Loading...
HomeMy WebLinkAboutWPO201800088 Review Comments WPO VSMP 2019-02-20COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit Plan review Project: Pantops Corner — VSMP Plan preparer: Justin Shimp, Shimp Engineering, 912 E. High Street Charlottesville, VA 22902[iustin(a)shimp-engineering.com] Owner or Rep: Pantops Corner LC, 12704 Crimson Court, Suite 101; Henrico,VA 23233-7657 Plan received date: 30 Nov 2018 (Rev. 1) 22 Jan 2019 Date of comments: 28 Dec 2018 (Rev. 1) 20 Feb 2019 Reviewer: John Anderson WP0201800088 County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied, for reasons listed, below. The application may be resubmitted for approval if all comment items are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Link to County template: httn://www.albemarle.oriz/unload/imaees/forms center/demrtments/Community Develonment/forms/Eneineerine and _WPO_Forms/Stormwater_Pollution _ Prevention_Plan _SWPPP template.pd 1. List named individual/s responsible for pollution prevention practices (Sec. 6E), and list named individual as Qualified Personnel, Sec. 8. Note: SWPPP cannot be approved unless responsible individuals are listed. (Rev. 1) Comment persists. Applicant response: `This is still being determined pending the site bid process. This information will be shared when determined, until then we understand this may be a repeat comment.' SWM Plan Note: if grayscale, comment addressed with (Rev. 1); no need for follow-up. Calc. booklet 1. Revise post-dev POA drainage map, POA 1 Qloo-yr, 67.28cfs, consistent with HyrdroCad routing for this event (101.74cfs). 2. Revise and re -run postdev (detention system) routings using: primary device #1 Invert Elev. =353', L =47.25', slope=6.77%, and device #2 as 7.3" DIA orifice, not 7.3" vert. orifice/grate, unless this designation is proper, and properly models hydraulics of a round orifice. 3. Revise detention system design as needed to ensure post-dev Q2, Qio peaks are < pre -development rates. 4. Copy LD-229 to plans. 5. Pantops Corner Worksheet 1 (water quality, VSMH, Vol. II, Appx. 5D) math is inaccurate. Post - development impervious totals 6.85 Ac., not 5.11 Ac. Revise nutrient purchase estimate (lb.), if necessary. Engineering Review Comments Page 2 of 6 Plan 6. Revise 0.0% detention system slope to ensure positive grade to weir. 0.0% invites debris accumulation, obstruction, pooling, even negative slope, without care. Ensure 0.25 -0.50% slope, high end to low end. If a manufactured system and Mfr. recommends 0% slope, provide written recommendation to that effect. 7. If underground detention system is a Mfr. system, provide Mfr. installation notes on plans. 8. If Mfr. system, include periodic maintenance and inspection guidelines on plans. 9. LD-229 indicates Q from A6 to A5 exceeds pipe capacity; revise design. C3 10. Label proposed /existing easements. 11. SWM facility access easement appears discontinuous. Revise for clarity. (Rev. 1) Partially addressed. As follow-up: Please show SWM Facility and Access easement on C3, not C11. Also, provide SWM facility easement width based on smallest of. CI I Underground Detention Construction Notes/CMP Detention Notes #1, 2, and Albemarle County Design Standards Manual easement width diagram, pg. 15. 12. Show /label Rt. 20 right-of-way. C4 13. Label inlets (assign IDs) located in Wawa Pantops parking lot. (Rev. 1) Addressed. Sheet C4, Plan Note: `Storm sewer on TM 78-5A to be designed under Wawa Site Plan. This VSMP Plan covers the conveyance and treatment of runoff from Parcel TM 8-5A but not the storm sewer design for this parcel.' Engineering accepts plan note. 14. Provide storm line profile for these inlets. (Rev. 1) Addressed. `Wawa will provide.' Engineering accepts this. 15. Provide storm line profile for A10 to Al OC. 16. Label proposed easements. (Rev. 1) Partially addressed. Asfollow-up: Show SWM Facility and Access easement on C3, not C11. Also, see item #11, above. 17. Provide /label dimensions of underground detention system in plan view. For example, 5 lines at x.xx'. C5 18. Provide spot elevations to ensure runoff does not pool on parking surfaces, near contour 393', Wawa Pantops parking lot (5-space parking at N end Wawa site). Also, A8A rim elev-380.50, while spot elevations on C5 show identical elevation in near vicinity (3-space HC parking). Provide flow lines or additional spot elevations to ensure runoff reaches inlet A8A. 19. Need flow lines south of 3-space HC parking (preceding item) to ensure runoff reaches Str. A8A. 20. Provide inlet in corner of parking spaces immediately to right on entering Wawa site, to avoid ponding. 21. 0.0% flow line on parking surface north of building A is confusing. Provide positive grade at this location. (Rev. 1) Comment withdrawn. 22. Provide several spot elevations at corners and inset corners of island positioned immediately above the underground detention system. 23. C6: Applicant proposes to purchase K30 lb./phosphorus nutrient credits. Coordinate nutrient credit purchase with Ana Kilmer, Albemarle County, prior to purchase (434.296-5832 x3246). 24. (Also, items 7, 8, above) (Rev. 1) Partially addressed. As follow-up: a. Provide level of design detail required to prepare an As -built Construction Record Drawing. (Rev. 1), see c, d, i, k, m.-q., below. b. Place Construction Record Drawing (As -built) for VSMP* on SWM Plan sheet. c. Provide bedding detail /specifications for detention system. (Rev. 1) Confirm corrugation height > 1". If > 1", VDOT 57 stone is acceptable, since 25-60% #57 stone passes'h" screen. (source: hgp:HcWitolflexipave.com/wp-content/uploads/2012/08/AASHTO-57-Stone-Specs.pdf); ref. C11 Underground Detention Construction Notes/CMP Detention Notes #4. d. Provide backfill detail /specifications for detention system. (Rev. 1) Detail 3-Cl 1: Show /specify AASHTO M 43 Size 33 as backfill. #57 stone is ineligible backfill material, per Mfr. Note. Engineering Review Comments Page 3 of 6 (Ref C 11 Underground Detention Construction Notes/CMP Detention Notes #7. Source, image, below: http:Hlaurelaggregates.com/aashto-3 ) MM e. Provide recommended installation guidelines, if a manufactured system. f Provide construction installation, and construction inspection notes on the plans. g. Provide manufacturer recommended periodic inspection guidelines and frequency, on the plans. h. Provide and label all access ways to the underground system. i. Ensure access is possible to all portions of the underground system. (Rev. 1) Revise design such that 2' wide side of weir is accessible to maintenance personnel, not simply a camera. At present, access to the 2'-w side of weir is via 17' deep /high MH, and 30" HDPE pipe. It is imperative that maintenance checks that may reveal deficiency (requiring access) allow access other than by a 30" DIA pipe, to the outlet side of the weir. Engineering recommends provide at least 3' space, which is still narrow and quite confined (see generic web -image, below). Data: If upturned portion of elbow were to extend as a circular shape to INV elev. 353.00', then lost volume by shifting weir plate to allow 3' as opposed to 2' space behind the weir = 39.014 ft3. Actual lost volume is less, given curved floor of typical CMP detention elbow (ref. image). Engineering advises work with detention manufacturer to compensate for actual lost volume such that 10-yr event does not overtop (top of weir) elevation. A 0.776' length (-9 in.) of 8' DIA CMP z 39 ft3. Also: revise weir plate detail, 4-C 11, since 'h weir plate width =3.46' (not 4') at proposed position, or 3.87' at recommended position, with curve radius = 4' only at the bottom. Albemarle cannot disregard effect of accurate dimensions, of shifting weir plate (to allow 3' space), or of model routing results using weir plate R j. Provide installation notes for weir plate; if MH-weir plate is fabricated prior to delivery, state this. k. Provide orifice debris cage/s. (Rev. 1) Provide detail for debris cage. 1. Ensure orifice debris cage is accessible for periodic maintenance. in. General Note for SWM Plans #2 requires pipe and riser joints to be watertight. Provide detailed notes and specifications for joints, as needed. (Rev. 1) Comment restated. C11 Underground Engineering Review Comments Page 4 of 6 Detention Construction Notes/CMP Riser Note 9 alone is insufficient. Provide Notes and �pecifications. Also: i. CMP Riser Note 4 appears to mandate slip joints. ii. Provide Mfr. installation guidance for slip joints. iii. Provide slip joint detail on plans. Depth from finished grade to base of stone bedding is 25'. Quality of installation is a high priority. n. Provide step detail. Review design to ensure no conflict between steps and weir plate. (Rev. 1) Provide additional profile detail of access riser w/ladder, with ladder steps continuing as needed, per Mfr. guidance, to allow safe county inspection, or maintenance access to floor of the system. If steps end at ceiling, personnel cannot access proposed 8' DIA system. Provide schematic detail. o. Show and provide SWM Facility and permanent drainage easements. (Rev. 1) Ref. comments elsewhere. p. Record all necessary easements prior to VSMP approval. (Rev. 1) Comment persists. q. New: C 11 Underground Detention Construction Notes/CMP Detention Notes 8 and 10 point to information not shown on plans. Provide table (Note 8) and final backfill material specifications (Note 10). Also: CMP Riser Note 7 states `Manhole risers in applications where traffic loads are imposed require special design considerations.' Provide evidence that design addresses special MH design considerations, since six of seven detention system MHs are located in traffic areas. * Link, Construction Record Drawing (As -built) requirements: httn://www.albemarle.ore/unload/images/fonns center/deDartments/Community Develonment/forms/Eneineerin _and _WPO_Forms/WPO_VSMP_Construction _ Record_ Drawings Policy 23May2014.pdf C10 25. Provide note for steel plates in MH with fall >4ft., per VDOT Drainage Manual (please call if questions). [Initial comments VDOT Drainage Manual image removed.] 26. Label MH structures requiring safety slab (ht. >12', Inv Out to RIM). 27. Provide safety slab detail. 28. Provide note /specification for'/z inch steel plate in bottoms of "step down" MHs with drops >4ft. 29. MHs in fill are susceptible to settling; request bedding/compaction Note for Str. B1A and B2. VDOT language available. 30. Provide profile for inlets /pipes on Wawa site. Revise LD-229 to include these inlets, once labels assigned. (Rev. 1) `Wawa designer swill provide these in their final site plan.' Engineering accepts this statement. 31. Provide storm line profile: A1OC to A10. C11 32. Provide bypass design for underground detention such that if orifices and weir are obstructed, storm lines will not flood parking areas or streets. 33. A cross-section of the UG system is provided, but not a profile. Provide underground detention system longitudinal profile showing: (Rev. 1) Request restated: show detention barrel lines 2, 3, 4, 5, 6, and 7 in profile. Ref. items b, c, d, below. a. Slope b. High end invert elevation, if slope c. Low end invert elevation, if slope d. Manway access with safety slab (Rev. 1: overall ht. finished grade to floor system > 12-ft.) e. Bedding material and depth 34. Weir plate detail: provide material type and weir plate thickness. 35. Also, please see item 24., above. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. See A /Sec. 6 comments, above. List named individual, Sec. 6.E. (Rev. 1) Comment persists. Engineering Review Comments Page 5 of 6 C. Erosion and Sediment Control Plan (ESCP) Note: if grayscale, comment addressed with Rev. 1, with no need for follow-u . Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons outlined, below. The erosion control plan content requirements can be found in County Code section 17-402. C6 36. Revise stage 4 (sequence) note 3 to require county inspector approval prior to removal of ESC measures. 37. Stormwater Management Note 3: revise 8.30 lb. qty. if Appx. 5D worksheet calculations alter nutrient credit purchase estimate. C7 38. Provide soil stabilization blanket at SW corner of Trap 1 at point of diversion dike discharge, to limit trap embankment erosion. 39. Show break in SAF at PCE, Rt. 20. 40. Dimension and label riprap outfalls (L x W x D), Trap 1, Trap 2, plan view. (Rev. 1) Label depth of riprap. C8: 41. Provide IP, Str. A9 C9: 42. Check value B, sediment trap design data, Trap 1. 43. C2: Provide bk.-pg. ref. and parcel owner name, parcels under development and adjacent parcels. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Prncp%% After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter /update project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they may issue a modified or revised permit coverage letter. This should be copied to the county. Easements must be recorded prior to VSMP approval. Proof of purchase of nutrient credits is required to receive a Engineering Review Comments Page 6 of 6 Grading Permit. After DEQ coverage is issued, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hqp://www.albemarle.orgJdeptforms.asp?department=cdeng3Wo Ifyou have questions or concerns, please contact me at janderson2((&albemarle.org or at 434.296-5832 ext. 3069. Thank you. J. Anderson, Engineering Division WPO201800088 Pantops Corner 022019rev1