COUNTY OF ALBEMARLE
Department of Planning&Community Development
401 McIntire Road, Room 218
Charlottesville, Virginia 22902-4596
(434)296-5823
Fax(434)972-4012
March 18, 2002
Jo Higgins
2463 Browns Gap Tnpk
Charlottesville, VA 22901
RE. SDP-2001-016 Clover Lawn Village Preliminary Site Plan
Tax Map 56, Parcels 107, 107A, and 107A1
Dear Ms. Higgins-
The Planning Commission approved the above-referenced site plan at its March 5, 2002 meeting. The
Planning Commission granted approval of your request for the following waivers.
• Approved the critical slopes waiver as shown generally on the preliminary site plan with
the condition that slopes be regraded at a slope necessary to meet ARB requirements for
landscaping and in no instance at less than 2:1
• Approved request to disturb the 20 foot buffer with grading as generally shown on the
preliminary site plan
The approval of the preliminary site plan is valid for(1) one year in accordance with Zoning Ordinance
Section 32.4 3 1 Therefore, the preliminary approval shall expire March 5, 2003. If the preliminary site
plan approval expires, a new application must be filed and processed.
Please address all of the requirements and conditions listed below and submit eight(8) tentative plan
copies to the Department of Planning and Community Development. This letter must be submitted with
the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or
the tentative plan will be denied. A submission and review schedule is attached for your information
The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated
applications and fees, may also be submitted with the eight(8) tentative Plans. Failure to do so will result
in a separate application to be filed with the Engineering Department at a later date
After the initial tentative plan submittal, each department/agency will contact you to discuss any remaining
conditions. After all aforementioned department/agencies have granted a tentative approval, you may
submit the final mylars (2 sets), one blueprint copy, final site plan application, final site plan fee, and a
copy of all written tentative approvals to the Department of Planning and Community Development by
5 00 p m on any Monday Assuming that the final site plan mylars reflect all tentative approvals, signing
of the plans will occur four days later on Thursday.
_ a \
[ 4 y�
F
Page 2
The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in
addition to the following conditions.
1 The Planning Department shall not accept submittal of the final site plan for signature until
tentative approvals for the following conditions have been obtained The final site plan shall not
be signed until the following conditions are met:
1. (32.7.2.8) Show ramps everywhere a sidewalk comes to a curb and in front of every HC
striped space.
2. (32.7.9.8.a.) Provide vegetative screening around the back and sides of each dumpster
enclosure. Each dumpster must be located outside of the 20 foot required buffer
3. (32.7.9) Provide landscaping and screening plans.
4. (32. 7.2)The"optional" pedestrian path, that will go through the area shown for stormwater if
provision for a different stormwater facility is made, must not go through a parking space
Room must be made between parking spaces for the pedestrian path through the parking lot
and the area must be striped across the parking lot.
5. Demonstration that no fence or other structure is located along the northern boundary of the
property within either a public right-of-way or private accessway.
Engineering Department
1 Provide an erosion control plan, narrative and computations [18-32.7.4 3, 17-203]
2. Provide a completed application and fee for erosion control and stormwater management.
[17-203, 17-303]
3 Provide a stormwater management/BMP plan and computations Computations must include
water quality, and detention routings for the 2yr and 10yr storms. [17-304]
4 Provide completed stormwater management facilities maintenance agreement and fee. [17-
323]
5 Provide drainage computations [18-32 7 4, Policy]
6 Provide plans to VDOT for approval of improvements that affect the public right-of-way
Architectural Review Board
(See Attachment C—page 12 of staff report)
Albemarle County Service Authority
1. Provide final construction drawings for the water and sewer extensions. Construction
drawings shall be submitted directly to the Service Authority.
2. Provide a note stating the domestic water service lines for the-commercial units shall have
backflow prevention devices installed on them
3 Provide adequate fire flow. The available fire flow approximately 1800 feet west of this site is
2580 gpm at 20 psi residual pressure, therefore the required fire flow, as currently calculated,
cannot be met.
4. Provide a platted water line easement across the entire frontage of the site for a future water
line extension The easement shall be deeded to the Service Authority and recorded in the
clerk's office prior to approval of the final site plan
VDOT
1 Show turn radii at entrance.
2. Provide CG-12 (handicapped accessible curb cuts) at the entrance.
Page 3
Zoning
1. [32.5 6(n)] Show the location of all outdoor lighting on the plan
2. [32.6.6(j)] Provide a description and photograph or diagram and show the location of each
type of outdoor luminaire that emits 3,000 or more initial lumens Please be aware that
installation of such luminaires in the future that are not shown on this plan shall require an
amendment to this plan.
3. [32.6.6(j)] [4 17 4(b)] Include a photometric plan on the site plan demonstrating that parking
area luminaires are in compliance with 4.17 4(b)
4. [30 6]The final plan approval is subject to the issuance of a Certificate of Appropriateness
from the Architectural Review Board
If you have any questions, please do not hesitate to contact me
Sincerely,
24u _
Elaine Echols, AICP
Principal Planner