HomeMy WebLinkAboutSDP199300071 Plan - Other (not approved) Minor Amendment 1993-11-10 -
s-,
CUNTY OF ALBEMARL
(:C2LA,_m2,NI' !1
•
oula r21
f'iRGINIP
MEMORANDUM
TO: Bill Fritz - Planning Department E[
RECEIVE
FROM: Don Franco, PE - Engineering Department 'OFG G
NO 1 8 1993
DATE: November 17, 1993
RE: Planning Der
GE Fanuc - New Boiler Room
The revised site plan amendments (dated 10 November 1993) for the above referenced
project have been reviewed. All previous review comments have been addressed. Tentative
Approval is hereby granted by this department. Provided there are no substantive changes
between this plan and the plan submitted for final signatures, please sign on our behalf.
Please contact me (x3860) at your earliest convenience if you have questions regarding these
comments or require additional information.
ACF:
Copy: Jack Kelsey
Job File - SDP 93-071
Reading File - p93071_b.ftz
15r= N C -H MA aK NAt L_ IN POWSIZ POLE -
NO 545 -LJ15c-.15
a, -2o
r6L WPCI`8. P3'
0 F-WrION
13
13
Wr__"PA. L_ Woo C7
Z'0Nr--t2 PZ - l A.WL7 E5-1
v
cam- I T E PLAN s C_ A L a : 1" = %v'
C 0 U N T Y 0 F A L B E M A R L E
D E P A R T M E N T 0 F E N G I N E E R I N G
G E N E R A L C 0 N S T R U C T 1 0 N N 0 T E S F 0 R S I T E P L A N S
(R e v i s e d M a r c h 1 1 9 9 2)
1. Prior to commencement of any construction within any existing
public right-of-way, including connection to any existing road, a
permit for said construction shall be obtained from the Virginia
Department of Transportation (hereafter abbreviated V.D.O.T.).
2. All paving and drainage related materials and construction methods
shall conform to current specifications and standards of V.D.O.T.
unless otherwise noted.
3. Erosion and siltation control measures shall be Provided in
accordance with the approved erosion control plan and shall be
installed prior to any clearing, grading or other construction.
4. All slopes and disturbed areas are to be fertilized, seeded and
mulched. Maximum allowable fill or cut slope is 2:1. Where
reasonably obtainable lesser slopes of 4:1 or better are to be
achieved.
5. All drainage inlets shall have a 2 -inch local depression.
6. Paved, rip -rap or stabilization mat lined ditch may be required
when in the opinion of the Albemarle County Director of
Engineering, or his designee, it is deemed necessary in order to
stabilize a drainage channel.
7. All traffic control signs shall conform with the Virginia Manual
for Uniform Traffic Control Devices, latest edition.
8. Unless otherwise noted all concrete pipe shall be reinforced
concrete pipe - Class III.
9. All excavation for underground pipe installation must comply with
OSHA Standards for the Construction Industry (29 CFR Part 1926),
A. PeA'NE
7/_"X MAP 21
PSA, 2C,E,L_ 13 A
/Vo
41.
k> /
. JVh
V,
DALE C.,HAMILTON
Certfficofi' N. II II
ZJ
NEW COW-r<:::)U2'5
DALE C. HAMILTON & ASSOC.
ARCHITECTS
A.I.A.
CHARLOTTESVILLE, VIRGINIA
ALBEMARLE COUNTY, VA.
SCALE IN MILES
0 2 3 4
I I SITE DATA, I
BOILER ROOM ADDITION
GE Fanuc Automation
North America
Routes 29 North & 606
Albemarle County, Virginia
Rivanna Magisterial District
The Property Is Zoned M-1
Survey and Topography provided by:
W. S. Roudabush; Roger W. Ray; Jodee Assoc., and
Cloeckaer & Lincoln.
See Site Plan this sheet for Tax Map Numbers,
Parcel Numbers, and Deed Book Numbers.
The site has two (2) existing storm water
detention ponds. There are no other bodies of
water or watercourses on or adjacent to the site.
The site is not within a 100 year flood plain. The
site is not located within a reservoir watershed.
AREAS:
Total Site: 59.218 Acres
Existing Manufacturing Building: 158,,024 Sq. Ft,
New Boller Room Addition: 527 Sq. Ft.
Exist. Bldg. Fir. Area Ratio: 6.13% of Total Site
New Add. Flr. Area Ratio: .3335% of Exist. Bldg.
New Addition Fir. Area Ratio: .02041 of Total Site
Height of Exist. Mfg. Building: 30 Ft.
Height of New Addition: 12 Ft.
ADDITIONAL DATA:
20% Or Greater Site Slope:
None At This Project
Water & Sanitary Sewer Facilities:
Existing - No Change
Storm Water & Drainage:
Slight increase in storm water runoff (2.04 one
hundredths of one percent of site)
Electrical Service:
Existing - No Change
Telephone Service:
Existing - No Change
Parking/Paving:
Existing - No Change
Streets, Travelways, Easements:
Existing - No Change .
Ingress To, Egress From Site:
Existing - No Change
Areas For Public Use:
Existing - No Change
Trash Storage/Collection:
Existing - No Change
Landscaping: E
Existing - No Change lt
Exterior Lighting:
Existing - No Change Planning Dept.
Signs:
Existing - No Change
The addition will beofa material similar to the
existing building.
VICINITY MAP SIGNATUrm"'EQ,
BUCK
kFAINJ
04�
MIL
ADVANC �Q'
LS
HICKUBY
RIDGE SAO
AEbT — — — — — — — — — —
EARLYSVILLL' AME t 1A FIRE — OFFICIAL —
"x
Y " 6
fAIHGRUV1 FA 9 VIAl — — — — — — — — — — — — --- — — — — — — — — — —
GW HEALTH DEPARTMENT
BIVANNAULLYMIM
CLEA I
K LLS y Rn
— — — — — — — — — — — — — — ------ — — — — -- _____)0 FRUFF11
OVER
PLANNING & COMMUNITY DEVELOPMENT
HILLS 0614 EYNAU WOODS 16 A76)"
D6U WOU 11 a
0 IVY FARM�.
�4
SERVICE AUTHORITY
B 'ER KEY WEST
ACCUUms0
LASIMAM
— — --- — --- — — — — — — — --- — — — — — — — — — --- — — — --- — — — — —
0 — — — — — — — --- — —
0 A
VDOT
250
' 7-T- - A TTESVILLE
IVY H
637)
G
QIIIMAM
ACUCK
7, r--Z-d�f NG --------------------- — ----------------------
NEW BOILER ROOM
(MANUFACTURING BUILDING)
GE Fanuc
U.S. Route 29 N. & State Rt. 606
ALBEMARLE COUNTY, VIRGINIA
REVISED ISSUED
I VII/°)3 NOV 10 1993
SITE PLAN, GRADING PLAN, SITE DATA
DRAWN
CHECKED
DATE
SCALE
AS NOTED
PROJECT NO.1
SHEET NO.
PP_ 1
of