea has
distribution
LANDSCAPE PLAN POSES NO
years thereafter.
IMPACT TO THE EXISTING WOODED
Red & chewings
20-10-10
250
AREA AND IS BASED ON THE y,
September, 30
Mow no closer than 2"
for red fescue and Ky
fescue, Kentucky
NATURAL TREE LINE FIELD LOCATED
4 lbs.
0.09
days later
December, May
BY RGA OCTOBER 2018 I
_-
20-10-10
100
2.3
20 -June -30, if
than 3" for fescue.
fescue mixture:
I
needed.
° X ING
APPROXIMATE LOCATION EXISTING MULCH BEDS TO BE REMOVED
OF OVERHEAD UTILITY -=
50 lbs.
1.15
114m1/2
LINE. CONTRACTOR TO EXISTING SIGNAGE TO BE REMOVED -
USE EXTREME CAUTION I -
-
11/5
X
WHEN OPERATING
11!1
X
m
I lam,/
Z
15' VEPCO ESMT.
o) DB 3656 PG 1
� Lo J
�
°
I I
I I
I I
I I
I I
I
I
I
Cr)
� 00
{
"
I I
I I
I
I
I
QCD
baa and 5b
I t
Tall fescue makes
®
CL CL
I lam,/
Z
15' VEPCO ESMT.
o) DB 3656 PG 1
VARIABLE WIDTH
SLOPE ESMT.
DB 2886 PG134
MANAGED SLOPES PER
ALBEMARLE COUNTY GIS
NOTE: PHOTOMETRIC AND LANDSCAPE
PLAN TO BE SUBMITTED UNDER
SEPARATE COVER
TW = TOP OF WALL
BW = BOTTOM OF WALL
VARIABLE WIDTH
SLOPE EASEMENT
(COUNTY)
DB 2886 PG 134-155
(PLAT)
j
CONSTRUCTION VEHICLES TO USED
THIS AREA FOR STAGING AND '
PARKING. EXTREME CAUTION TO BE
IIgF WHEN r1RIVImn n\/FR TNF
I
I
I
I
I
I
I
I '
I
I y ,
I
'i 113.93'
S 11 °53'24" E'' M µ
I Q
I% w
<u1 w..
� Lo J
�
Seeding Mixture
I •€ I
I
I
I
Cr)
� 00
{
%
�
I
I
I
QCD
baa and 5b
I t
Tall fescue makes
®
CL CL
w
+/-ARM CENTER = 727.4
+/- GROUND 707.6
I }�
+I -ARM CENTER = 725.9 U,
C0 Co
�1-0ap
+/- GROUND 706.1 "'o
I
LANDSCAPE PLAN (SUBMITTED UNDER
Q
C1 L0 00
of cover.
EX. TR F C
I
VARIABLE WIDTH
SLOPE ESMT.
DB 2886 PG134
MANAGED SLOPES PER
ALBEMARLE COUNTY GIS
NOTE: PHOTOMETRIC AND LANDSCAPE
PLAN TO BE SUBMITTED UNDER
SEPARATE COVER
TW = TOP OF WALL
BW = BOTTOM OF WALL
VARIABLE WIDTH
SLOPE EASEMENT
(COUNTY)
DB 2886 PG 134-155
(PLAT)
j
CONSTRUCTION VEHICLES TO USED
THIS AREA FOR STAGING AND '
PARKING. EXTREME CAUTION TO BE
IIgF WHEN r1RIVImn n\/FR TNF
I
I
I
I
I
I
I
I '
I
I y ,
I
'i 113.93'
S 11 °53'24" E'' M µ
I Q
I% w
<u1 w..
ISI
x-15' VEPCO ESMT.
DB 3656 PG 1
VARIABLE WIDTH
SLOPE ESMT.
DB 2886 PG134
MANAGED SLOPES PER
ALBEMARLE COUNTY GIS
F- ao
°H
Seeding Mixture
50.44' •
I
I
I
POLE CONIC BASE = 706.7
� 00
_
POLE CONC BASE = 706.7
�
I
I
I
+/- POLE TOP = 734.7
baa and 5b
POLE BASE = 707 1
+/-
/ POLE TOP = 733.2
Tall fescue makes
+/-ARM CENTER = 727.4
707.6
I•
+/-ARM CENTER = 727.4
+/- GROUND 707.6
0 m m
+I -ARM CENTER = 725.9 U,
+/- GROUND
+/- GROUND 706.1 "'o
I
LANDSCAPE PLAN (SUBMITTED UNDER
Q
�
of cover.
EX. TR F C
I
�
.s 7�tf S� C�
desired.
Crownvetch
Q
� I
U
M
Lo
Service lespedeza
013
a,
MARCH MOUNTAIN
9•;2
►�
LO
Birdsfoot trefoil
�
I
:=ca�.LJ
PC, I( BL l2fllll, aF.,
X
`
Oats
3 bu,
",-
i
C''7
d-
P
0)Q.
�
�
I
PLAN'.
Fall the year
Not required. not closer
stand of Tall
Rye (4)
2.5 bu.
3,22
following
than 4" if occasional
Tescue & Service
5-10-10
500
1'1.5
establish- ment
mowing is desired, and
lespedeza, or
�1'
L
and every 4-5
then in fall after seed
Birdsfoot Trefoil.
10/15
years thereafter.
has matured.
Weeping
150 lbs,
�L'coco
Spring the year
Not required. not closer
Lovegrass &
X
ISI
x-15' VEPCO ESMT.
DB 3656 PG 1
VARIABLE WIDTH
SLOPE ESMT.
DB 2886 PG134
MANAGED SLOPES PER
ALBEMARLE COUNTY GIS
706 TW
705.25 BW
I
707 TW
705.5 BW
u
II
706 TW
705.25 BW
11
707 TW
705.5 BW
i
707 TW
706 BW
CENTER
.`I. a I' TP PROPERTIES, LLC
W BLOCK19
nk .I
C)
". i i� '. DB 4968 PG 390-391 (PLAT)
', DB 3975 PG 223-228 (PLAT)
W SF
I
I. x 707 TW
705.5 BW
\\ SOIL UNE "P.)
` \ SOIL TYPE: 81 B
S
t yam,
--
�a %--------�- ��--------
` PROPOSED ENTRY---�----
_. FEATURE SIGNTYP
\ _ _ ( SOIL TYPE: 7B
- 727.5 -
�� EX:ASPHALT TRAIL
w EX. TRAFFIC POLE
,I .
EQUIPMENT IN VICINITY EX.SIGN -� U , _. " `- I EX.SIGN
off °H 3- - OH °" S 75°42 00 W 312.18 LINES. IH" °H' °" °" S 75'42'00" W 312.18 OF POWER LINES. OH OH °" OH OH °" 0 OH °" °" j c OH OH
OH OH OH € i 0 ON ° OH OH OH -- OH OH OH OH I OH OH OH' OH OH
_- OH ..I.., OH OH �•° -c . OH ---- -" OH H OH °" ° '�, '� OH
�,---- OH H OH °H OH OH OH I , y{ OH
OH OH OH OH �- 0 OH OH. OH H -- OH OH OH,
OH
OH �- OH
" �S 75°40'48.'. W 841.2,3' °" °" " °" °H °" EX. TRAFFIC CONTROL BOX �- °H �H 75.40'48_". W 841.2',,' " °H ° OH - r .r,
-- N 58°17'46" W r" I _------- °H °H �,� °H °" °H EX PFOFCTRIAN �qCW� TRAFFIC CONTROL BOX
Q N 58°17'46" W ;: -
OH _________ °H --------- rw.
F- ao
°H
Seeding Mixture
50.44' •
LIMITS OF DISTURBANCE
POLE CONIC BASE = 706.7
� 00
_
POLE CONC BASE = 706.7
�
I ,
+/- POLE TOP = 734.7
baa and 5b
POLE BASE = 707 1
+/-
/ POLE TOP = 733.2
Tall fescue makes
+/-ARM CENTER = 727.4
707.6
I•
+/-ARM CENTER = 727.4
+/- GROUND 707.6
0 m m
+I -ARM CENTER = 725.9 U,
+/- GROUND
+/- GROUND 706.1 "'o
I I
II
LANDSCAPE PLAN (SUBMITTED UNDER
Q
�
of cover.
EX. TR F C
... (' 706 TW
�
.s 7�tf S� C�
desired.
Crownvetch
Q
704 BW
TMP 055E0 -01-00-000A4
U
706 TW
EX.SIGN 704 BW
Do not mow crownvetch
Service lespedeza
013
a,
MARCH MOUNTAIN
706 TW
705.25 BW
I
707 TW
705.5 BW
u
II
706 TW
705.25 BW
11
707 TW
705.5 BW
i
707 TW
706 BW
CENTER
.`I. a I' TP PROPERTIES, LLC
W BLOCK19
nk .I
C)
". i i� '. DB 4968 PG 390-391 (PLAT)
', DB 3975 PG 223-228 (PLAT)
W SF
I
I. x 707 TW
705.5 BW
\\ SOIL UNE "P.)
` \ SOIL TYPE: 81 B
S
t yam,
--
�a %--------�- ��--------
` PROPOSED ENTRY---�----
_. FEATURE SIGNTYP
\ _ _ ( SOIL TYPE: 7B
- 727.5 -
�� EX:ASPHALT TRAIL
w EX. TRAFFIC POLE
,I .
EQUIPMENT IN VICINITY EX.SIGN -� U , _. " `- I EX.SIGN
off °H 3- - OH °" S 75°42 00 W 312.18 LINES. IH" °H' °" °" S 75'42'00" W 312.18 OF POWER LINES. OH OH °" OH OH °" 0 OH °" °" j c OH OH
OH OH OH € i 0 ON ° OH OH OH -- OH OH OH OH I OH OH OH' OH OH
_- OH ..I.., OH OH �•° -c . OH ---- -" OH H OH °" ° '�, '� OH
�,---- OH H OH °H OH OH OH I , y{ OH
OH OH OH OH �- 0 OH OH. OH H -- OH OH OH,
OH
OH �- OH
" �S 75°40'48.'. W 841.2,3' °" °" " °" °H °" EX. TRAFFIC CONTROL BOX �- °H �H 75.40'48_". W 841.2',,' " °H ° OH - r .r,
-- N 58°17'46" W r" I _------- °H °H �,� °H °" °H EX PFOFCTRIAN �qCW� TRAFFIC CONTROL BOX
Q N 58°17'46" W ;: -
OH _________ °H --------- rw.
, �-•• EX. PEDESTRIAN CROSSING SIGNAL
50.44
°H
Seeding Mixture
50.44' •
POLE CONIC BASE = 708.2 S 32°37 25 W
POLE CONIC BASE = 706.7
POLE ASEONC BASE . 708.2
POLE BASE = 708.6
S 32°37'25" W
32.42'
POLE CONC BASE = 706.7
POLE BASE = 708.6 32.42'
+/- POLE TOP = 734.7
POLE BASE = 707.1 J
+/- POLE TOP = 734.7
baa and 5b
POLE BASE = 707 1
+/-
/ POLE TOP = 733.2
Tall fescue makes
+/-ARM CENTER = 727.4
707.6
+/- POLE TOP = 733.2
+/-ARM CENTER = 725.9 -
+/-ARM CENTER = 727.4
+/- GROUND 707.6
EXISTING TREES LINE TO COINCIDE WITH
+I -ARM CENTER = 725.9 U,
+/- GROUND
+/- GROUND 706.1 "'o
400
LANDSCAPE PLAN (SUBMITTED UNDER
+/- GROUND 706.1 n
�
of cover.
EX. TR F C
Q
�
EX. TRAFFIC POLE
z
mAapV�p�
US ROUTE 250 ROCKFISH GAP TURNPIKE
VARIABILE WIDTH PUBLIC RIGHT-OF-WAY w
O
20 0
W
+/-ARM CENTER = 728. 1 EXISTING CONDITIONS SCALE: 1"-20'
umn
EE CONSTRUCTION ENTRANCEnPS
PERMANENT SEEDING MIXTURES FOR
THE PIEDMONT AREA
2
40 60
OPS PERMANENT SEEDING FERTILIZATION
AND MAINTENANCE
TABLE 24
Maintenance Fertilization for Permanent Seedings
Use Soil Test Recommendlation or Rates Shown Below
Seeding Mixture
Formulation
Lbs. per
Lbs. per
Time
Mowing
Lbs/1000
Yt9,-�DN,Z- #'', 4,1x r
Acre
1000 sf
baa and 5b
1B Al S
Tall fescue makes
10-10-10
500
11-5
Yearly, or as
*Not closer than 3" if
ftfi�?'Cr
e� ((C'
or
400
P.
needed fall
�
of cover.
:2
Q
�
.s 7�tf S� C�
desired.
Crownvetch
BY
U
Spring the year
Do not mow crownvetch
Service lespedeza
0-20-0
400
9•;2
following
establishment
X
Birdsfoot trefoil
10/15
X
-
PC, I( BL l2fllll, aF.,
X
`
Oats
3 bu,
2,21
ri"/�s. r',tlC�: L. .'lC'l:
�.PLES TI, FN
Fairly uniform
-
X
PLAN'.
Fall the year
40 60
OPS PERMANENT SEEDING FERTILIZATION
AND MAINTENANCE
TABLE 24
Maintenance Fertilization for Permanent Seedings
Use Soil Test Recommendlation or Rates Shown Below
Seeding Mixture
Formulation
Lbs. per
Lbs. per
Time
Mowing
Lbs/1000
CL
Acre
1000 sf
baa and 5b
CD
Tall fescue makes
10-10-10
500
11-5
Yearly, or as
*Not closer than 3" if
up 70% or more
or
400
9•;2
needed fall
occasional mowing is
of cover.
30-10-10
Q
�
Q
desired.
Crownvetch
BY
U
Spring the year
Do not mow crownvetch
Service lespedeza
0-20-0
400
9•;2
following
establishment
X
Birdsfoot trefoil
10/15
X
-
and every 4-5
X
-
Oats
3 bu,
2,21
years thereafter.
X
Fairly uniform
-
X
-
Fall the year
Not required. not closer
stand of Tall
Rye (4)
2.5 bu.
3,22
following
than 4" if occasional
Tescue & Service
5-10-10
500
1'1.5
establish- ment
mowing is desired, and
lespedeza, or
a eor
Rye Aus
and every 4-5
then in fall after seed
Birdsfoot Trefoil.
10/15
years thereafter.
has matured.
Weeping
150 lbs,
3.45
Spring the year
Not required. not closer
Lovegrass &
X
X
following
than 4" if occasional
Service lespedeza
5-10-10
500
11.5
establishment
mowing is desired, and
fairly uniform plant
X
X
X
and every 3-4
fall after sericea has
distribution
millet 5
years thereafter.
matured.
Red & chewings
20-10-10
250
5 8
September, 30
Mow no closer than 2"
for red fescue and Ky
fescue, Kentucky
Weeping P g
lovegrass ()
4 lbs.
0.09
days later
December, May
bluegrass; and closer
bluegrass, hard
20-10-10
100
2.3
20 -June -30, if
than 3" for fescue.
fescue mixture:
Annual
needed.
EROSION AND SEDIMENT CONTROL LEGEND
SI 3.10 X SILT FENCE
D 3.39 D C
TS 3.31 TS
DUST CONTROL
TEMPORARY SEEDING I
P S 3 32 PS PERMANENT SEEDING
t
US ROUTE 250 ROCKFISH GAP TURNPIKE
dVARIABLE WIDTH PUBLIC WAY1
/_ 1
+/-ARM CENTER 728.1PROPOSED CONDITIONS
�_■ ■
■
SCALE: -1
TEMPORARY SEEDING MIXTURES FOR
Ts THE PIEDMONT AREA sF SILT FENCE
SUGGESTED TEMPORARY SEEDING MIXTURE
FERTILIZER: 10-20-10: 1,000 LBS/ACRE
SEPTEMBER -FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/AICRE
FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAM MILLET 50
LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK.
20 40 601
a("l' e/ � r '_ C^ti F 166 i p f °r fTf 3T 0 �'•°a ( y'' Sy' `l
€vy �.�•
�_ ' €,._. i
TABLE 26
TEMPORARY SEEDING S BY RATES; DEPTHS, AND DATES
A_ L; �° .?.
Seeding Rate
Planting depth g9 )
Seeding tones Q and Seeding (Gate L3)
Species L)
Per
Lbs/1000
CL
7a and 7b
6b
baa and 5b
CD
acre
Sq. f1
(Inches)
...... _
211- 061 W15
....__ ........ .......
311- 615- W15-
...._... ...... ......_.
3115 665-
J
d
m
4/30 111/30
4130 6114 11 /15
5/31 7/31
Choose one:
Q
�
Q
~
BY
U
BY
Z
z
Earley
2.5 bu..
180
1-2
X
-
10/15
X
-
10/15
X
-
Oats
3 bu,
2,21
1-2
X
--
-
X
-
-
X
-
Rye (4)
2.5 bu.
3,22
1-2
X
-•
X
X
-
X
X
-
a eor
Rye Aus
10/15
10115
150 lbs,
3.45
1
X
X
X
X
X
X
oxtail
X
X
X
X
X
X
X
X
millet 5
Weeping P g
lovegrass ()
4 lbs.
0.09
1/41/2
_
X
_
X
_
_
X
Annual
r eyegrasa,
50 lbs.
1.15
114m1/2
X
-
11/5
X
m
11!1
X
m
Millet (7)
50 lbs.
1,15 j
1/2
_
X
_
_
X
a
6
X
(1) Applicable on elopes of 3:1 or flatter
(2) Refer to figure A - Adoptee! from USDA, ARS Miscellaneous Publication ##1475, .January 199€0
(3) Between fall and spring seeding elates, use mulch only if ground is f oxen and reseed when tthavved
(4) May be used as a nurse crop for late fall/early winter permanent seedings, add 56 lbs/ac. to ithe permanent
seeding mixture
(4) Maryland State Highway Administration Temporary Seed Mix
() May be used as a nurse crop for raid -summer permanent seedings. Add 2 lbs/ac to permamer€'t seed mix,
(6) May be used as a nurse crop for rnid-summer permanent seedings. Add 10 lbs/ac. to the pe,rrnanent seeding
mix.
SUGGESTED TEMPORARY SEEDING MIXTURE
FERTILIZER: 10-20-10: 1,000 LBS/ACRE
SEPTEMBER -FEBRUARY 15: 50% ANNUAL RYE & 50% WINTER RYE 100 LBS/AICRE
FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAM MILLET 50
LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK.
20 40 601
a("l' e/ � r '_ C^ti F 166 i p f °r fTf 3T 0 �'•°a ( y'' Sy' `l
€vy �.�•
�_ ' €,._. i
�.f • •,
.1 ? A_. 1 -i _L g v ,_.9 , 1�
A_ L; �° .?.
J d` 0 Li P3 /
�(
0 7
1 7 ,9 F ?,.
S &... d.g e. �Y
1- r;l':'1 THE ST,,kK_ES,
-2, 1 tC VA Ia A. 45l 4 E 1 1 N H
CL
LPS{LC)PE ALONG THELINE OF
I-
7 I `411ES,
STAKES,
CD
I t $,
>
W
Q
J
d
m
Ir
Q
�
Q
~
O
U
Z
z
�
t�
W
J
W
0
o
O
w
I
�'.I.,(?dt' � �• ����,�.li!.:..
.ate'"' �, I
I
7l
:3. S'T PLE FILTER ER MA`IERI L
4. BA KIWI L AND CW,1P QCT
TO STAKES AND .,R`i'1{ IND
I}l1, EEC EXCAVATED SO[L,.
IT INTO THE 'IRENCIH,
Shin^ ood and W}ianl
SUGGESTED PERMANENT SEEDING MIXTURE CURB PROTECTION DETAIL
LIME: 2 MARCH-MAYOS15:CKENT KRE ENTUCKY FESCUE 0200 LBS/ACR-10 1,000 ES ANNUAL RYE 20 LBS/ACRE MAY FOR CONSTRUCTION ENTRANCE
16 -AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LB3S/ACRE
AUGUST 16 -OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 2(0 LBS/ACRE -
NOVEMBER -FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE „
i
i
* GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE FOR
CURB PROTECTION IN CONJUNCTION WITH CONSTRUCTION ENTRANCE
e
Ua
� O
U
rnCO
CO
N C)
Q�
zO
�� j
U U
>O
O O 1W JZ
Z O caQL j Q
? "' W
w
"V UQ _jN
Q Q? Q �
W pcc Urn
nI
v0� p d -
V 4j � �
? oOC Q
t o
0 O0 u_
y aW wLf)
U�
'K Z
o
Wco
W o�
��
00
rnLU
LU
O
a W =
a
�y`tH OF yrs
Vol
Jimmy L. Taggart
Lic.$$No. Al
��0 01 �i6419
��SSIONAL ET��ti
Q
W
V
W
Q
E-
J
qvCC
SHEET:
2 OF 05
CL
J
I-
>
J
CD
C
>
W
Q
J
LL
m
Ir
Q
�
Q
~
O
U
Z
z
�
t�
W
J
W
0
o
O
w
DATE:
10-19-2018
SCALE:
1" : 20'
JOB:
8053
CONTOUR INTERVAL 2 FEET
SHEET:
2 OF 05
EROSION AND SEDIMENT CONTROL NARRATIVE
PRIOR TO CONSTRUCTION
1. OWNER SHALL POST SURETY BONDS FOR CONSTRUCTION, EROSION &
SEDIMENT CONTROL.
2. CONTRACTOR SHALL OBTAIN PERMITS TO WORK WITHIN STATE
RIGHT-OF-WAY (VDOT LAND -USE PERMIT). BONDING FOR WORK WITHIN THE
VDOT RIGHT-OF-WAY MAY BE REQUIRED TO OBTAIN THE PERMIT.
3. CONTRACTOR SHALL COORDINATE WITH OWNER TO OBTAIN VSMP PERMITS,
AS REQUIRED BY THE STATE DEPARTMENT OF ENVIRONMENTAL QUALITY
(DEQ).
4. CONTRACTOR SHALL OBTAIN LAND DISTURBANCE PERMIT FROM THE COUNTY
OF ALBEMARLE PRIOR TO BEGINNING CONSTRUCTION.
5. A PRE -CONSTRUCTION MEETING WITH THE ENGINEER, THE CERTIFIED LAND
DISTURBER, AND THE ENVIRONMENTAL INSPECTOR MAY ALSO BE REQUIRED.
ALLOW 72 HOURS FOR COORDINATION AND SCHEDULING OF
PRE -CONSTRUCTION MEETING.
PROJECT DESCRIPTION
LANDSCAPING WALLS, ENHANCED
THIS PROJECT PROPOSES TO ADD 4 DECORATIVE,
LANDSCAPING AND SIGNAGE AT THE ENTRANCE OF OLD TRAIL DRIVE AS AN
ENTRY FEATURE TO OLD TRAIL VILLAGE. LIMITS OF DISTURBANCE WILL INCLUDE
APPROX. 0.20 ACRES.
EXISTING SITE CONDITIONS
CURRENT CONDITIONS OF THE AREA CONSISTS OF MODERATE TREE COVER,
HEDGES, WOODEN FENCE, SIDEWALK, AND AN "OLD TRAIL VILLAGE" SIGN ON THE
NORTH WEST ENTRANCE CORNER OF OLD TRAIL DRIVE.
ADJACENT AREAS
THE PARCELS ON EITHER SIDE OF OLD TRAIL DRIVE IS OWNED BY MARCH
MOUNTAIN PROPERTIES, LLC AND IS UNDEVELOPED WOODED LAND.
OFF-SITE AREAS
ALL EXCESS MATERIAL GENERATED AS PART OF THIS PROJECT SHALL BE HAULED
TO A LOCATION WITHIN THE OLD TRAIL DEVELOPMENT THAT HAS BEEN APPROVED
BY THE COUNTY OF ALBEMARLE COMMUNITY DEVELOPMENT DEPARTMENT.
SOILS
81B - THURMONT LOAM, (2% TO 7% SLOPES)
DEEP, NEARLY LEVEL AND WELL DRAINED. STARTING AT SURFACE LAYER TO
SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM, CLAY LOAM, LOAM AND COBBLY
SANDY LOAM. PERMEABILITY IS MODERATE WHILE AVAILABLE WATER CAPACITY IS
MODERATELY HIGH TO HIGH. HAZARD OF EROSION IS SLIGHT.
7B - BRADDOCK LOAM, (2% TO 7% SLOPES)
DEEP, NEARLY LEVEL AND WELL DRAINED. STARTING AT SURFACE LAYER TO
SUBSTRATUM, SOIL LAYERS CONSIST OF LOAM AND CLAY. PERMEABILITY IS
MODERATE WHILE AVAILABLE WATER CAPACITY IS MODERATELY HIGH. HAZARD OF
EROSION IS SLIGHT.
CRITICAL AREAS
A. WETLANDS AND STREAM CROSSINGS
N0NE .
B. STEEP SLOPES
NANE.
STRUCTURAL PRACTICES
1. SAFETY FENCE (3.01) - A TEMPORARY SAFETY FENCE SHALL BE
CONSTRUCTED WHERE DEEMED NECESSARY DURING CONSTRUCTION TO
PROTECT THE MANHOLES AND SANITARY LINE FROM CONSTRUCTION TRAFFIC.
2. TEMPORARY CONSTRUCTION ENTRANCE (3.021 - A TEMPORARY
CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT SITE ENTRANCE OFF OF
OLD TRAIL DRIVE.
3. ROAD STABILIZATION (3.03) - ACCESS ROADS, PARKING AREAS, AND OTHER
ON-SITE VEHICLE TRANSPORTATION ROUTES SHALL BE STABILIZED WITH
STONE IMMEDIATELY AFTER GRADING.
4. SILT FENCE BARRIER (3.05) - SILT FENCE BARRIERS WILL BE INSTALLED
TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE EROSION AND
SEDIMENT CONTROL PLAN.
5. SUPER SILT FENCE BARRIER - WIRE -REINFORCED SILT FENCE BARRIER WILL
BE INSTALLED TO FILTER RUNOFF FROM SHEET FLOW AS INDICATED ON THE
EROSION AND SEDIMENT CONTROL PLAN.
VEGETATIVE PRACTICES
1. SURFACE ROUGHENING (3.29) - ALL AREAS WITH A GRADE STEEPER THAN
3:1 SHALL BE STAIR -STEP GRADED OR GROOVED (PLATE 3,29-4) TO AID IN
GRASS ESTABLISHMENT, INCREASE INFILTRATION, AND TO SLOW RUNOFF
VELOCITIES.
2. TOPSOILING & STOCKPILING (3.30) - TOPSOIL WILL BE STRIPPED FROM
AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILES ARE
TO BE STABILIZED WITH TEMPORARY VEGETATION OR TO HAVE SILT FENCE
INSTALLED ALONG THE LOWER PERIMETER TO PROTECT DOWNSTREAM AREAS.
3. TEMPORARY SEEDING (3.31) - AREAS NOT BROUGHT TO FINAL GRADE FOR
A PERIOD OF MORE THAN 14 DAYS SHALL BE STABILIZED WITH A
TEMPORARY SEED MIXTURE ACCEPTABLE FOR THAT TIME OF YEAR. CRIMPING,
PUNCH ROLLER -TYPE ROLLERS, OR TRACK WALKING MAY BE USED TO
INCORPORATE STRAW MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE
USED.
4. PERMANENT SEEDING (3.32) - AREAS BROUGHT TO FINAL GRADE OR THOSE
CONSTRUCTION AREAS THAT WILL REMAIN DORMANT FOR YEAR OR MORE
SHALL BE STABILIZED WITH A PERMANENT SEED MIXTURE ACCEPTABLE TO
THAT TIME OF YEAR. PREPARE SURFACE WITH APPROVED TREATMENT AND
ADDITIVES PRIOR TO APPLYING SEED.
5. MULCH (3.35) - PLANT RESIDUES OR OTHER SUITABLE MATERIALS SHALL
BE APPLIED TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE
OVERLAND FLOW VELOCITIES. THIS PRACTICE SHOULD BE APPLIED TO ALL
SEEDING OPERATIONS, OTHER PLANTER MATERIALS WHICH DO NOT PROVIDE
ADEQUATE SOIL PROTECTION BY THEMSELVES, AND BARE AREAS WHICH
CANNOT BE SEEDED DUE TO THE SEASON BUT WHICH STILL NEED
PROTECTION TO PREVENT SOIL LOSS. CRIMPING, PUNCH ROLLER -TYPE
ROLLERS, OR TRACK WALKING MAY BE USED TO INCORPORATE STRAW
MULCH INTO THE SOIL ON SLOPES IF STRAW IS TO BE USED.
6. EROSION CONTROL BLANKETS (3.36) - EROSION CONTROL BLANKETS IN
CONJUNCTION WITH PERMANENT SEEDING WILL BE INSTALLED ON ALL SLOPES
STEEPER THAN 3:1 FOLLOWING GRADING. EROSION CONTROL BLANKETS WILL
ALSO BE INSTALLED IN DITCHES WHERE POTENTIAL EROSIVE VELOCITIES MAY
EXIST AS DETERMINED BY ENGINEERING CALCULATIONS. THIS WILL PROTECT
FROM RILL AND GULLY EROSION.
7. TREE PROTECTION (3.38) - THE TREE FENCE BARRIER WILL BE INSTALLED
TO PROTECT THE TREES OUTSIDE OF THE LIMITS OF DISTURBANCE AS
INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN.
8. DUST CONTROL (3.39) - DUST CONTROL METHODS MUST BE USED TO
REDUCE THE AMOUNT OF AIRBORNE DUST DURING ALL PHASES OF
CONSTRUCTION WHERE SOIL IS EXPOSED OR DISTURBED.
MANAGEMENT STRATEGIES
1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BE
SEQUENCED, AND ALSO BEGIN AND END AS QUICKLY AS POSSIBLE.
2. THE CONSTRUCTION ENTRANCE AND PERIMETER EROSION CONTROL
MEASURES SUCH AS TREE PROTECTION AND SILT FENCE SHALL BE
INSTALLED AS THE FIRST STEP OF DISTURBANCE.
3. SEDIMENT BASIN MEASURES SHALL BE INSTALLED WITH PERIMETER SILT
FENCE PRIOR TO ANY GRADING AND SHALL BE SEEDED AND MULCHED
IMMEDIATELY FOLLOWING INSTALLATION.
4. THE SEDIMENT BASIN SHALL BE CHECKED FOR SEDIMENT ACCUMULATION
AFTER EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE
k
REMOVED WHEN IT REACHES ONE-HALF OF THE DESIGN VOLUME OF THE
WET STORAGE.
5. TEMPORARY SEEDING OR OTHER STABILIZATION METHODS, SUCH AS BASE
AGGREGATE WILL FOLLOW IMMEDIATELY AFTER REACHING FINAL GRADES.
6. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A
GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND
RE -SEEDED AS NEEDED TO ESTABLISH GROWTH..
7. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION
AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES.
8. DURING FINE GRADING OPERATIONS, MAINTAIN ALL DIVERSION DITCHES TO
THE SEDIMENT S EN TRAPS. THE SEDIMENT TRAPS SHALL REMAIN FUNCTIONAL
THROUGHOUT INSTALLATION OF THE STORM SEWER INLETS, PIPES,OUTFALLS.
9. INSTALL SILT FENCE INLET PROTECTION TRAPPING MEASURES AT EACH INLET
LOCATION WITHIN THE DITCH WHERE APPLICABLE.
10. WHILE THE SEDIMENT BASIN REMAINS FUNCTIONAL FOR THE DISTURBED
AREA, INSTALL THE PERMANENT EXTENDED DETENTION PONDS AND OUTLET
PROTECTION MEASURES PER THE SPECIFICATIONS.
11. AFTER BEING NOTIFIED BY THE EROSION AND SEDIMENT CONTROL
ADMINISTRATOR THE TEMPORARY EROSION D SEDIMENT CONTROLS CAN
N A N
BE CLEANED UP OR REMOVED, AND THE SEDIMENT TRAPS CAN BE FILLED IN
AND SEEDED, THEREBY REDIRECTING DRAINAGE TO THE PERMANENT
FACILITIES.
12. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY
BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE
STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION. THE
EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE THAT ITS
LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS SHALL BE
KEPT MOWN BELOW A HEIGHT OF 15" AND THE OUTLET SHOULD BE
CHECKED FOR CLOGGING. THE DAM SECTION SHALL BE KEPT FREE OF
SAPLINGS OR TREES.(REFER TO THE ADDITIONAL MAINTENANCE
SPECIFICATIONS)
PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH STRAW &
SEED IMMEDIATELY FOLLOWING FINISHED GRADE. SEEDING SHALL BE DONE WITH
KENTUCIKY 31 TALL FESCUE IN ACCORDANCE TO STANDARD AND SPECIFICATION
3.32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK. ANY FERTILIZER AND LIME APPLICATIONS SHALL BE IN ACCORDANCE
WITH SOIL TEST RESULTS. ALL SEEDED AREAS WILL BE STRAW MULCHED TO
PROTECT AGAINST RILL EROSION AND TO PRESERVE SOIL MOISTURE THAT WILL
ENHANCE SEED GERMINATION. CRIMPING, PUNCH ROLLER -TYPE ROLLERS, OR
TRACK 'WALKING MAY BE USED TO INCORPORATE STRAW MULCH INTO THE SOIL ON
SLOPES IF STRAW IS TO BE USED.
EROSION CONTROL MAINTENANCE
1. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING
ITEMS WILL BE CHECKED IN PARTICULAR:
2. THE CONSTRUCTION ENTRANCE SHALL BE CHECKED DAILY FOR SOIL
BUILDUP. IF THE ENTRANCE BECOMES CLOGGED WITH SOIL AND FAILS TO
PREVENT THE TRANSPORTATION OF SOIL ONTO THE ROADWAY, ADDITIONAL
STONE, REPLACEMENT OF STONE, OR A WASH -RACK MAY BE REQUIRED.
3. SILT FENCE SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND
AT LEAST DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION SHALL BE
PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END RUNS
AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR
BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE
AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED
PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM
EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY
ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS
REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED
SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED,
AND SEEDED.
4. DIVERSION DIKES SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS
MADE TO THE DIKE, FLOW CHANNEL, OUTLET, OR SEDIMENT TRAPPING
FACILITY AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM
EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND
REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR
OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING
DAY.
5. STORMWATER CONVEYANCE CHANNELS (WHERE APPLICABLE):
5.1. GRASS LINED CHANNELS - DURING THE INITIAL ESTABLISHMENT,
GRASS LINED CHANNELS SHOULD BE REPAIRED IMMEDIATELY AND
RE-ESTABLISHED IF NECESSARY. AFTER GRASS HAS BECOME
ESTABLISHED, THE CHANNEL SHOULD BE CHECKED PERIODICALLY TO
DETERMINE IF THE GRASS IS WITHSTANDING FLOW VELOCITIES WITHOUT
DAMAGE. IF THE CHANNEL IS TO BE MOWED, IT SHOULD BE DONE IN A
MANNER THAT IT WILL NOT DAMAGE THE GRASS.
5.2. RIPRAP-LINED CHANNELS - RIPRAP LINED CHANNELS SHOULD BE
CHECKED PERIODICALLY TO ENSURE THE SCOUR IS NOT OCCURRING
BENEATH FABRIC UNDERLINING OF THE RIPRAP LAYER. THE CHANNEL
SHOULD ALSO BE CHECKED TO DETERMINE THE STONES ARE NOT
DISLODGED BY LARGE FLOWS.
5.3. IF SEDIMENT IS DEPOSITED IN A GRASS -LINED CHANNEL, IT SHOULD
BE REMOVED PROMPTLY TO PREVENT DAMAGE TO THE GRASS.
SEDIMENT DEPOSITED IN A RIPRAP CHANNEL SHOULD BE REMOVED
WHEN IT REDUCES THE CAPACITY OF THE CHANNEL.
6. CHECK DAMS SHALL BE CHECKED FOR SEDIMENT ACCUMULATION AFTER
EVERY RUNOFF PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED
WHEN IT REACHES ONE-HALF OF THE ORIGINAL HEIGHT OF THE MEASURE.
REGULAR INSPECTIONS SHALL BE MADE TO INSURE THE CENTER OF EACH
DAM IS LOWER THAN THE EDGES. EROSION CAUSED BY HIGH FLOWS AROUND
THE EDGES OF THE DAM SHOULD BE CORRECTED IMMEDIATELY.
7. THE EARTHEN EMBANKMENTS SHALL BE CHECKED REGULARLY TO ENSURE
THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY
EROSION OR CONSTRUCTION EQUIPMENT.
8. THE STORMWATER MANAGEMENT FACILITIES SHOULD BE CHECKED REGULARLY
BY THE HOMEOWNERS ASSOCIATIONS TO ENSURE THAT THEY ARE
STRUCTURALLY SOUND AND HAVE NOT BEEN DAMAGED BY EROSION.
9. THE EMERGENCY SPILLWAY SHALL BE CHECKED REGULARLY TO ENSURE
THAT ITS LINING IS WELL ESTABLISHED AND EROSION RESISTANT. GRASS
SHALL BE KEPT MOWN BELOW A HEIGHT OF 15" AND THE OUTLET SHOULD
BE CHECKED FOR CLOGGING.
10. THE DAM SECTION SHALL BE KEPT FREE OF SAPLINGS OR TREES.(REFER TO
THE ADDITIONAL MAINTENANCE SPECIFICATIONS)
11. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A
GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND
RE -SEEDED AS NEEDED. IN THE EVENT THAT THE APPLIED SEEDING FAILS
TO TAKE HOLD, BLANKET MATTING SHALL BE PLACED IN APPROPRIATE
AREAS DEEMED NECESSARY BY THE ENGINEER OR EROSION CONTROL
INSPECTOR.
SEQUENCE OF CONSTRUCTION
1. AFTER OBTAINING ALL REQUIRED PERMITS THE CONTRACTOR SHALL
COORDINATE A PRE -CONSTRUCTION MEETING, ALLOWING 72 HOURS FOR ITS
COORDINATION.
2. CLEARING AND GRUBBING SHALL FIRST BE LIMITED TO THAT NECESSARY TO
INSTALL SILT FENCE. ALL PERIMETER CONTROLS MUST BE MADE FUNCTIONAL
PRIOR TO ANY UPSLOPE LAND DISTURBANCE THAT TAKES PLACE.
2.1. SILT FENCE SHALL BE INSTALLED ON THE DOWNHILL SIDE OF THE
INTENDED LIMITS OF DISTURBANCE.
3. PRIOR TO ADDITIONAL CLEARING AND GRUBBING, THE CONTRACTOR SHALL
COORDINATE INSPECTIONS, AS REQUIRED BY THE COUNTY OF ALBEMARLE.
4. CLEAR AND GRUB THE REMAINDER OF PROJECT AREA.
4.1. THE LAND DISTURBANCE SHALL BE RESTRICTED TO THE LIMITS OF
DISTURBANCE SHOWN IN THE APPROVED EROSION CONTROL PLANS.
5. STOCKPILE TOPSOIL ON A PERMITTED SITE WITH A SWPPP WITHIN AN AREA
ON THE PROPERTY OWNED BY OLID TRAIL. INSTALL SILT FENCE AT THE
PERIMETER OF STOCKPILE(S).
6. DENUDED AREAS SHALL DRAIN TO AN APPROVED EROSION CONTROL
MEASURE AT ALL TIMES DURING CONSTRUCTION.
7. CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE
ABLEMARLE COUNTY SERVICE AUTHORITY, PRIOR TO MAKING THE SEWER
SYSTEM OPERATIONAL.
8. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO ALL
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON
ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO [DENUDED AREAS THAT MAY NOT BE AT
i
FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS.
PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE
LEFT DORMANT FOR MORE THAN (ONE YEAR.
9. LIME, FERTILIZE AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL
DENUDED AREAS IMMEDIATELY AFTER ACHIEVING FINAL GRADES.
10. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL RECEIVE STABILIZATION
WITH LANDSCAPING VEGETATION HARDIER THAN GRASS, WHICH WILL NOT
REQUIRE MOWING.
11. AFTER SITE IS STABILIZED AND PERMISSION IS OBTAINED FROM THE EROSION
CONTROL INSPECTOR, REMOVE SILT FENCING AND OTHER REMAINING EROSION
CONTROL MEASURES.
EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON
ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO [DENUDED AREAS THAT MAY NOT BE AT
FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS.
PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE
LEFT DORMANT FOR MORE THAN (ONE YEAR.
CONTRACTOR SHALL ESTABLISH A STABILIZED SITE, AND NOT ALLOW ANY
SEDIMENT TO EXIT THE PROJECT LIMITS..
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW
AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON
SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED
FROM THE PROJECT SITE.
CONTRACTOR TO PROTECT STOCKPILE AREAS WITH SILT FENCE.
3. A PERMANENT VEGETATIVE COVER' SHALL BE ESTABLISHED ON DENUDED
AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT
EROSION.
CONTRACTOR SHALL ESTABLISH A VEGETATIVE COVER ON ALL DENUDED AREAS.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND
OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED
AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE
FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
CONTRACTOR SHALL ESTABLISH THE PERIMETER CONTROLS OF SUPER SILT FENCE
AS THE FIRST STEP OF THE LANDS DISTURBANCE FOR THIS PROJECT.
5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES
SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AFTER EACH
RAINFALL EVENT.
6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND
CONSTRUCTED BASED UPON THE 'TOTAL DRAINAGE AREA TO BE SERVED BY
THE TRAP OR BASIN.
THERE ARE NO SEDIMENT TRAPS OR BASINS PROPOSED.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC
YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL
DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW
FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL
BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF
A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE
AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE
STRUCTURAL INTEGRITY OF THE BASIN DURING A 25 -YEAR STORM OF
24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS
SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS
EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A
MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE
ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION
SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL
THE PROBLEM IS CORRECTED.THERE ARE NO PROPOSED CUT OR FILL
SLOPES. HOWEVER, THE CONTRACTOR IS TO RESTORE THE PROJECT AREA
TO EXISTING GRADE. IF THE AREAS WITH NATURALLY STEEP SLOPES ARE
FOUND TO BE ERODING EXCESSIVELY AFTER ONE YEAR, CONTRACTOR IS TO
PROVIDE ADDITIONAL SLOPE STABIILIZING MEASURES UNTIL THE PROBLEM IS
CORRECTED.
8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES
UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT
CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.MAXIMIZE SHEETFLOW AND
GROUNDWATER INFILTRATION
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR
OTHER PROTECTION SHALL BE PROVIDED. CONTRACTOR TO NOTIFY ENGINEER
AND COUNTY EROSION CONTROL INSPECTOR.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING
CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER
CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED
OR OTHERWISE TREATED TO REMOVE SEDIMENT.THERE ARE NO STORM SEWER
INLETS PROPOSED.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR
PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY
REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING
CHANNEL.THERE ARE NO STORMWATER CONVEYANCE CHANNELS OR PIPES
PROPOSED.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL
BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT
AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE
DURING CONSTRUCTION. NON -ERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE
USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER
MATERIALS. CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY
STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM
CROSSINGS.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES
MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR
STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIAL SHALL BE
PROVIDED. CONTRACTOR SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY
STREAM CROSSING REQUIREMENTS FOR THE TWO INTERMITTENT STREAM
CROSSINGS.
14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO
WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.CONTRACTOR
SHALL FOLLOW FOLLOW ALL APPLICABLE FEDERAL, STATE AND LOCAL
REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS.
15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED
IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. CON TRACTOR
SHALL FOLLOW THE VESCH CHAPTER 3.25 UTILITY STREAM CROSSING
REQUIREMENTS FOR THE TWO INTERMITTENT STREAM CROSSINGS.
16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH
THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED
THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN . A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING
STREAMS OR OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY
COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
E. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS
CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.CONTRACTOR
TO ADHERE TO THE APPLICABLE STANDARD FOR PRIVATE AND PUBLIC UTILITY
INSTALLATION.
17. WHERE CLE ACCESS ROUTE CONSTRUCTION VEHICLE S INTERSECT PAVED OR
R V H
PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT
OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE
ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH
DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELLING OR
SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.
STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN
THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT
LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.CONTRACTOR
SHALL MAKE PROVISIONS TO KEEP ADJACENT ROADS CLEAN FROM SOIL
BUILD-UP,
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHIALL BE
REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE VESCP AUTHORITY.A
TRAPPED SEDIMENT AND THE
DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY
MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.CONTRACTOR SHALL STABILIZE SITE, AND
OBTAIN INSPECTOR APPROVAL PRIOR TO REMOVING EC MEASURES. UPON
APPROVAL OF THE ENVIRONMENTAL INSPECTOR, INSTALL INFILTRATION
AREAS AND CONNECT ROOF DRAINS.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES
SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND, DAMAGE
DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF
STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR
DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA.
STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE
NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND
SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: THIS PROJECT DOES
NOT INCLUDE ANY ADDITIONAL IMPERVIOUS SURFACES AND THE PROJECT
AREA WILL BE RESTORED TO ITS EXISTING CONIDTIONS. THEREFORE WILL NOT
PRODUCE ANY ADDITIONAL STORMWATER RUNOFF.
A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL
BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN -[MADE
RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE 'SITES
WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM
STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL
BE PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED USING THE
VSMP CHANNEL PROTECTION CRITERIA. STORMWATER DISCHARGES ARE
CLASSIFIED INTO ONE OF THREE TYPES OF CHANNEL.
(1) "MANMADE STORMWATER CONVEYANCE SYSTEM" MEANS A PIPE,
DITCH, VEGETATED SWALE, OR OTHER STORMWATER CONVEYANCE
SYSTEM CONSTRUCTED BY MAN EXCEPT FOR RESTORED STORMWATER
CONVEYANCE SYSTEMS OR,
(A) THE MANMADE STORMWATER CONVEYANCE SYSTEM SHALL
CONVEY THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE
TWO-YEAR EVENT WITHOUT CAUSING EROSION OF THE SYSTEM
DETENTION OF THE STORMWATER OR DOWNSTREAM IMPROVEMENTS
MAY BE INCORPORATED INTO THE APPROVED LAND -DISTURBING
ACTIVITY TO MEET THIS CRITERIA AT THE DISCRETION OF THE
STORMWATER PROGRAM ADMINISTRATIVE AUTHORITY.
(B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED
STORMWATER FLOW TO NATURAL STORMWATER CONVEYANCE
SYSTEMS SHALL BE MET.
QDEVELOPED <= I.F. * (QPRE-DEV. * RVPRE-DEV.) /
RVDEVELOPED
UNDER NO CONDITION SHALL QDEVELOPED > Q PRE -DEW.
NOR SHALL QDEVELOPED BE REQUIRED TO BE LESS THAN THAT
QFOREST * RVPRE-DEV.)/RVDEVELOPED
OR IN ACCORDANCE WITH ANOTHER METHODOLOGY THAT IS
DEMONSTRATED BY THE VSMP AUTHORITY TO ACHIEVE EQUIVALENT
RESULTS AND IS APPROVED BY THE BOARD.
(2) "NATURAL STORMWATER CONVEYANCE SYSTEM" MEANS THE MAIN
CHANNEL OF A NATURAL STREAM AND THE FLOOD -PRONE AREA
ADJACENT TO THE MAIN CHANNEL OR,
(3) "RESTORED STORMWATER CONVEYANCE SYSTEM" MEAN'S A
STORMWATER CONVEYANCE SYSTEM THAT HAS BEEN DESIGNED AND
CONSTRUCTED USING NATURAL CHANNEL DESIGN CONCEPTS.
RESTORED STORMWATER CONVEYANCE SYSTEMS INCLUDE THE MAIN
CHANNEL AND THE FLOOD -PRONE AREA ADJACENT TO THE MAIN
CHANNEL.
(A) THE DEVELOPMENT SHALL BE CONSISTENT, IN COMBINATION WITH
OTHER STORMWATER RUNOFF, WITH THE DESIGN PARAMETERS OF
THE RESTORED STORMWATER CONVEYANCE SYSTEM THAT IS
FUNCTIONING IN ACCORDANCE WITH THE DESIGN OBJECTIVES.
(B) THE PEAK DISCHARGE REQUIREMENTS FOR CONCENTRATED
STORMWATER TO NATURAL STORMWATER CONVEYANCE
SYSTEMS SHALL BE MET. SEE 19(B)(1)(B).
GENERAL EROSION CONTROL NOTES
WORK AREA PROTECTION & MAINTENANCE
1. ALL FENCES REQUIRED TO BE REMOVED OR DISTURBED BY CONSTRUCTION SHALL BE
SALVAGED, STORED, PROTECTED AND RE -INSTALLED BY CONTRACTOR AT THE DIRECTION
OF AND LOCATION DESIGNATED BY THE PROJECT MANAGER. IF SUCH FENCE MATERIAL
CANNOT BE REUSED DUE TO DAMAGE CAUSED BY CONTRACTOR, CONTRACTOR SHALL
INSTALL NEW FENCE OF THE SAME TYPE OF MATERIAL. TEMPORARY FENCING REQUIRED
BY PRIVATE PROPERTY OWNERS SHALL BE PROVIDED BY CONTRACTOR. CONTRACTOR IS
ADVISED TO CONTACT PROPERTY OWNERS AT LEAST FORTY-EIGHT 48 HOURS IN
ADVANCE OF REMOVING ANY FENCE IN ORDER TO COORDINATE RELOCATION AND/OR
PROTECTION OF ANY ANIMALS, AND TO ESTABLISH AND CONFIRM WITH THE OWNER THE
PRE -CONSTRUCTION CONDITION OF ANY FENCE TO BE REMOVED, DISTURBED OR
REPLACED.
2. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY (FOLLOWING
ISSUANCE OF VDOT APPROVAL) AND ANY TEMPORARY OR PERMANENT EASEMENT
(FOLLOWING VERIFICATION OF EXISTENCE OF EASEMENT) SHOWN ON THE PLANS.
HOWEVER, CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS
PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO GAIN AND COORDINATE ACCESS AND
TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS
TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE
COORDINATED WITH VDOT AND THE PROJECT MANAGER. CONTRACTOR'S FAILURE TO SO
NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE PROJECT MANAGER MAY
RESULT IN DELAYS.
3. CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND
ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED
SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE.
4. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS,
DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL
BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS
SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY
PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE
DISTURBED SHALL BE RESTORED BY A LICENSED SURVEYOR AT CONTRACTOR'S EXPENSE.
5.CONTRACTOR SHALL EMPLOY EROSION CONTROL DEVICES AND METHODS AS REQUIRED TO
MEET THE REQUIREMENTS AND INTENT OF THE LOCAL EROSION CONTROL ORDINANCE.
CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES OR TEMPORARY
CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE
STREETS OR PROPERTY. CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT
MUD OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED
FOR MORE THAN SEVEN (7) CALENDAR DAYS.
VEGETATION
1. PRIOR TO REMOVING ANY VEGETATION, CONTRACTOR SHALL MEET WITH THE PROPERTY
OWNERS AND THE PROJECT MANAGER TO REVIEW THE LIMITS OF CONSTRUCTION AND
OBTAIN PERMISSION TO REMOVE VEGETATION REQUIRED TO DO THE WORK.
2.TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE
TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE PROJECT MANAGER. ANY TREES OR
PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT
ARE DAMAGED BY CONTRACTOR OR HIS SUBCONTRACTORS, SHALL BE REPAIRED OR
REPLACED BY CONTRACTOR AT NO ADDITIONAL COST.
3. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS
IMMEDIATELY UPON COMPLETION OF WORK ON EACH SITE. TOPSOIL, SEED, FERTILIZER
AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ESC AUTHORITY STANDARDS ON ALL
DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION
SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE.
4. THE ACT OF RESEEDING SHALL NOT QUALIFY AS "STABILIZED". THE CONTRACTOR SHALL
BE RESPONSIBLE TO ESTABLISH VEGETATION, NOT SIMPLY APPLY SEED AND MATERIALS.
a
U
rnM
N Q
W N
QD
ZO
Mei � O � @)U� L0
OLu z
0rrW J J_
rc-� WW
Q oCO �
C� Q ° N
Q Q? ¢0
W 2 O = cfl
64
r�
LuO O It
V , L�X
O:�. O u
ac rc J i
y aW w Lo
„ Qy UN
r zo
W 59)
Z �""
cy)
cy) It
w
O
Q W 0-
W
j,LTH OF
�o f
r
Jimmy L. Taggart
Lic. No.
w
012?T�4119 l�ww
4'49'SIONAL
Z / VW g w
Q W
N
J q rr
�- F -J
G� W Q �
U) _jLL
0
>_ Q O
LL
QF-�°
} CD
�c)zz
W _jW o
O C)
DATE:
10-19-2018
SCALE:
NA
JOB:
8053
CONTOUR INTERVAL: NA
SHEET:
OF 05
r
:
{21,
H
,
i
S i
i
ti
w3
WARM-
NOTE: THE PROPOSED LANDSCAPESEASON
PLAN POSES NO IMPACT TO THE ° GRASSES
EXISTING WOODED AREA SAND IS BASED
ON THE NATURAL TREE LINES FIELD F
,
LOCATED BY ROUDABUS, GALE AND
ASSOC. INC. OCTOBER 2018. Y i
NOTE: THIS LANDSCAPE (PLAN
MATCHES THE PLAN SUBMITTED BY
THE ARCHITECT.
(5) AMELANCI
(6) CER(
(5) CORNUS FLOIRIDA 'APPALACHIAN
SPRING' / FLOWERING DOGWOOD
(30) ILEX CRENATA 'GREEN LUSTRE' / JAPANESE
Ua
0
co 0-)
C\l <M
2 a
20,
Z z�
0
h
U -
\0
/ I-
O Q LLT Z
Qrc
W
J
Z OV >Q
a 2 Un 2E
oc w
w
Q
Oy
O CV
rT� Q Q ? ¢ �
w pcc Urn
CO
W C'3 a0
? cr-
j °cc o LL
y k W w ►r,
co U0
aC Z o
W 2rn
l� d
It
w
Z p
O 2
0—
P4 P4
J�I,TH OF vl+f'
Jimmy L. Taggart
Lic. No.
012i64l19
�s&10NAL
v z w
V w z
rr
W
w
J
-- Q
w
M
J
QLL
�
{
" z z �
DATE:
10-19-2018
SCALE:
1": 10`
JOB:
8053
CONTOUR INTERVAL: 2 FEET
ry
' �5
# m�¢Ia.y�pptt
�k- p a� pds
8A fi B
�� A! �'� � .., $� �
l F &" +�.a§.,� C �.&'a' F"§ � n'" $6 3 �.. Fi E°�. �
.r, t; .'.R �•
d�
..
C �
$d�,.t <� k �,
$c .'-,•x a.Si ^? &,°��q
.�.
ar��w:T§e^
.
-1
" "s:'
^ x,;» b ': Or
., t e % « �,, S x
:�"^�{ „ aq� ay $,u �» ,.,.r
.,� 1 3 _ w.H °vi i.. .. _ .
AA
�.�, d'a'.
g� ..:
,�, ! z m
Y3tt
�..z• �t„+„ �--
_h 9d ((gg aa ....8 �M
I d � p :- �. "'" u l 8 5 H a ', $a�• :d r_ -j r .
§
4' qq
g{ g £ §'p$ �'
4p8° .. r"'5,Ser �.,y+tt 88 G.r»x§..R :.
°
g� `$..;yy gve,,, a,°'"A'.
PIC
8 wr8 §$ Sx•I. -'"Mx.E .. ttw ...F ?w'"°+nA
Y gg°
°$&
Y
5qm
$ i;
•', `",Gs 'mss g
F. �E ..::C a�
:
{21,
H
,
i
S i
i
ti
w3
WARM-
NOTE: THE PROPOSED LANDSCAPESEASON
PLAN POSES NO IMPACT TO THE ° GRASSES
EXISTING WOODED AREA SAND IS BASED
ON THE NATURAL TREE LINES FIELD F
,
LOCATED BY ROUDABUS, GALE AND
ASSOC. INC. OCTOBER 2018. Y i
NOTE: THIS LANDSCAPE (PLAN
MATCHES THE PLAN SUBMITTED BY
THE ARCHITECT.
(5) AMELANCI
(6) CER(
(5) CORNUS FLOIRIDA 'APPALACHIAN
SPRING' / FLOWERING DOGWOOD
(30) ILEX CRENATA 'GREEN LUSTRE' / JAPANESE
Ua
0
co 0-)
C\l <M
2 a
20,
Z z�
0
h
U -
\0
/ I-
O Q LLT Z
Qrc
W
J
Z OV >Q
a 2 Un 2E
oc w
w
Q
Oy
O CV
rT� Q Q ? ¢ �
w pcc Urn
CO
W C'3 a0
? cr-
j °cc o LL
y k W w ►r,
co U0
aC Z o
W 2rn
l� d
It
w
Z p
O 2
0—
P4 P4
J�I,TH OF vl+f'
Jimmy L. Taggart
Lic. No.
012i64l19
�s&10NAL
v z w
V w z
rr
W
w
J
-- Q
w
M
J
QLL
�
{
" z z �
DATE:
10-19-2018
SCALE:
1": 10`
JOB:
8053
CONTOUR INTERVAL: 2 FEET
C rt en
M
p
k,.
..
„,.:
..
5$ p cg g
:«E w, I Y e i«4 & "y 'x 8
•`
g
S '.' §., • 5 §
-
-fid`' P § �
11,4
> { .I � "e •a
: 4 Y':p. B:� Ye, �
:
{21,
H
,
i
S i
i
ti
w3
WARM-
NOTE: THE PROPOSED LANDSCAPESEASON
PLAN POSES NO IMPACT TO THE ° GRASSES
EXISTING WOODED AREA SAND IS BASED
ON THE NATURAL TREE LINES FIELD F
,
LOCATED BY ROUDABUS, GALE AND
ASSOC. INC. OCTOBER 2018. Y i
NOTE: THIS LANDSCAPE (PLAN
MATCHES THE PLAN SUBMITTED BY
THE ARCHITECT.
(5) AMELANCI
(6) CER(
(5) CORNUS FLOIRIDA 'APPALACHIAN
SPRING' / FLOWERING DOGWOOD
(30) ILEX CRENATA 'GREEN LUSTRE' / JAPANESE
Ua
0
co 0-)
C\l <M
2 a
20,
Z z�
0
h
U -
\0
/ I-
O Q LLT Z
Qrc
W
J
Z OV >Q
a 2 Un 2E
oc w
w
Q
Oy
O CV
rT� Q Q ? ¢ �
w pcc Urn
CO
W C'3 a0
? cr-
j °cc o LL
y k W w ►r,
co U0
aC Z o
W 2rn
l� d
It
w
Z p
O 2
0—
P4 P4
J�I,TH OF vl+f'
Jimmy L. Taggart
Lic. No.
012i64l19
�s&10NAL
v z w
V w z
rr
W
w
J
-- Q
w
M
J
QLL
�
{
" z z �
DATE:
10-19-2018
SCALE:
1": 10`
JOB:
8053
CONTOUR INTERVAL: 2 FEET
SHEET:
5 OF 05