Loading...
HomeMy WebLinkAboutWPO200800037 Preconstruction Form WPO VSMP 2018-10-30 Request for Pre-construction Meeting and Grading Permit from Albemarle County Approved - Approved Plan Number: WPO-0264k0037 DEQ Permit Number(if applicable): VAR-/616 YI Approved Plan Name: / 5-1.4/ 4r-1 (Plans must be approved prior to a pre-construction meeting.) Bond approved date: /0/30// e (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: 6. 0141 FeD k8-4— State Certification Number: /0 y7g Address Voo i/4,4e,,,z-4. City Chet,4-eresktizto Val . State (4 Zip 09•02,417 Daytime Phone(VA'S, 63) St E-mail 6l'('/(4 X Of er/1144- •Primary Contractor: Contractor: Print Name "Bfgx ()eve • Address O. 7a)(:) City f (26 State ‘ 4( • Zip e9C)ge7‘e' Daytime Phone( ) E-mail ce,:h(41,k—he_ Permit lssuanje and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permii Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1.342.00 100 and rnore $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 711/14,Revised: 8/29/14, 10/18/18 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email (1410 ic 4 0 itft,- bOx 531- csvg 0,44ssie ,r„ .36,6) The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By whn9 7/1/14. Revised: 8/29/14, 10/18/18 Page 2 of 3 Request for Pre-construction -• 1 1 1 : 1 1 IP: 1 . 11 ' .rmit �A :: � 19?\\ from Albemarle Coun -., 4 : Approved Plan Number: WPO-0,20 0, 0037 DEQ Permit Number(if applicable): VAR-/ plcY? Approved Plan Name: /1-lL St/,tie L w S Art g S (Plans must be approved prior to a pre-construction meeting.) Bond approved date: AO/34V (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: / - _ Print Name: . " /p State Certification Number: /0818 Address VQd Ai42,41z- City C4 Oa,lre K 71 V tit - State (4 Zip p9o270/ Daytime Phone(V39) 573 "S E-mail 6 '° 4 'x & ',114(1• Primary Contractor: Print Name f-Ef x NI ' Address 0. J'tj 7V(0 City e t1 An I sState V' • Zip_P•)-We, Daytime Phone( ) E-mail cp€41.•_.4 Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised:8/29/14, 10/18/18 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email (410 f r)01 !g- t? s3 s5'g The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14,Revised:8/29/14, 10/18/18 Page 2 of 3 Gmail Debbie Cowles<dcfosterwell@gmail.com> Fwd: Request Pre Construction Meeting 1 message Donnie Foster<dffosterwell@gmail.com> Thu,Nov 1,2018 at 1:08 PM To: Debbie Cowles<dcfosterwell@gmail.com> Please print Sent from my iPhone Begin forwarded message: From:Jonney Otto<jotto@albemarle.org> Date:October 31,2018 at 3:50:00 PM EDT To:"dffosterwell@gmail.com"<dffosterwell@gmail.com> Cc:"bradbbx@earthlink.net"<bradbbx@earthlink.net>, David James<djames@albemarle.org>, Frank Pohl <fpohl@albemarle.org>,"jfosterwell@gmail.com"<jfosterwell@gmail.com> Subject: RE: Request Pre Construction Meeting Hi Donny, Having addressed the DEQ permit, Bonds and Fees I have arranged room A in the COB for Friday 11/2/18 at 10am to hold the preconstruction meeting. Please fill out this VSMP contact information box to bring with you. Please let me know if there is a concern with the date/time VSMPNESCP Contact Information Project Name: Earlysville Business Park Project/WPO Number: WP0200800037 Tax Map/Parcel 03100-00-00-021A0 DEQ Permit Number VAR101648 (if applicable): Land 06rvvJt2. Owner/contact Site Operator/phone (../.3(i_ V-136 Qualified j � JI j 3�G Principle q G Personnel/phone contact/phone C/3 Y— / /.3C U Contact E-Mail: s r.�-005co.r.RLD contactinfname o�number 6t✓3 IJ�S�Ke� bg\i( /() S Inspector: Jonney Otto/434.981.5154 Nutrients Credits Disturbed Acreage: j ,Q SS 77 ,.,j `v COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING DIVISION STANDARD OPERATING PROCEDURE FOR PREPARING FOR THE PRE-CONSTRUCTION MEETING The Management Analyst will send an email once the bonds have approved and posted. When this takes place that is when the Pre-Construction Meeting process starts to take place. CDA should then log the project in DEQ's system(See SOP—"Logging information into DEQ system") or coordinate the Pre-Construction Meeting Process. (Note: DEQ general coverage permit is required when a project is disturbing 1 acre or more and is NOT a Single Family Dwelling. But, DEQ general permit IS required if the project is part of a Larger Common Plan of Development even if the disturbed acreage is under 1 Acre. Refer to the DEQ registration statement.) • When the Management Analyst sends the email that the bonds have been posted, Engineering CDA to confirm if DEQ permit is required and communicate with applicant. • If DEQ permit required, CDA to enter project in the DEQ website and ask County Engineer to submit. Email applicant(reply to all) with instructions to pay and forward copy of receipt. Include a link to the pre-con form and ask applicant to fill it out and return it to you. • Inform applicant they can pay the fee before or at the time of the Pre-Construction Meeting. (Note: If they do not pay the fee then the Engineering Inspector will hold the Erosion Control Permit until they do pay). • Once the inspector confirms a date for the meeting, create the Erosion Control Permit in County View(See SOP—"Erosion Control Permits in County View"),print and give to Kenny to sign. Deliver signed permit to inspector. • Before the Pre-Construction Meeting takes place, ensure file is given to the inspector. • If for some reason the file has not been closed out after approval, then that process would need to take place(See SOP—"File Closeout After Approval" and follow the"WPO Files" guidelines). Commercial Est. Project Start Date (MM/DD/YYYY) 12/21/2016 0 Permit Information MS4 Operator Albemarle County S HUCs Est. Project End Date (MM/DD/YYYY) 06/01/2017 A Offsite Activities Total Area of Development(Acres) (e.g. 1.23) 1.80 $ Permit Fees Est. Area to be Disturbed (Acres) (e.g. 1.23) O Inspections 1.80 Part of a common plan? 0 Termination Information No 0 Permanent Measures Permit Events App Received Date (MM/DD/YYYY) 10/21/2015 App Complete Date (MM/DD/YYYY) 08/09/2016 Application Approved Date (MM/DD/YYYY) 01/05/2017 Incomplete App Letter Sent Date (MM/DD/YYYY) No Data Effective Date 07/01/2014 Expiration Date 06/30/2019 Event Comments No Data Additional Permit Info Linear Project? No Technical Criteria Part 2 C - Grandfathered Permit Writer Sepety, Holly Region Valley t Annual Standards? No TMDL? 0 Permit Information Yes CZM? S HUCs No Impaired Waters? 41 Offsite Activities Yes $ Permit Fees Exceptional Waters? No O Inspections Created By 0 Termination Information Todd Shifflett 0 Permanent Measures Created On 08/10/2016 Last Modified By Holly Sepety Modified On 01/05/2017 DEQ Classification Active Permit Status Permit Issued ti-Begin Modification = -4 Begin Transfer r 0 Permit Information SWC General Permit: VAR101648 - 4F LLC S HUCs Authority ii Offsite Activities SIE VSMP Authority $ Permit Fees Albemarle Co. It,Inspections Authority Unique ID No Data 0 Termination Information Alternate Unique ID No Data 0 Permanent Measures General Construction Activity Location Albemarle Comments No Data Construction Activity Operator (General permit coverage will be issued to this operator.) Operator Name 4F LLC Contact First Name Donnie Contact Last Name Foster Address Line 1 395 Reas Ford Rd Address Line 2 No Data City Earlysville State VIRGINIA Zip Code 22936 Zip Ext. No Data Phone Number(e.g. 1234567890) 8 Permit Information (434) 981-1360 Operator Email S HUCs dffosterwell@gmail.com Operator Email CC 4 Offsite Activities jfosterwell@gmail.com $ Permit Fees E Transmit? Yes O Inspections VDOT Operator? No o Termination Information 0 Permanent Measures Name and Location of the Construction Activity Name Earlysville Business Park Address Line 1 395 Reas Ford Rd Address Line 2 No Data City Earlysville State VIRGINIA Zip 22936 Zip Ext No Data Q Map It Latitude (e.g. 37.1234) 38.1431 Longitude (e.g. -78.1234) -78.4947 Project Info Status Private Nature of Construction Activity