Project title: Earlysville Business Park VSMP Amendment
Project file number: WP0201800033
Plan preparer: Timothy Miller (Meridian) [tmiller@meridianwbe.com]
Owner or rep.: 4F LCC []
Plan received date: March 27, 2018
Dec. 28, 2018
Date of comments: May 11, 2018
Jan. 31, 2018 (Rev. 1)
Reviewer: David James [djames@albemarle.org]
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any
VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the
comments below. The application may be resubmitted for approval if all of the items below are satisfactorily
addressed. The VSMP application content requirements can be found in County Code section 17-401.
A. Administrative / General
1. Two applications were submitted, and only a VSMP application was needed. Please submit
VSMP application when you resubmit.
(Rev.1) Addressed.
2. Please combine the SWM plan & ESC plan into one plan set — the VSMP plan.
(Rev.1) Addressed.
3. Cover:
a. Change the title to `Earlysville Business Park VSMP Amendment' and the WPO #
to `WP0201800033'.
b. Remove any text that says `minor' in front of amendment.
c. Include Drillers Lane `SUB201700197' number under Site Data.
(Rev.1) Addressed.
4. Comments from the road plan may alter VSMP plan comments.
(Rev.1) Acknowledged; road plan under review.
B. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Registration Statement:
a. Complete section 1.
b. Change name to `Earlysville Business Park VSMP Amendment' for section 3.
c. Change HUC from `JA41' to `JR08' in section 6.
(Rev.1) Addressed.
d. (Rev. 1) Section 8 - correct start & end dates.
e. (Rev. 1) Section 10 - Check `No' box, not a CPD.
f. (Rev. 1) Section 12 - Sign & date.
2. Insert copy of General Permit coverage when obtained.
(Rev.1) Acknowledged.
3. Insert copy of PPP `exhibit sheet' of the site that is to be updated with any changes in the
field during construction.
(Rev.1) Addressed.
4. Qualified person to be provided prior to pre -construction meeting.
(Rev.1) Acknowledged.
5. Owner to complete Signed Certification.
(Rev.1) Acknowledged.
6. Complete Delegation of authority section if needed.
(Rev.1) Addressed.
7. Insert copy of the General Permit.
(Rev.1) Acknowledged.
C. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Show any proposed clearing/grading activities, paving operations, landscaping operations,
E&S controls, staging, stockpile, borrow, fueling, waste disposal, vehicle/equipment
washing, concrete washout locations on the PPP.
(Rev.1) Addressed.
D. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP.
This plan is disapproved, and the reasons are provided in the comments below. The Stormwater
management plan content requirements can be found in County Code section 17-403.
1. Correct to scale shown; appears to be 1"=30', not 1"=40'.
(Rev.1) Addressed.
2. Show all existing easements with deed book & page numbers. Remove the callouts that say
"New Engineered Level Spreader" it should be existing.
(Rev.1) Addressed.
3. No constructed grades adjacent to proposed road should be over 3:1.
(Rev.1) Addressed.
4. Relocate proposed drainfield outside of drainage swale.
(Rev.1) Addressed.
5. Show all drainage structures (pipes/ditches) in the drainage area maps.
(Rev.1) Addressed.
6. Provide storm/drainage design calcs (can be submitted separately in a packet).
(Rev.1) Addressed.
7. Verify your rainfall intensity of 4"/hr for inlet computation. I think it should be higher.
(Rev.1) Addressed.
8. The slope of the channel is as high as 3:1. You're only showing roadside ditch calcs, show
for channel to SMF.
(Rev.1) Addressed.
9. Show drainage area map to inlets, channels/ditches.
(Rev.1) Addressed.
10. Correct label for post -development summary table.
(Rev.1) Addressed.
11. How are you treating the runoff for the disturbance near entrance? Include that area in
drainage area maps.
(Rev.1) Addressed.
12. Is the site draining to a natural channel? Will have to verify it meets energy balance criteria
under 9VAC25-870-66.
(Rev.1) Addressed; N/A. Grandfathered under Part II(C).
13. Basin orifice diameter needs to be 3" minimum.
(Rev.1) Addressed.
14. Submit a new SWM facility deed of easement & plat.
(Rev.1) Deed & plat recordation prior to plan approval.
15. Show future development area (Lot 2).
(Rev.1) Addressed.
16. Nutrient credit agreement required. Proof of purchase required. Please contact Ana Kilmer
regrading nutrient credit purchase requirements.
(Rev.1) Nutrient credit purchase prior to plan approval, so the note on sheet C-422 doesn't
apply.
17. Sheet C-423: (Change, or update) The original WPO plans under SDP200800061 were
approved 9-16-2009.
E. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Again, correct the scale.
(Rev.1) Addressed.
2. Show all existing easements with deed book references, locations & dims.
(Rev.1) Addressed.
3. Show existing right-of-way with street name, route number & width labeled.
(Rev.1) Addressed.
4. Show proposed street name and right-of-way.
(Rev.1) Addressed.
5. Show paved eonstr-uretion entr-anee detail, see page 3 of 23 of the County's De
Constr-tietion Manual. Remove eur-r-ent detail.
6. Add perimeter controls (SF) along both sides of road.
(Rev.1) Sheet C-511: Show SF perimeter control along road where grading (temp.
turnaround).
7. Identify the boxed areas / symbols adjacent to road near stockpile
(Rev.1) Addressed.
8. Basin orifice diameter needs to be 3" minimum.
(Rev.1) Addressed.
9. Provide OP shape & stone size calcs (see VADEQ ESC HB Spec. 3.18).
(Rev.1) Addressed.
10. (Rev.1) Sheet C-402: It's my understanding that the existing pond is to remain and the
notes to abandon or remove need to be removed.
11. (Rev.1) Sheet C-411: There should be a defined & adequate channel from emergency
spillway to existing receiving channel (ESC HB, Spec. 3.14, MS-19).
Additional Comments:
12. Provide runoff, CN determinations: pre -/post -development conditions, with worksheets.
(Rev.1) Addressed.
13. Pi uvide time of concentration: pre -/post -development conditions, with worksheets. Specify
assumptions used.
(Rev.1) Addressed.
14. Show stage -storage curve for the basin & stage -discharge for the control structures.
(Rev.1) Addressed.
15. Show barrel inlet/outlet control analysis. Show SCC design & lining material.
(Rev.1) Addressed.
16. Show 10' (min) wide vehicle access to SWM facility with easement over access and facility.
Access grade over 20% must be surfaced with gravel or pavement. [DSM, pg. 12].
(Rev.1) Addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have been
satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a
completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this
review.
Process:
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond
estimate request form and fee to the Department of Community Development. One of the plan reviewers
will prepare estimates and check parcel and easement information based on the approved plans. The
County's Management Analyst will prepare bond agreement forms, which will need to be completed by
the owner and submitted along with cash, certificates or sureties for the amounts specified. The
agreements will need to be approved and signed by the County Attorney and County Engineer. This may
take 2-4 weeks to obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the
remainder of the application fee. The form identifies the contractor and responsible land disturber, and
the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;