HomeMy WebLinkAboutSUB201800012 Bond Road Plan and Comps. 2018-12-07 Internal l se Onlr W
re w oh ALfidc,
Pate Received: Fee Paid:Ow ^+ 1�
' Received by: •• b . .. . eajLk 4
�` Ji !� -
W&,-, ie./5
Intake: Forrrard to Management Analyst ®tea'.
.0103./
Iiiii6...:1_‘?. 2C7/4
BOND INSPECTION REQUEST IF
..', /9
APPROVED PLAN #SUB201800012 __
PROJECT NAME: Old Trail IIIIIM Village Block 7, Phase II-Road Plans=
(As listed on the approved plan) ,, ,• p 0
This is to request that an inspection be performed by the County. Where fees are assessed, a fee is req ' d or
each inspection. Please check the inspections requested.
0 VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207 & 208 S250
Subdivision (roads.drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $269
'Water& Sewer per Subdivision Ordinance section 14-435 $269
❑ Site Development Performance bond(Incomplete Site Work & Landscape Maintenance) $301
TOTAL FEES$269
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902, Attention: Management Analyst- Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings. inspection reports,and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20%of the original
posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site work, a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to;
EMAIL: dave@oldtrailvillage.com
OR REGULAR MAIL ADDRESS:
ignature t 't wne evelope
-gyp ale (. K Cette,)1") -1 / 3- 1
Date
Revised 7/152014.72012015,i 1 r'.3/2015
rte , y-r, /I- j 5/2q/141S
--41.015
Date Retched: / Fee :___24)
„
Received 6i: elm ti l�* fr(Lie.4))//61i/t!
Intake: Forward a Management Analyst fa, •r.,.
:.0% , s."- r/tt 64
REQUEST TO ESTABLISH A BOND
APPROVED PLAN#SUB201800012
PROJECT NAME: Old Trail Village Block 7 Phase II Road Plans
(As listed on the approved plan)
All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
ally/c14- )' tcJ Zi tlb3 I,LC—
TAX MAPs/PARCELs: 55E-01-6B-0 OWNER'S • L: �� - �5�
SIGNATURE: i� date: .S
,,,,/ /
TAX MAPs/PARCELs: 0 ,de:'S NAM '!
SIGNATURE: date:
TAX MAPs/PARCELs: `OWNER'S NAME:
SIGNATURE: date:
TAX MA Ps/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:--___
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including,but not limited to the name of corporation,partnership,limited liability company,
trust,association,etc.,documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion& Sediment Control per Water Protection Ordinance section 17-207;SO fee
❑ VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208:$250 fee required
Z Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
& Water&Sewer per Subdivision Ordinance section 14-435;S269 fee required
A bond estimate will be prepared by the plan ret iewer.The estimate must be sent to the owner. Please provide
contact information.
EMAIL: dave@oldtrailvillage.com
OR REGULAR MAIL ADDRESS:
Ret n.:3 6.2',2014- 11'3'2'15