Loading...
HomeMy WebLinkAboutARB201900011 Certificate of Appropriateness 2019-02-22COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax(434)972-4176 February 22, 2019 Bob Pineo Design Develop LLC 418 E Main Street Charlottesville, VA 222902 RE: ARB -2019-11: 1824-1828 Rio Hill FaVade Renovations (TMP 04500-00-00-94A0) Dear Mr. Pineo, I have reviewed the above -referenced application for a county -wide Certificate of Appropriateness. Your proposal meets all of the design criteria outlined by the Architectural Review Board for this type of Certificate. You may consider this letter your Certificate of Appropriateness. This approval is specifically conditioned on the following: 1. Execution of the design indicated on the final approved plans, attachments, materials, samples, and other submittal items presented. Please note the following: 1. Any changes in the approved design will require a new application and additional review. 2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the signing of final site plans and the approval of building permits. It is in the applicant's best interest to notify ARB staff of such changes and to initiate the review of amendments to ARB -approved plans to avoid future delays. 3. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions concerning this action, please feel free to contact me. Sincerely, 910 Heather McMahon, Senior Planner 434-296-5832 x3278 hmcmahon@albemarle.org 1824-1828 RIO HILL FACADE RENOVATIONS PRESENTED BY DESIGN DEVELOP 01 1231 A'PrZovEb Tep., Av-g 1824 - 1828 RIO HILL 'CHARLOTTESVILLE, VA TABLE OF CONTENTS I I COVER 2 1 TABLE OF CONTENTS 3 1 PROJECT BRIEF 4 1 VICINITY MAP 5 1 SITE PLAN 6 1 EXISTING CONDITIONS 7 1 EXISTING ELEVATION 8 1 PROPOSED ELEVATION 9-11 1 PERSPECTIVES 12 1 EXTERIOR FINISHES DESIGN DEVELOP, LLC JANUARY 22, 201.9 1824 - 1828 RIO HILL CHARLOTTESVILLE, VIRGINIA 1824 and 1828 Rio Hill are two adjacent commercial bays located in the Rio Hill Shopping Center. Currently the two bays are delineated from each other through different canopy conditions and a large dividing parapet extending above the canopies. An incoming tenant, who will be inhabiting both bays, has requested a cohesive facade that will better express a clear entrance and unified space. Currently the canopy condition of the 1824 facade consists of a green standing seam metal shed roof above a 4 foot band of stucco. This condition is consistent across the two bays to the left of 1824 as well. The 1828 unit utilizes the same standing seam metal roof as an awning below a 5 foot 6 inch parapet of the same stucco material. This condition is also utilized in the two bays to the right of 1828. The transition of the two roof conditions is indicated by a brick parapet dividing the two bays (see page 7 for existing elevation clarification). To create a cohesive unit, the brick parapet will be removed and the 1824 roof condition will be extended over the 1828 bay. A new parapet will be introduced at the right end of 1828 to indicate the new point of transition between roof conditions. The materials will remain consistent with existing conditions by either salvaging materials during the demolition process, or matching new materials and color to the existing material palette. Overall the change in canopy condition to the 1828 bay will remain consistent with the architectural elements already utilized in the Rio Hill Shopping Center while creating a cohesive unit for the incoming tenant. 1824 - 1828 RIO HILL DESIGN DEVELOP, LLC CHARLOTTESVILLE, PROJECT BRIEF JANUARY 22, 2019 'A, jam„ b �[• (J�I All j ENTER 1 A - Ilk ` ) 1 1. -•.• .• .. w O ➢ V ''b �� Y. I � fff f � l ♦ ,1i ♦ y"^ s v �j i . 1820r =1824110 MILL' .•WV fol a .. yy R - t �. / is � !� � _ � `k. / r� `'� - '1. �iLx"`�• - /< l a7 ��' '� ♦ ate, •� e "� $'�� _F3� � �.:.' � / ' >� � O� u e 00 ft 324 - 1828 RIO W A DI nTTCC\/11 All DESIGN JANUARY DEVELOP, 22, 2019 LLC 824 - 1828 RIO HILL CHARLOTTESVILLE, VA X11 / / / 1 poor -- LOCATION OF PROPOSED CHANGES N SITE PLAN DESIGN DEVELOP, LLL JANUARY 22, 2019 ,eiohtWatcha s, FRONT ELEVATION EAST APPROACH AREA OF PROPOSED CHANGES WEST APPROACH 1824 - 1828 CHARLOTTESVILLE,VAVA LL EXISTING CONDITIONS DESIGN DEVELOP, LLQ JANUARY 22, 2019 PARAPET TO BE REMOVED BRICK TO BE SALVAGED IF POSSIBLE 1 1 1 1 1 1 1 1 1 1 1 AREA OF RENOVATION ----- ------- --------------- LWWwrn-lhtWatchsrs I r I I -r- Lb ------ ----- -- -------- 1824 - 1828 RIO HILL CHARLOTTESVILLE, VA EXISTING FRONT ELEVATION 3/16" = F-0" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SECTION OF PARAPET TO BE REMOVED SECTION OF PARAPET TO BE REMOVED STANDING SEAM METAL ROOF TO BE REMOVED AND SALVAGED IF POSSIBLE EXISTING FRONT ELEVATION M'P VEb Pef2 AW?- 9/JM ZILz1�l DESIGN DEVELOP, LLC JANUARY 22, 2019 EXISTING 1824 - 1828 RIO HILL CHARLOTTESVILLE, VA PILLAR CAPPED WITH ANGLED BRICK TO MATCH EXISTING BRICK COLOR PERSPECTIVES PROPOSED STANDING SEAM METAL ROOF TO MATCH EXISTING CONDITION NEW STUCCO TO MATCH ®EXISTING COLOR NEW PARAPET TO MATCH F -EXISTING PARAPET FORM A"0VF,!> ree- AVZ HJUM 2 -'/z -Z -/I-1 DESIGN DEVELOP, LLC FEBRUARY 15, 2019 EXISTING PROPOSED A-Pt,WVt3 Pew A103 Hum z/zz/m 1824 - 1828 RIO HILL DESIGN DEVELOP, LLC CHARLOTTESVILLE, VA PERSPECTIVES FEBRUARY 15, 2019 EXISTING 1824 - 1828 RIO HILL CHARLOTTESVILLE, VA j ht!!atche M PERSPECTIVES PROPOSED AfPkovCb Pip- � Hmpt Z/L2/1`i DESIGN DEVELOP, LLC FEBRUARY 15, 2019 STANDING SEAM METAL ROOF TO MATCH EXISTING 7100 SPLIT FACED BRICK WITH WR A2412 MORTAR TO MATCH EXISTING STUCCO TO MATCH EXISTING iqPPi26ve,b -Per-- AR -S tymm ZAZ/(ct 1824 - 1828 HLL CHARLOIT SVIOLLEiVA EXTERIOR FINISHES DESIGN DEVELOP, LLC FEBRUARY 15, 2019