HomeMy WebLinkAboutWPO201800076 Preconstruction Form Erosion Control Plan 2019-02-01 Request for Pre-construction Meeting and Grading Permit .91
"
from Albemarle,-County
Approved Plan Number: WPO- a 012 0cp7,6DBQ Permit Number(if applicable): VAR-
Approved Plan Name: S YYl O J N Ack ‘,N Cc( >M p q a vA)8 _ V �S 5 P
il
(Plans must be approved prior to a pre-construction meeting.)
Bond approved date: Oc / 010 i 9 -
(Bonds must be approved and posted prior to a pre-construction meeting or permit.)
D..,LuitSei.
Pint Name: v �n��- Q�,—� cl 0 0 4-
State Certification Number: L-1 1 1 Co q _ 3__ c�-
>
Address P. 0 , 3 - -- --
City CA 10 A- k e±S V \ L L 2 -----State V c _ Zip�o a 1 O
Daytime Phone(1/34,1 4/4-43 5--
E-mail b v,00 ) .0 8 % s 1 we- 0 C.o vv
Primary Contractor:
Print Namet S — ----- -— - -- ----- - ---
Address P. 0 , _' )( 3 I - - ---
City.0 ()AA S V 1 L L -- - -- -- State V 5 Zip o�G't �� J
Daytime Phone LhJJ S 7 7 Li 41 3�E-maii h d 5 1 c0 WN
---
^no )� i N .� __—
Permit Issuance and First Year Maintenance Fees: (Request muni >r;c/ de payment)
Total acres proposed to be disturbed is contained on the approved plan and application:
VSMP:
Acres to be disturbed Fee Due at Grading Permit
Less than 1 - ---- i -- --- -- -------•
`63.80
1 and less than 5 $594.00 _5 and less than 10 ---- fi$748.00- _ ---- --
10 and less than 50 i $990.00
1-50 and less than 100 $1,342.00
100 and more $2,112.00
For plans exempt from VSMP, VISCI" fees were paid with the application.
7/1/14,Revised: 8/29/14, 10/18/18 Page 1 of 3
Person(s)to attend the Pre-construction Meeting:
Names(type or print) Firm Contact Number or email
'Bv cZO\L L.„00 s a 15s 1131/ - 97g—t1`l3S'
Sao lc 81 . i a
N% -e \ ,j-ev-- t e —1- o, A e LI 3 i4 09 3 c)
\r`ye Z \ ,N e -- c6ra,Ae.s
\M% \c.,e L- PeD x s,k-y o u,) •V et w s"L/a - a ci ► - 3 6. 3 Co,p
v>11 k.e vv\ s+y ock v- , a ►n..
The second part of the application fee is required to be paid with this request. This fee amount is;
FOR OFFICE USE ONLY Permit Issued Date
By who?
7/1/14,Revised: 8/29/14, 10/18/18 Page 2 or 3
Information for Permit Apel cants
9-Month Permanent Stabilization Deadline:
Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after
commencing land disturbing activity.
A. When permanent vegetation required. The owner shall install on all denuded areas on the site within nine(9)
months after the date the land disturbing activity commenced, except for areas that the administrator
determines are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface, including,but not limited to,the following surfaces: (i)
roadways and sidewalks covered by gravel, asphalt pavement, or concrete; (ii)trails or paths covered by
gravel, stone dust, or mulch; (iii)buildings and other permanent structures; and such other surfaces that the
administrator determines would adequately provide a permanent barrier to erosion.
(see code 17-808 for information about possible extensions)
Notice to Comply and Permit Revoked for Overdue Fees
Late fees will incur interest, and enforcement actions per code section 17-210.
(1) Owners with late payments of fees required by 17-207 or 17-208 will be issued a Notice to Comply(NTC). The
notice gives 7 days to make payments.
(2) At the end of the NTC time period,the permit will be revoked, and a Stop Work Order will be issued for
working without a current permit.
Disturbed Area Reductions
Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on
approved plans. If fees are to be reduced,an application for plan amendment must be made,and areas reduced by
changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due
date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all
erosion control measures(including traps and basins)removed.
Refunds
The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will
not be pro-rated at payment, other than the first year VSMP fee as indicated in code section 17-209(B).
Re-inspection Fees
Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are $250
per inspection, or as given in code sections 17-207 and 17-208.
Maintenance Fees
Annual Maintenance Fees will be assessed in Match of every year this permit is active. Fees cannot be prorated after
the first year of permit issuance [code sections 17-207 and 17-208].
7/1/14,Revised: 8/29/14, 10/18/18 Page 3 of 3
(http://www.virginia.gov/)
Agencies (http://www.v,irginia.gov/government/state-employees/agency-directory) I Governor
(http://www.governor.virginia.gov)
'46V rEQ
Search Virginia.Gov (http://www.virginia.gov/search)
t�.\�>�i« .M v i.yi. bra l.l.i V:
(https://www.deq.virginia.gov!)
Search)
/Search?FirstName=brook&LSI stName=wood&CertNumber=41969&Page=1&ExactCertMatch=True&ZipRadius=5)
Search Results
Found 1 items (1 page).
Page: « 1 »
Phone and email address will only appear if the certificate holder has granted permission to display this
information publicly.
Wood, Brook R
Digs, Inc.
Charlottesville, VA
Certifications:
• Responsible Land Disturber(RLD)#41969 - Expires 05/13/2020
Page: « 1
For assistance with the Certification Accreditation Tracking System(CATS)please email certification@deq.virginia.gov
(mailto:certification@deq.virginia.gov)or telephone(804)698-4375.