Loading...
HomeMy WebLinkAboutSDP199300071 Plan - Other (not approved) Minor Amendment 1993-11-10 - s-, CUNTY OF ALBEMARL (:C2LA,_m2,NI' !1 • oula r21 f'iRGINIP MEMORANDUM TO: Bill Fritz - Planning Department E[ RECEIVE FROM: Don Franco, PE - Engineering Department 'OFG G NO 1 8 1993 DATE: November 17, 1993 RE: Planning Der GE Fanuc - New Boiler Room The revised site plan amendments (dated 10 November 1993) for the above referenced project have been reviewed. All previous review comments have been addressed. Tentative Approval is hereby granted by this department. Provided there are no substantive changes between this plan and the plan submitted for final signatures, please sign on our behalf. Please contact me (x3860) at your earliest convenience if you have questions regarding these comments or require additional information. ACF: Copy: Jack Kelsey Job File - SDP 93-071 Reading File - p93071_b.ftz 15r= N C -H MA aK NAt L_ IN POWSIZ POLE - NO 545 -LJ15c-.15 a, -2o r6L WPCI`8. P3' 0 F-WrION 13 13 Wr__"PA. L_ Woo C7 Z'0Nr--t2 PZ - l A.WL7 E5-1 v cam- I T E PLAN s C_ A L a : 1" = %v' C 0 U N T Y 0 F A L B E M A R L E D E P A R T M E N T 0 F E N G I N E E R I N G G E N E R A L C 0 N S T R U C T 1 0 N N 0 T E S F 0 R S I T E P L A N S (R e v i s e d M a r c h 1 1 9 9 2) 1. Prior to commencement of any construction within any existing public right-of-way, including connection to any existing road, a permit for said construction shall be obtained from the Virginia Department of Transportation (hereafter abbreviated V.D.O.T.). 2. All paving and drainage related materials and construction methods shall conform to current specifications and standards of V.D.O.T. unless otherwise noted. 3. Erosion and siltation control measures shall be Provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. Maximum allowable fill or cut slope is 2:1. Where reasonably obtainable lesser slopes of 4:1 or better are to be achieved. 5. All drainage inlets shall have a 2 -inch local depression. 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the Albemarle County Director of Engineering, or his designee, it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices, latest edition. 8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926), A. PeA'NE 7/_"X MAP 21 PSA, 2C,E,L_ 13 A /Vo 41. k> / . JVh V, DALE C.,HAMILTON Certfficofi' N. II II ZJ NEW COW-r<:::)U2'5 DALE C. HAMILTON & ASSOC. ARCHITECTS A.I.A. CHARLOTTESVILLE, VIRGINIA ALBEMARLE COUNTY, VA. SCALE IN MILES 0 2 3 4 I I SITE DATA, I BOILER ROOM ADDITION GE Fanuc Automation North America Routes 29 North & 606 Albemarle County, Virginia Rivanna Magisterial District The Property Is Zoned M-1 Survey and Topography provided by: W. S. Roudabush; Roger W. Ray; Jodee Assoc., and Cloeckaer & Lincoln. See Site Plan this sheet for Tax Map Numbers, Parcel Numbers, and Deed Book Numbers. The site has two (2) existing storm water detention ponds. There are no other bodies of water or watercourses on or adjacent to the site. The site is not within a 100 year flood plain. The site is not located within a reservoir watershed. AREAS: Total Site: 59.218 Acres Existing Manufacturing Building: 158,,024 Sq. Ft, New Boller Room Addition: 527 Sq. Ft. Exist. Bldg. Fir. Area Ratio: 6.13% of Total Site New Add. Flr. Area Ratio: .3335% of Exist. Bldg. New Addition Fir. Area Ratio: .02041 of Total Site Height of Exist. Mfg. Building: 30 Ft. Height of New Addition: 12 Ft. ADDITIONAL DATA: 20% Or Greater Site Slope: None At This Project Water & Sanitary Sewer Facilities: Existing - No Change Storm Water & Drainage: Slight increase in storm water runoff (2.04 one hundredths of one percent of site) Electrical Service: Existing - No Change Telephone Service: Existing - No Change Parking/Paving: Existing - No Change Streets, Travelways, Easements: Existing - No Change . Ingress To, Egress From Site: Existing - No Change Areas For Public Use: Existing - No Change Trash Storage/Collection: Existing - No Change Landscaping: E Existing - No Change lt Exterior Lighting: Existing - No Change Planning Dept. Signs: Existing - No Change The addition will beofa material similar to the existing building. VICINITY MAP SIGNATUrm"'EQ, BUCK kFAINJ 04� MIL ADVANC �Q' LS HICKUBY RIDGE SAO AEbT — — — — — — — — — — EARLYSVILLL' AME t 1A FIRE — OFFICIAL — "x Y " 6 fAIHGRUV1 FA 9 VIAl — — — — — — — — — — — — --- — — — — — — — — — — GW HEALTH DEPARTMENT BIVANNAULLYMIM CLEA I K LLS y Rn — — — — — — — — — — — — — — ------ — — — — -- _____)0 FRUFF11 OVER PLANNING & COMMUNITY DEVELOPMENT HILLS 0614 EYNAU WOODS 16 A76)" D6U WOU 11 a 0 IVY FARM�. �4 SERVICE AUTHORITY B 'ER KEY WEST ACCUUms0 LASIMAM — — --- — --- — — — — — — — --- — — — — — — — — — --- — — — --- — — — — — 0 — — — — — — — --- — — 0 A VDOT 250 ' 7-T- - A TTESVILLE IVY H 637) G QIIIMAM ACUCK 7, r--Z-d�f NG --------------------- — ---------------------- NEW BOILER ROOM (MANUFACTURING BUILDING) GE Fanuc U.S. Route 29 N. & State Rt. 606 ALBEMARLE COUNTY, VIRGINIA REVISED ISSUED I VII/°)3 NOV 10 1993 SITE PLAN, GRADING PLAN, SITE DATA DRAWN CHECKED DATE SCALE AS NOTED PROJECT NO.1 SHEET NO. PP_ 1 of