VSMP Permit plan review
Project title: North Pointe Subdivision Section 1 - VSMP
Project file number: WP0201600035
Plan preparer:
Townes Site Engineering [MGabriel@cctownes.com]
Owner or rep.:
CWH Properties [david@southern-classic.com]
Plan received date:
28 April 2016
(Rev. 1)
14 October 2016
(Rev. 2)
20 December 2018
Date of comments:
6 June 2016
(Rev. 1)
16 November 2016
(Rev. 2)
31 January 2019
Reviewers:
Matt Wentland
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is approved. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Provide an updated SWPPP for the project. (Rev. 1) Comment partially addressed. The
Certification will need to be signed. This can be done when hard copies are submitted.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Provide a Pollution Prevention Plan. This can be part of the SWPPP. (Rev. 1) Comment addressed.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. The SWM Handbook recommends basin slopes to be 3:1 or greater. As this doesn't seem feasible,
provide fencing around the measures as a safety feature. [MS3.06] (Rev. 1) Comment addressed.
2. Show access to the dam/outlet structure on SB-l/BMP 4. [MS3.06] (Rev. 1) Comment partially
addressed. The dam/outlet access should be at an elevation that will not be inundated in a
storm event or if the outlet structure is clogged/water is passing through the emergency
spillway. (Rev. 2) Comment addressed.
Engineering Review Comments
Page 2 of 3
3. Provide a landscaping plan for the basins and biofilters. [MS3.06, MS3.11] (Rev. 1) Comment
addressed. Planning may have further comments regarding the landscaping. (Rev. 2)
Comment addressed.
4. Show a comparison of the pre- and post -development flows at each Analysis Point (or where the
runoff enters a channel) to show that the channels are adequate. [9VAC25-840-40(19)]. (Rev. 1)
Comment addressed. (Rev. 2) Comment addressed.
D. Erosion and Sediment Control Plan (ESOP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Verify the measures are labeled correctly between the plans and the calculations. (Rev. 1)
Comment addressed.
2. Most of the controls appear to be set up for the final grading of the site, please provide additional
perimeter controls for the initial grading/clearing operations. Diversions will be needed in some
areas to direct the runoff to traps before the site is fully graded and silt fence will be needed in
other areas at the limits of disturbance. (Rev. 1) Comment partially addressed. Some diversions
appear to be shown on the incorrect phase and the linework has the flow arrows reversed.
(Rev. 2) Comment addressed.
Rev. 1 Comments
Call out the inlet and outlet protection for the temporary slope drains on the plans. (Rev. 2)
Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
Engineering Review Comments
Page 3 of 3
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforms.asp?department=cdengwpo
File: WPO201600035 North Pointe Section 1 revl 11-14-16.doc