HomeMy WebLinkAboutWPO201800076 Plan - E&S Erosion Control Plan 2018-11-26SCOPE OF WORD:
THIS PLAN SERVES AS AN EROSION AND SEDIMENT CONTROL PLAN AND GRADING PLAN ASSOCIATED WITH
MAINTENANCE WORK TO RESTORE ACAMPSITE FIELD AND GRAVEL ACCESS ROAD TO A PROPERLY DRAINING
CONDITION. WORK INCLUDES INSTALLING A CULVERT AND GRADING ACTIVITIES. ASMALL PORTION OF THE
FLOODPLAIN AND WATER PROTECTION ORDINANCE BUFFER WILL BE IMPACTED BY THIS WORK. THIS IS
ALLOWED BY -RIGHT FORTH IS USE, AND THE SPECIAL USE PERMIT ASSOCIATED WITH THIS PROPERTY. PLEASE
SEETHE LETTER OF NO -RISE AND FLOODPLAIN IMPACT NARRATIVE ACCOMPANYING THIS SUBMISSION FOR
MORE DETAILS-
PROJECT
ETAILS.
PROJECT INFORMATION: UTILITY OWNERS:
OWNER: MOUNTAIN DREAM, LLC
56 MISTY MOUNTAIN ROAD
GREENWOOD, VIRGINIA 22943
CONTACT: MICHAEL LEO
PHONE: 540.456.6409
ENGINEER: LINE + GRADE I CIVIL ENGINEERS
113 4TH STREET NE
CHARLOTTESVILLE, VA 22902
CONTACT: DANIEL C. HYER, PE
PHONE: 434.262.0169
SURVEYOR: MERIDIAN PLANNING GROUP, LLC
440 PREMIER CIRCLE, SUITE 200
CHARLOTTESVILLE, VA 22901
CONTACT: TIMOTHY R. MILLER
PHONE: 434.882.0121
PARCEL INFO: PARCEL #: 07100-00-00-00300
56 MISTY MOUNTAIN ROAD
GREENWOOD, VIRGINIA 22943
ZONED: RURAL AREAS
LEGAL AREA: 47.11 ACRES
ADDT'L INFORMATION:
DISTURBANCE AREA: 1.60 AC (69,786 SF)
12 DIGIT HUC CODE: 020802040101
i i
t• i111kyj U1111
e i i
ELECTRIC: DOMINION
WATER: PRIVATE WELL
STORM SEWER: PRIVATE
SANITARY SEWER: PRIVATE SEPTIC
BC
BACK OF CURB
ID
INSIDE DIAMETER
R&D
REMOVE AND DISPOSE
ABAN
ABANDON
LA
LANDSCAPED AREA
R&R
R'.EMOVEAND RESET
AC
ACRES
LF
LIN EAR FEET
R&S
R' EM OVE AND STACK
ADJ
ADJUST
LOD
LIMITS OF DISTURBANCE
SB
SOUTHBOUND
APPROX
APPROXIMATE
LT
LEFT
SF
SQUARE FEET
ASPH
ASPHALT
MAX
MAXIMUM
SSD
STOPPING SIGHT DISTANCE
It
BASELINE
MIN
MINIMUM
STA
S>TATION
BLDG
BUILDING
ME
MATCH EXISTING
SW
SiIDEWALK
BM
BENCHMARK
NIC
NOT IN CONTRACT
TEMP
TEMPORARY
(L
CENTERLINE
N.T.S.
NOT TO SCALE
TRANS
TRANSITION
CF
CUBIC FEET
NB
NORTHBOUND
TYP
TYPICAL
CG
CURB AND GUTTER
OC
ON CENTER
WB
V'VESTBOUND
CONC
CONCRETE
OD
OUTSIDE DIAMETER
WSEL
V'VATER SURFACE ELEVATION
CONST
CONSTRUCTION
PRKG
PARKING
DI
DROP INLET
PROJ
PROJECT
LP
LOW POINT
DND
DO NOT DISTURB
PROP
PROPOSED
SP
SADDLE POINT
EB
EASTBOUND
PVMT
PAVEMENT
q
EL
ELEVATION
PM
PAVEMENT MARKING
EX
EXISTING
REM
REMOVE
FND
FOUNDATION
ROW
RIGHT-OF-WAY
GRVL
GRAVEL
RT
RIGHT
HC
HANDICAP
BC
BACK OF CURB
PCC
POINT OF COMPOUND CURVATURE
BR
BOTTOM OF RAMP
PI
POINT OF INTERSECTION
SVCS
BEGIN VERTICAL CURVE STATION
PNT
POINT
BVCE
BEGIN VERTICAL CURVE ELEVATION
PR
PROPOSED ELEVATION
BW
BOTTOM OF WALL
PRG
POINT OF REVERSE CURVATURE
D OR A
DELTA ANGLE
PT
POINT OF TANGENCY
EG
EXISTING GRADE
PVC
POINT OF VERTICAL CURVATURE
EP
EDGE OF PAVEMENT
RVI
POINT OF VERTICAL INTERSECTION
EROSION & SEDIMENT CONTROL PLAN -
PHASE II
PVT
POINT OF VERTICAL TANGENCY
EVCS
END VERTICAL CURVE STATION
C1.3
EVCE
END VERTICAL CURVE ELEVATION
R
RADIUS
TAN
TANGENT DISTANCE
FG
FINISHED GRADE
d+
STORMWATER COMPUTATIONS
w
TC
TOP OF CURB
FL
FLOWLINE
Or
THT
THROAT
HP
HIGH POINT
is Af
TR
TOP OF RAMP
INV
INVERT
? N
TW
TOP OF WALL
L
LENGTH
STA
STATION
LP
LOW POINT
LVC
LENGTH OF VERTICAL CURVATURE
SP
SADDLE POINT
PC
POINT OF CURVATURE
OFF
OFFSET
VICINITY MAP
SCALE: 1" = 30,000'
ft�E 25�.
LOCATION MAP
SCALE: 1" = 1,000'
PROJECT
LOCATION
Description
Recipient
APPROVED
1
IST SUBMISSION
COUNTY OF ALBEMARLE
by the J l!bemarle County
2
2ND SUBMISSION
Community
LL)Ejl elgp7,ienr Department
SHEET
INDEX
{
LU
t 3 a ✓
Q
j5
CO.O
TITLE SHEET
x
CO.1
GENERAL NOTES
C1.0
EROSION & SEDIMENT CONTROL PLAN -
PHASE I
PROJECT_
C1.1
EROSION & SEDIMENT CONTROL PLAN -
PHASE II
4.f�
C1.2
� LOCAT I o N
C1.3
EROSION & SEDIMENT CONTROL DETAILS
t.. '� r - `did �Jl 4§' � {�Y a S" .n. ✓ &L f b`' rt{
l }-.
{_a
���£.�t 4 s
iq
Y
1
d+
STORMWATER COMPUTATIONS
w
LI �
,
.x
Or
q v
is Af
41
Jj
? N
y rF f �. ¢ �✓ r
zK
q
t
VICINITY MAP
SCALE: 1" = 30,000'
ft�E 25�.
LOCATION MAP
SCALE: 1" = 1,000'
PROJECT
LOCATION
SUBMITTAL LOC
Submission
Description
Recipient
APPROVED
1
IST SUBMISSION
COUNTY OF ALBEMARLE
by the J l!bemarle County
2
2ND SUBMISSION
Community
LL)Ejl elgp7,ienr Department
SHEET
INDEX
FileDate,
`
-
a �. ----------
_�vC? _ � # —,,r � I
--__
-
SHEETNUMBER SHEETTITLE
CO.O
TITLE SHEET
CO.1
GENERAL NOTES
C1.0
EROSION & SEDIMENT CONTROL PLAN -
PHASE I
C1.1
EROSION & SEDIMENT CONTROL PLAN -
PHASE II
C1.2
EROSION & SEDIMENT CONTROL NOTES
C1.3
EROSION & SEDIMENT CONTROL DETAILS
C2.0
GRADING & DRAINAGE PLAN
C2.1
SITE SECTIONS AND DETAILS
02.2
STORMWATER COMPUTATIONS
TOTAL SHEETS = 9
SUBMITTAL LOC
Submission
Description
Recipient
Submittal Date
1
IST SUBMISSION
COUNTY OF ALBEMARLE
10/18/2018
2
2ND SUBMISSION
COUNTY OF ALBEMARLE
11/9/2018
3
SIGNATURE SUBMISSION
COUNTY OF ALBEMARLE
11/26/2018
U
W
z
10
q .
, q r1L I if 0� .,
k 1 P 26/2 9--�
DANT
C1
1 Y E R
L is No. IAC 4 ;596
qdL
�\7
APPROVED DCH
SUBMITTAL NO. 8
I PROJECT 1809400 1
T11-1 E VJ0 R K OF
L.1N'E + ORAD
GENERAL CONSTRUCTION NOTES:
1. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CURRENT VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND
BRIDGE STANDARDS AND SPECIFICATIONS (VDOT RBS&S), VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THE RULES AND REGULATIONS
WATER AND SANITARY SEWER CONSTRUCTION SPECIFICATIONS AND STANDARDS FOR THE PLAN APPROVING AUTHORITY AND ANY OTHER APPLICABLE
FEDERAL, STATE, OR LOCAL ORDINANCES, CODES, AND LAWS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL CONDITIONS, MATERIALS, DIMENSIONS LOCATIONS AND EXISTING ELEMENTS TO REMAIN IN
THE FIELD BEFORE PROCEEDINGS WITH ANY WORK. IF CONDITIONS VARY FROM WHAT IS REPRESENTED IN THE DRAWINGS, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE ENGINEER.
3. EXISTING CONSTRUCTION SHOWN IN THESE DRAWINGS SHALL BE USED AS RELATIVE REFERENCES AND ARE TO BE VERIFIED IN THE FIELD BY THE
CONTRACTOR IF DEEMED CRITICAL FOR PROPER EXECUTION OFTHE WORK.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUST CONTROL MEASURES.
5. PROVIDE ADEQUATE PROTECTION FOR THE EXISTING BUILDINGS, BUILDING OCCUPANTS, VEHICLES AND PEDESTRIANS AT ALL TIMES IN ACCORDANCE
WITH OSHA AND ALL APPLICABLE STATE AND LOCAL CODES.
6. MATERIALS AND EQUIPMENT SHALL BE STORED IN APPROVED AREAS TO PREVENT IMPACTS ON VEHICLES AND PEDESTRIANS. CONTRACTOR SHALL BE
FULLY RESPONSIBLE FOR MEASURES TAKEN TO ENSURE VEHICULAR AND PEDESTRIAN SAFETY THROUGH THE ENTIRE DURATION OF THE WORK. SAFETY
IS PARAMOUNT.
7. EQUIPMENT AND MATERIALS SHALL BE STORED IN DESIGNATED AREAS AND SHALL NOT ENCUMBER THE OWNER'S OPERATIONS, SURROUNDING RIGHT
OF WAY, OR ADJOINING GROUNDS.
8. ALL WORK AREAS SHALL BE CLEANED DAILY.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF BUILDINGS ADJACENT TO WORK AREAS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
COSTS OF DAMAGES RESULTING FROM CONSTRUCTION ACTIVITIES.
10. SECTION CUTS AND DETAIL CALLOUTS INDICATED IN THE DRAWINGS ARE TYPICAL FOR THE PROJECT. THEY ARE TO BE CONSIDERED TYPICAL FOR SIMILAR
CONDITIONS AND HAVE NOT BEEN SHOWN EVERYWHERE THEY APPLY.
11, CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY.
12. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL CONSTRUCTION.
13. SYMBOLS IN THE DRAWINGS ARE NOT TO SCALE.
14. ALL WORK SHALL BE LAID -OUT PRIOR TO INSTALLATION OF NEW WORK BASED ON MEASUREMENT OF EXISTING CONSTRUCTION AND EXISTING
CONSTRUCTION DESIGNATED TO REMAIN AS PART OF THE PROJECT. DO NOT START INSTALLATION OF WORK UNTIL LAY -OUT IS COMPLETE AND POTENTIAL
CONFLICTS HAVE BEEN IDENTIFIED AND ADDRESSED.
15. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO THE EXISTING BUILDINGS AND ADJACENT GROUNDS AND PROPERTY CAUSE BY
THE CARELESSNESS OR NEGLECT OF HIS WORKMEN. DAMAGE TO PORTIONS OFTHE PROPERTY NOT SUBJEC i TO WORK UNDER THE CONTRACT SHALL BE
REPAIRED TO THE FULL SATISFACTION OFTHE OWNER AND ENGINEER, AT THE CONTRACTOR'S EXPENSE.
16. PROTECTION OF THE WORK: PROTECT EFFECTIVELY ALL MATERIALS AND EQUIPMENT DURING THE ENTIRE PERIOD OF CONSTRUCTION. REPLACE
MATERIALS AND EQUIPMENT DAMAGED, LOST OR STOLEN WITHOUT ADDITIONAL COST TO THE OWNER.
17. PROTECT EXISTING MATERIALS DURING INSTALLATION OF TEMPORARY PROTECTION AND CONSTRUCTION. DO NOT DEFACE OR REMOVE EXISTING
MATERIALS IF INTENDED TO STAY. ATTACHMENTS OF TEMPORARY PROTECTION TO EXISTING CONSTRUCTION SHALL BE APPROVED BY THE ENGINEER
PRIOR TO INSTALLATION.
18. OBTAIN ENGINEER REVIEW AND WRITTEN APPROVAL IN THE FORM OF A CONSTRUCTION CHANGE DIRECTIVE OR SUPPLEMENTAL INSTRUCTION BEFORE
MAKING CHANGES OR ADDITIONS TO CONSTRUCTION OR REMOVING MATERIALS THAT WERE INTENDED TO REMAIN.
19. NOTIFY ENGINEER OF VISIBLE CHANGES IN THE INTEGRITY OF MATERIALS OR COMPONENTS WHETHER DUE TO ENVIRONMENTAL CAUSES INCLUDING
BIOLOGICAL ATTACK, UV DEGRADATION, FREEZING OR THAWING OR DUE TO STRUCTURAL DEFECTS, INCLUDING CRACKS, MOVEMENT OR DISTORTION. DO
NOT PROCEED WITH WORK IN QUESTION UNTIL DIRECTED BY THE ENGINEER.
20. WHERE MISSING FEATURES ARE INDICATED TO BE REPAIRED OR REPLACED, PROVIDE FEATURES WHOSE DESIGNS ARE BASED ON ACCURATE
DUPLICATIONS RATHER THAN ON CONJECTURAL DESIGNS, SUBJ ECT TO APPROVAL OF THE ENGINEER.
21. WHERE WORK REQUIRES EXISTING FEATURES TO BE REMOVED, CLEANED AND REUSED, PERFORM THESE OPERATIONS WITHOUT DAMAGE TO THE
MATERIALS THEMSELVES, TO ADJACENT MATERIALS, OR TO THE SUBSTRATE. WHEN CLEANING, MATCH SAMPLES OF EXISTING MATERIALS THAT HAVE
BEEN CLEANED AND IDENTIFIED FOR ACCEPTABLE CLEANING LEVELS. AVOID OVER CLEANING TO PREVENT DAMAGE TO EXISTING MATERIALS DURING
CLEANING.
22. TEMPORARY MATERIALS MAY BE NEW OR USED, BUT MUST BE ADEQUATE IN FOR REQUIRED USAGE, MUST NOT CREATE UNSAFE CONDITIONS AND MUST
NOT VIOLATE REQUIREMENTS OFAPPLICABLE CODES AND STANDARDS.
23. CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE FIRE PROTECTION IN THE FORM OF FIRE EXTINGUISHER OR OTHER EFFECTIVE MEANS OF
EXTINGUISHING FIRE, READY FOR INSTANT USE, DISTRIBUTED AROUND THE PROJECT AND IN ASND ABOUT TEMPORARY, INFLAMMABLE STRUCTURES
DURING CONSTRUCTION OF WORK. EXISTING FIRE HOSE CONNECTIONS SHALL BE ACCESSIBLE AT ALL TIMES BY FIRE DEPARTMENT PERSONNEL.
MATERIAL SAND DEBRIS SHALL NOT BE STORED IN FRONT OF THE CONNECTION, THUS PREVENTING ACCESS. THE CONTRACTOR SHALL COORDINATE
ACCESS PROCEDURES WITH THE FIRE MARSHALL.
24. GASOLINE AND OTHER FLAMMABLE LIQUIDS SHALL BE STORED AND DISPENSED FROM UL LISTED SAFETY CONTAINERS IN CONFORMANCE WITH THE
NATIONAL BOARD OF FIRE UNDERWRITERS' RECOMMENDATIONS.
25. SUBMITTALS ARE NOT REQUIRED IF CONTRACTOR ELECTS TO USE THE PROPRIETARY PRODUCTS LISTED. SUBMITTALS WILL BE REQUIRED IF CONTRACTOR
WISHES TO USE ALTERNATE PRODUCTS. ALL ALTERNATE PRODUCTS ARE SUBJECT TO REVIEW AND APPROVAL BY THE ENGINEER AND OWNER.
26. CONTRACTOR SHALL CALL MISS UTILITY AT 1-800-552-7001 BEFORE CONSTRUCTION COMMENCES.
27. TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE TRIMM ED OR CUT ONLY WITH THE APPROVAL OF THE OWNER
AND ENGINEER. ANY TREES OR PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT ARE DAMAGED BY CONTRACTOR
OR HIS SUB -CONTRACTORS, SHALL BE REPLACED BY CONTRACTOR AT NO ADDITIONAL COST.
FIRE PREVENTION:
1. SMOKING SHALL ONLY BE ALLOWED IN DESIGNATED SPACES WITH PROPER RECEPTACLES. "NO SMOKING" SIGNS SHALL BE POSTED AT EACH BUILDING
SITE AND WITHIN EACH BUILDING DURING CONSTRUCTION PER VIRGINIA STATEWIDE FIRE PREVENTION CODE.
2. OVERHEAD WIRING OR OTHER OVERHEAD OBSTRUCTIONS SHALL NOT BE LOWER THAN 13 FEET 6 INCHES OVER A PUBLIC STREET PER THE VIRGINIA
STATEWIDE FIRE PREVENTION CODE.
3. CONTRACTOR SHALL ENSURE THAT BUILDING STREET NUMBERS ARE PLAINLY VISIBLE FROM THE FRONTAGE STREET AT ALL TIMES DURING
CONSTRUCTION FOR EMERGENCY RESPONDERS, PER VIRGINIA STATEWIDE FIRE PREVENTION CODE.
4. WASTE AND COMBUSTIBLE DEBRIS SHALL BE REMOVED FROM THE BUILDING AT THE END OF EACH DAY AND DISPOSED OF IN ACCORDANCE WITH
VIRGINIA STATEWIDE FIRE PREVENTION CODE.
5. OPERATIONS INVOLVING THE USE OF CUTTING AND WELDING SHALL BE DONE IN ACCORDANCE, WITH CHAPTER 35 OF THE VIRGINIA STATEWIDE FIRE
PREVENTION CODE.
6. FIRE EXTINGUISHERS SHALL BE PROVIDED WITH NOT LESS THAN ONE APPROVED PORTABLE FIRE EXTINGUISHER AT EACH STAIRWAY ON ALL FLOOR
LEVELS WHERE COMBUSTIBLE MATERIALS HAVE ACCUMULATED IN ACCORDANCE WITH THE VIRGINJIIASTATEWIDE FIRE PREVENTION CODE.
7. VEHICULAR ACCESS FOR FIRE FIGHTING SHALL BE PROVIDED AT ALL CONSTRUCTION AND DEMOLITION SITES AND TO WITHIN 100 FEET OF TEMPORARY
OR PERMANENT FIRE DEPARTMENT CONNECTIONS. VEHICULAR ACCESS SHALL BE CAPABLE OF SUPPORTING FIRE APPURTENANCE AND VEHICLE LOADING
UNDER ALL WEATHER CONDITIONS IN ACCORDANCE WITH THE VIRGINIA STATEWIDE FIRE PREVENTION CODE.
CONCRETE AND ASPHALT:
1. ALL MATERIAL INSIDE FORMS SHALL BE CLEAN AND FREE OF ALL ROCKS AND OTHER LOOSE DEBRIS. SUB -BASE MATERIAL SHALL BE COMPACTED BY
MECHANICAL MEANS.
2. CONCRETE SHALL NOT BE PLACED UNLESS THE AIR TEMPERATURE IS AT LEAST 40 DEGREES FAHRENHEIT (F) IN THE SHADE AND RISING.
3. CONCRETE SHALL NOT BE PLACED UNTIL STEEL DOWELS HAVE BEEN INSTALLED IN EXISTING CONCRETE IN ACCORDANCE WITH ALBEMARLE COUNTY
STANDARDS.
4. 1/2 " PREMOLDED EXPANSION JOINT MATERIAL SHALL BE PLACED AT A MAXIMUM OF 30' INTERVALS ON NEW SIDEWALK, CURB, CURB & GUTTER, AT
EACH END OF DRIVEWAY ENTRANCES, AT EACH END OF HANDICAP RAMPS, SOME POINT ON ENTRANCE VVALKS AND STEPS ADJUSTMENTS, AND ALONG
BUILDINGS AND WALLS WHERE NEW CONCRETE SIDEWALKS ARE PLACED AGAINST THEM.
5. ALL EXISTING CURBS, CURB & GUTTER, SIDEWALK AND STEPS TO BE REMOVED SHALL BE TAKEN OUT TO THE NEAREST JOINT. DEMOLITION AND
DISPOSAL COST TO BE INCLUDED IN OTHER UNIT BID ITEMS. NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK.
6. EXISTING ASPHALT CONCRETE PAVEMENT SHALL BE SAW CUT AND REMOVED AS PER THE SPECIFICATIONS. REMOVAL SHALL BE DONE IN SUCH A
MANNER AS TO NOT TEAR, BULGE OR DISPLACE ADJACENT PAVEMENT. EDGES SHALL BE CLEAN AND VERTICAL, ALL CUTS SHALL BE PARALLEL OR
PERPENDICULAR TO THE DIRECTION OFTRAFFIC.
7. DISPOSAL OF ALL EXCESS AND DEMOLITION MATERIAL IS THE RESPONSIBILITY OFTHE CONTRACTOR.
UTI LITI ES:
ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES:
1.
PRIOR TO CONSTRUCTION OR EXCAVATION, THE CONTRACTOR SHALL ASSUME RESPONSIBILITY OF LOCATING ANY AND ALL UNDERGROUND UTILITIES
1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE
uj
(PUBLIC OR PRIVATE) THAT MAY EXIST WITHIN OR CROSS THROUGH THE AREA OF CONSTRUCTION WHETHER OR NOT THEY ARE SHOWN ON THE PLANS.
OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS
PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CALL 'MISS UTILITY OF VIRGINIA' AT 1-800-552-7001. THE CONTRACTOR SHALL BE
OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALLGOVERN.
RESPONSIBLE FOR REPAIRING, AT HIS SOLE EXPENSE, ANY EXISTING UTILITY DAMAGED DURING CONSTRUCTION.
2. ALL MATERIALS AND CONSTRUCTION) METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED.
2.
THE PLAN DOES NOT GUARANTEE THE EXISTENCE, NONEXISTENCE, SIZE, TYPE, LOCATION, ALIGNMENT, OR DEPTH OF ANY OR ALL UNDERGROUND UTILITIES
3. ERASION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE
OR OTHER FACILITIES. WHERE SURFACE FEATURES (MANHOLES, CATCH BASINS, VALVES, ETC.) ARE UNAVAILABLE OR INCONCLUSIVE. INFORMATION SHOWN
INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION.
MAY BE FROM UTILITY OWNER'S RECORDS AND/QR ELECTRONIC LINE TRACING, THE RELIABILITY OF WHICH IS UNCERTAIN. THE CONTRACTOR SHALL
PERFORM TEST EXCAVATIONS OR OTHER INVESTIGATION AS NECESSARY TO VERIFY LOCATION AND CLEARANCES.
4. ALLSLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED.
3.
WHEN THE WORK CROSSES EXISTING UTILITIES, THE EXISTING UTILITIES SHALL BE ADEQUATELY SUPPORTED AND PROTECTED FROM THE DAMAGE DUE TO
5, THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (H ORI ZONTAL:VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE
THE WORK. ALL METHODS FOR SUPPORTING AND MAINTAINING THE EXISTING UTILITIES SHALL BE APPROVED BY THE RESPECTIVE UTILITY COMPANY
ACHIEVED.
AND/OR THE ENGINEER. CONTRACTOR SHALL EXERCISE CARE TO INSURE THAT THE GRADE AND ALIGNMENT OF EXISTING UTILITIES ARE MAINTAINED AND
6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED
THAT NO JOINTS OR CONNECTIONS ARE DISPLACED. BACKFILL SHALL BE CAREFULLY PLACED AND COMPACTED TO PREVENT FUTURE DAMAGE OR
SETTLEMENT TO EXISTING UTILITIES. ANY UTILITIES REMOVED AS PART OF THE WORK, AND NOT INDICATED TO BE REMOVED OR ABANDONED, SHALL BE
NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL.
RESTORED USING MATERIALS AND INSTALLATION EQUAL TO THE UTIDTY'S STANDARDS.
7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES.
4.
CONTRACTOR SHALL NOTIFY LANDOWNERS, TENANTS AND THE ENGINEER A MINIMUM OF 72 HOURS PRIOR TO THE INTERRUPTION OF ANY SERVICES.
8 UNLESS OTHERWISE NOTED ALLCONCRETE PIPESHALL BE REINFORCED CONCRETE PIPE -CLASS 111,
SERVICE INTERRUPTIONS SHALL BE KEPT TQ A MINIMUM.
9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART
5.
CONTRACTOR TO MAKE ANY NECESSARY ADJUSTMENTS TO ALL UTILITY JUNCTION BOXES, VALVE BOXES, MANHOLES, CLEAN -OUTS, AND OTHER GRADE
1926).
RELATED ITEMS IN SIDEWALK, ROADWAY, AND/OR ADJACENT AREAS TO MATCH FINISHED GRADE. COSTS ARE TO BE INCLUDED UNDER THE VARIOUS UNIT
BID ITEMS. NO SEPARATE PAYMENT WILL BE MADE.
EARTH WORD AND SITE CONDITIONS:
1.
EXCEPT AS OTHERWISE SHOWN ON THE PLANS, ALL CUTS AND FILLS SHALL BE NO GREATER THAN 3:1.
2.
UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS, ALL FILL MATERIALS SHALL BE COMPACTED TO 95% OF THEORETICAL MAXIMUM
DENSITY AS DETERMINED BY AASHTO T-99 METHOD A, WITHIN PLUS OR MINUS 2% OF OPTIMUM MOISTURE, FOR THE FULL WIDTH AND THE DEPTH OF THE
FI LL.
3.
THE CONTRACTOR SHALL ADD, CHANGE, OR RELOCATE EROSION AND SEDIMENT CONTROLS AT THE DIRECTION OF THE ALBEMARLE COUNTY E&S
INSPECTOR TO THEIR SATISFACTION AT NO ADDITIONAL COST TO THE OWNER.
4.
ALLGRADING AND IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA UNLESS OTHERWISE INDICATED.
5.
PROPOSED GRADES SHALL BE FIELD ADJUSTED TO CONFORM TO TH'E INTENT OF THE TYPICAL SECTIONS. A SMOOTH GRADE SHALL BE MAINTAINED FROM
THE BASELINE TO THE PROPOSED EDGE OF PAVEMENT OR FACE OF CURB TO PRECLUDE THE FORMING OF FALSE GUTTERS AND/OR PONDING OF WATER ON
ALL PAVED SURFACES.
6.
CONTRACTOR SHALL MAINTAIN) A SMOOTH GRADE TO THE PROPOSED? EDGE OF PAVEMENT OR FACE OF CURB TO PROVIDE POSITIVE DRAINGE ON ALL PAVED
SURFACES. ANY AREAS WHERE WATER IS IMPOUNDED SHALL BE iCORRECTED BY CONTRACTOR AT NO ADDITIONAL COST. POSITIVE DRAINAGE OF ALL
ROADWAY AREAS TO THE STORM DRAIN INLETS OR OTHER ACCEPTABLE DRAINAGE CHANNELS AS NOTED ON THE PLANS IS REQUIRED.
7.
CONTRACTOR SHALL MAINTAIN EXISTING STREAMS, DITCHES, DRAINAGE STRUCTURES, CULVERT AND FLOWS AT ALL TIMES DURING THE WORK.
CONTRACTOR SHALL PAY FOR ALL PERSONAL INJURY AND PROPERTY DAMAGE WHICH MAY OCCUR AS A RESULT OF FAILING TO MAINTAIN ADEQUATE
DRAINAGE.
8.
ALL PIPES, DI'S AND OTHER STRUCTURES SHALL BE INSPECTED BY THE ENGINEER BEFORE BEING BACKFILLED OR BURIED. THE ENGINEER MAY REQUIRE
CONTRACTOR, AT NO ADDITIONAL COST, TO UNCOVER AND RE -COWER SUCH STRUCTURES IF THE HAVE BEEN BACKFILLED OR BURIED WITHOUT SUCH
INSPECTION.
9.
ALLSTORM CHANNELS, DRAINS, AND SEWER SYSTEMS SHALL BE CLEANED UPON COMPLETION OFTHE PROPOSED WORK. SEDIMENT, CHEMICALS, AND/OR
DEBRIS REMOVED FROM THESE SYSTEMS SHALL BE REMOVED AND DISPOSED OF PROPERLY.
MAINTENANCE OF TRAFFIC:
1.
TEMPORARY STREET CLOSURE PERMIT REQUIRED FOR CLOSURE OF SIDEWALKS, PARKING SPACES AND ROADWAYS AND IS SUBJECT TO APPROVAL BY THE
ALBEMARLE COUNTY TRAFFIC ENGINEER.
2.
THE VIRGINIA WORK AREA PROTECTION MANUAL AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) SHALL GOVERN ALL TEMPORARY
TRAFFIC CONTROL OPERATIONS THROUGHOUT CONSTRUCTION OF THIS PROJECT. ADHERENCE TO APPLICABLE PROVISIONS OF THE MANUAL IS REQUIRED
OFTHE CONTRACTOR EVEN THOUGH DETAILED REFERENCETO ALLSIUCH PROVISIONS MAY NOT BE CONTAINED IN THE PLANS.
GENERAL NOTES
<
3.
ALL EXISTING RESIDENTIAL AND COMMERCIAL ENTRANCES SHALL BE MAINTAINED AT ALL TIMES, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
C
4.
NO TEMPORARY PAVEMENT MARKING SHALL BE ALLOWED ON THE FI NAL ASPHALT SURFACE COURSE.
� 0'
5.
THE CONTRACTOR SHALL MAINTAIN ALL LANES OF TRAVEL OPEN FROM 6:30 AM TO 9:00 AM AND 3:00 PM TO 5:00 PM UNLESS DEEMED UNNECESSARY BY
00
THE ENGINEER. SHORT PERIODS OF ONE WAY FLAGGING OPERATIONS MAY BE CONDUCTED OUTSIDE THE HOURS MENTIONED ABOVE.
6.
ALLTRAFFIC SIGNALS SHALL BE ADJUSTED AS DEEMED NECESSARY 'BY THE ENGINEER PRIOR TO ANYTRAFFIC CHANGES.
C.3
7.
WHEN WORK IN THE EXCAVATION AREA IS DISCONTINUED FOR ASHORT PERIOD OF TIME, AS AT NIGHT, THE CONTRACTOR SHALL BACKFILL THE CUT AREAS
C
ADJACENT TO THE BUSTING PAVEMENT WITH A TILLET OF MATERIAL'. THE FILLET SHALL BE COMPOSED OF THE SAME MATERIAL (EXCAVATION, BORROW,
IN THE PRICE BID FOR OTHER BID ITEMS OF
< O
BASE COURSE, ETC.) ALL COSTS FOR PLACING AND REMOVING THIS FILLET OF MATERIAL SHALL BE INCLUDED
n Lu
WORK ON THIS PROJECT, AND NO ADDITIONAL CHARGE WILL BE ALLOWED.
�.�.
8.
EXISTING SURFACE, AGGREGATE BASE AND SUBBASE MATERIAL WHICH WILL BE DEMOLISHED OR OBLITERATED DURING CONSTRUCTION AND WHICH IS
d
SUITABLE FOR MAINTENANCE OF TRAFFIC AS DETERMINED BY THE ENGINEER, SHALL BE SALVAGED AND UTILIZED FOR MAINTENANCE OF TRAFFIC PRIOR TO
E
THE USE OF COMMERCIAL MATERIAL. WHEN NOT SPECIFIED AS /A SEPARATE PAY ITEM, THE REMOVAL AND SALVAGING OF EXISTING SURFACES ANDW
AGGREGATE BASE AND SUBBASE MATERIAL WILL BE MEASURED AND PAID FOR AS REGULAR EXCAVATION IN ACCORDANCE WITH SECTION 303 OF THE VDOT
O m
ROAD AND BRIDGE SPECIFICATIONS.
<
9.
CONSTRUCT ALL INTERSECTIONS AND DRIVEWAYS UNDER TRAFFIC.
10.
IF USED, TEMPORARY TRAFFIC BARRIER SERVICE SHALL BE INSTALLED AND REMOVED SO AS NOT TO PRESENT ANY BLUNT END OR HAZARD TO THE
MOTORING PUBLIC.
11.
CONTRACTOR SHALL NOTIFY TRANSIT PROVIDERS A MINIMUM OF TVWO WEEKS PRIOR TO ANY IMPACT OR DISRUPTION TO REGULAR SERVICE OR STOPS.
12.
ALL EXISTING PAVEMENT MARKINGS CONFLICTING WITH PROPOSED CONSTRUCTION PAVEMENT MARKINGS (IF USED) SHALL BE ERADICATED.
13.
INSTALLATION AND REMOVAL OF TEMPORARY TRAFFIC CONTROL 'DEVICES SHALL BE IN ACCORDANCE WITH THE SECTION 6G.25 OF THE WORK AREA
PROTECTION MANUAL.
14.
USE APPROPRIATE SIGNS TO SHIFT PEDESTRIAN TRAFFIC AS NEEDED.
15.
CONTRACTOR SHALLASSURE ENDS OF TEMPORARY CONCRETE BARRIER (IF USED) DO NOT OBSTRUCT INTERSECTION SIGHT LINES.
WORD AREA PROTECTION AND MAINTENANCE:
1. CLEARING AND GRUBBING SHALL BE CONFINED TO THOSE AREAS NEEDED FOR CONSTRUCTION, AND AS SHOWN IN THE DRAWINGS.
2. DISTURBED AREAS BEYOND THE ROADWAY CURB AND WHERE INDICATED ON THE PLANS SHALL RECEIVE TOPSOIL AS NECESSARY AND AS DIRECTED.
SEEDING MIXTURE SHALL BE DETERMINED BYTHE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION 3.32
3. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY AND ANY TEMPORARY OR PERMANENT EASEMENT SHOWN ON THE PLANS. HOWEVER,
CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO COORDINATE ACCESS AND
TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON
SHALL BE COORDINATED WITH THE ENGINEER. CONTRACTOR'S FAILURE TO NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE ENGINEER
MAY RESULT IN DELAYS. NO ADDITIONAL COMPENSATION OR TIME FOR PERFORMANCE WILL BE GIVEN FOR ANY SUCH DELAYS.
4. CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS
MATERIAL COLLECTED SHALL BE DISPOSED OF OFF THE WORK SITE IBY CONTRACTOR, AT HIS EXPENSE.
5. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, DRIVEWAYS, POLES, SIGNS, RIGHT -QF -WAY MONUMENTS, MAILBOXES
AND THE LIKE SHALL BE PROTECTED FROM DAMAGE DURING THE. WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SHALL BE REPAIRED OR REPLACED BY
CONTRACTOR AT NO ADDITIONAL COST. PROPERTY PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE
RESTORED BY LICENSED SURVEYOR AT THE CONTRACTOR'S EXPENSE.
6. MEASURES TO CONTROL EROSION AND SEDIMENT SHALL BE PROWIDED PURSUANT TO AND IN COMPLIANCE WITH CURRENT FEDERAL, STATE AND LOCAL
REGULATIONS. THE INFORMATION CONTAINED IN THE CONSTRUICTION PLANS AND/QR APPROVAL OF THE PLANS SHALL IN NO WAY RELIEVE THE
CONTRACTOR OR HIS AGENT OF ANY LEGAL RESPONSIBILITY WHICCH MAY BE REQUIRED BY THE CODE OF VIRGINIA OR ANY ORDINANCE ENACTED BY THE
CITY OF CHARLOTTESVILLE. CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES, OR TEMPORARY CULVERTS REQUIRED TO PREVENT
MUD AND DEBRIS FROM BEING WASHED ONTO THE STREETS OR ADJACENT PROPERTY. CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT MUD
OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS.
7. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF WORK. TOPSOIL SEED,
FERTILIZER AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ALBEMARLE COUNTY STANDARDS ON ALL DISTURBED AREAS. A PERMANENT STAND OF
GRASS ADEQUATE TO PREVENT EROSION SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. ALL EROSION AND SEDIMENT CONTROLS SHALL BE
REMOVED WITHIN 30 DAYS AFTER THE PROJECT IS STABILIZED. (MS -18)
8. FOR FURTHER REQUIREMENTS AND DETAILS OF TREE PRESERVATION, PLANTING, EROSION AND SEDIMENT CONTROL, REFER TO THE VIRGINIA EROSION
AND SEDIMENT CONTROL HANDBOOK.
9. AN EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION (E.S.C.C.C) IS REQUIRED FOR ALL LAND DISTURBANCE ACTIVITIES,
10. THE CONTRACTOR SHALL PROPERLY INSTALL AND MAINTAIN EROSIION AND SEDIMENT CONTROLS FOR THE LIFE OF THE PROJECT; AND ROUTINELY CHECK
CONTROL DEVICES BEFORE, DURING AND AFTER STORM EVENTS.
TOPOGRAPHY SOURCE NOTES:
TOPOGRAPHY SOURCE: ACTUAL TOPOGRAPHIC GROUND SURVEY PERFORMED ON OCTOBER 24, 2018 AS REQUIRED BY ALBEMARLE COUNTY.
BASIS OF DATUM: HORIZONTAL: INAD-83 VIRGINIA STATE PLANE SOUTH ZONE
VERTICAL: NAV(D-88
SUGGESTED CONSTRUCTION SEQUENCING:
1. PROTECT ADJACENT AREAS FROM DAMAGE DUE TO CONSTRUCTION ACTIVITIES.
2. INSTALL PERIMETER CONTROL MEASURES AS INDICATED ON PLANS INCLUDING SAFETY FENCE, SILT FENCE, AND TREE PROTECTION
3. CLEAR AND GRUB EXISTING GROUPED COVER AND DEMOLISH EXISTING ITEMS MARKED FOR DEMOLITION.
4. GRADE SITE TO FINAL GRADES PER; PLANS.
5. FORM AND INSTALL CONCRETE WORK.
6. STABILIZE ALL AREAS AND REPAIR .ANY EROSION AND REMOVE ANY SEDIMENT.
7. INSTALL REMAINING SITE FEATURES.
8, DRESS AND OVERSEER ALL DISTURBED AREAS AS NECESSARY TO AFFECT PERMANENT VEGETATIVE COVER.
9. REMOVE PERIMETER CONTROL MEASURES ONLY UPON APPROVAL OF COUNTY INSPECTOR.
126`2018 t
JDA i'1 I E L,;,.`''.r�
HYEIt >
Lie. No E4 45596
10NA1,
A P'E:? DCH
SUBMITTAL NO. 3
OJ E0 -r 1800400
LINE + GRADE
KIM
PM]
I L T ti OP
DANIEL,
49
IT
o Llc,N'o PE -�j45596 ,,
A I V-
APPR(DV7F4-*" DCH
SUBMITTAL NO. 3
P RO-1 ECT 1809400
THE VV'ORK OF
LIN 'E + GRADE
Si
I L T ti OP
DANIEL,
49
IT
o Llc,N'o PE -�j45596 ,,
A I V-
APPR(DV7F4-*" DCH
SUBMITTAL NO. 3
P RO-1 ECT 1809400
THE VV'ORK OF
LIN 'E + GRADE
uc
CL
TH
Lu
cf)
66
Lli
L ]No IPE 45596
xi
APPRO-7,7"
DCH
SUBMITTAL NO.
3
PROJECT 1809400
PROJECT DESCRIPTION:
THIS PROJECT CONSISTS OF MAINTENANCE ACTIVITIES ASSOCIATED WITH AN EXISTING CAMPGROUND. MAINTENANCE ACTIVITIES INCLUDE THE
CONSTRUCTION OF DRAINAGE IMPROVEMENTS AND SITE GRADING. THE DISTURBANCE AREA ASSOCIATED WITH THIS PROJECT IS ±1.60 AC (69,786 SF). IT
IS ANTICIPATED THAT THE WORK WILL START IN NOVEMBER 2018 AND LAST 4 TO 6 MONTHS.
EXISTING SITE CONDITIONS:
THE SITE CONSISTS MAINLY OF AN EXISTING FLAT FIELD THAT HAS BEEN COMPACTED OVER USE AND NO LONGER DRAINS EFFECTIVELY. RECREATIONAL
VEHICLE PARKING SPOTS AND UTILITY CONNECTIONS SURROUND THE FIELD ON THE WEST AND SOUTH SIIDE OF THE FIELD, AND ARE ACCESSED BYAN
EXISTING GRAVEL ROAD. TO THE NORTH AND EAST ARE CAMPGROUND AMENITIES AND ASSOCIATED BUILDINGS, ALONG WITH A PAVED ENTRANCE ROAD TO
THE EAST. THE SLOPES WITHIN THE PROJECT AREA RANGE FROM 0% TO 2%!
ADJACENT AREAS:
THE PROPOSED PROJECT IS BORDERED BY EXISTING ACTIVE FARMLAND TO THE WEST AND ADDITIONAL CAMPSITE AND RV AREAS TO THE EAST. TO THE
NORTH IS A FAIRLY STEEP SLOPE ABOVE WHICH RUNS ROUTE 250. DIRECTLY TO THE SOUTH OF THE GRAWEL ACCESS ROAD IS THE 100 -YEAR FLOODPLAIN
ASSOCIATED WITH STOCKTON CREEK, WHICH RUNS WEST TO EAST. SOME OFTHE EXISTING RV PARKING SITES ARE WITHIN THE LIMITS OFTHE
FLOODPLAIN, HOWEVER THESE WILL NOT BE MODIFIED. THE WATER PROTECTION ORDINANCE BUFFER IS CONCURRENT WITH THE LIMITS OFTHE 100 -YEAR
FLOODPLAIN.
OFF-SITE AREAS:
IT IS NOT ANTICIPATED THAT ANY OFF-SITE AREAS WILL BE DISTURBED DURING CONSTRUCTION. THIS WOIRK WILL REQUIRE A NET FILL CONDITION, AND
STOCKPILE AREAS ARE LABELED ON THE PLANS. UNSUITABLE MATERIALS RESULTING FROM THE PROPO-SED WORK SHALL BE HAULED FROM THE SITE AND
DISPOSED OF AT AN APPROVED DISPOSAL SITE PERMITTED SEPARATELY FROM THIS PROJECT.
SOILS:
SEE THE USDA SOILS DELINEATION MAP ON THIS SHEET.
CRITICAL AREAS:
CRITICAL AREAS CONSIST OF THE FLOODPLAIN TO THE SOUTH AND THE HEDGE OF MATURE TREES ALONG THE WESTERN PROPERTY LINE. THE
CONTRACTOR SHALL TAKE EXTRA CARE TO PREVENT SEDIMENTATION OR EROSION OFTHE FLOODPLAIN AND THE CRITICAL ROOT ZONES OF TH E TREES.
EROSION & SEDIMENT CONTROL MEASURES:
REFER TO THIS SHEET FOR A LIST OF ALL PROPOSED EROSION AND SEDIMENT CONTROL MEASURES TO BE USED ON SITE.
PERMANENT STABILIZATION:
THE SITE WILL BE STABILIZED THROUGH THE USE OF PERMANENT SEEDING, STONE AND RIPRAP, AND LANDSCAPING. SEEDING INFORMATION, DATES AND
AMENDMENTS ARE INCLUDED ON THE PLANS. SOILTESTING SHALL BE COMPLETED THE CONTRACTOR TO DETERMINE THE SUITABILITY OF EXISTING SOILS
AND THE NEED FOR ANY SOIL AMENDMENTS TO ENSURE THAT PERMANENT SEEDING WILL GROW EFFECTIVELY.
STORM WATER RUNOFF CONSIDERATIONS:
THE MAJORITY OF STORMWATER RUNOFF DURING CONSTRUCTION WILL BE DIRECTED TO A SEDIMENT TRAP LOCATED AT THE SOUTHEAST CORNER OF THE
SITE. CLEAN WATER FROM UP -GRADIENT OF THE SITE SHALL BE DIRECTED AROUND THE SITE TO AN EXISTING CULVERT VIA A DIVERSION DIKE. ANY AND
ALL RUNOFF FROM THE SITE SHALL BE DIRECTED TO APPROPRIATE EROSION AND SEDIMENT CONTROLS TO CLEAN WATER BEFORE DISCHARGING TO AN
ADEQUATE OUTFALL PROTECTED FROM EROSION AND SEDIMENT.
MAINTENANCE:
ALL E&S MEASURES SHALL BE INSPECTED REGULARLY AS REQUIRED BY STATE STANDARDS AND MAINTAINED IN GOOD WORKING ORDER. REQUIRED
REPAIRS SHALL BE MADE IMMEDIATELY. SEE THE MAINTENANCE NARRATIVE ON THIS SHEET FOR SPECIFIIC MAINTENANCE ITEMS AND INSPECTION TIMES.
SEQUENCE OF CONSTRUCTION:
1. CONTRACTOR SHALL CONDUCT A PRE -CONSTRUCTION MEETING WITH THE PLAN APPROVING AUTHORITY PRIOR TO ANY LAND DISTURBANCE OR E&S CONTROL
INSTALLATIONS.
2. INSTALL CONSTRUCTION ENTRANCE, PERIMETER CONTROLS AND TREE PROTECTION PRIOR TO ANY DISTURBANCE.
3. INSTALL STORMWATER INLET PROTECTION AROUND EXISTING DRAINAGE STRUCTURES.
4. PROTECT PERMANENT VEGETATION FOR THE DURATION OF THE PROJECT.
5. CONSTRUCT NEW STORM STRUCTURES, IF APPLICABLE, STARTING ATTHE DOWNSTREAM TERMINUS OR TIE-IN.
6. BACKFILL EXCAVATION AND TRENCH AREAS.
7. FOR GRASSY AREAS: INSTALL PERMANENT SEEDING AND MULCH. STABILIZE ALL DISTURBED AREAS.
8. FOR GRAVEL AREAS: RESTORE GRAVEL AFTER TRENCHING AND EXCAVATION OPERATIONS ARE COMPLETE
9. REPAIR ANY EROSION AND REMOVE ANY SEDIMENT.
10. DRESS AND OVER -SEED ALL DISTURBED AREAS AS NECESSARY TO AFFECT PERMANENT VEGETATIVE COVER. STABILIZE ALL REMAINING DISTURBED AREAS
WITH TOPSOIL, SEED, AND MULCH ONCE WORK IS COMPLETE. ,
11. AFTER FINAL SITE STABILIZATION AND APPROVAL FROM THE APPROPRIATE EROSION AND SEDIMENT CONTROL AUTHORITY, THE SILT FENCE, INLET PROTECTION
AND OTHER STABILIZATION MEASURES SHALL BE REMOVED.
38° Z 2r N
38° 2 13" N
Hydrologic Soil Group -Albemarle County, Virginia
(Misty Mountain Campground)
Area of interest (AOI)
M
C
4D
Ashe loam, 15 to 25
B
Area of Interest (AOI)
CID
percent slopes
Solis
D
i 14D
Chester loam, 15 to 25
B
Soil Rating Polygons
percent slopes
A
El
Not rated or not available
116
Chewacla silt loam
B/D
ND
Water Features
Streams and Canals
256
Dyke silt loam, 2 to 7
B
B
percent slopes
Transportation
-
- _-----
BID
Rails
55B
McQueen loam, 2 to 7
C
percent slopes
0
C
Interstate Highways
Interest
0CID
US Routes
Totals for Area
----
of
---
I
D
Major Roads
Not rated or not available
focal Roads
0.3
0.0
10.8
0.0
1.6
12.7
N 3B' 2' 27N
38° 2' 13 N
2.3%
0.0%
85.1%
0.0%
12.6%
100.0%
EROSION AND SEDIMENT CONTROL MEASURES:
UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES LISTED BELOW, AND ANY OTHER EROSION CONTROL PRACTICES
REQUIRED SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WI1TH THE MINIMUM STANDARDS AND SPECIFICATIONS OFTHE LATEST EDITION OF
THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS AND VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, OR ALBEMARLE COUNTY
STANDARDS, WHICHEVER ARE MORE STRINGENT,
TEMPORARY STONE CONSTRUCTION ENTRANCE - 3.02
A PAVED OR STABILIZED STONE PAD WITH A FILTER FABRIC UNDERLINER' LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION
SITE.
CONSTRUCTION ROAD STABILIZATION - 3.03
TH E TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, (PARKING AREAS, AND OTHER ON-SITE VEHICLE TRANSPORTATION ROUTES WITH
STONE IMMEDIATELY AFTER GRADING.
SILT FENCE - 3.05
A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND
ENTRENCHED.
CULVERT INLET PROTECTION - 3.08
ASEDIMENT FILTER LOCATED AT THE INLET TO STORM SEWER CULVERTS.
TEMPORARY DIVERSION DIKE - 3.09
ATEM PORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR IBASE OF ASLOPING DISTURBED AREA.
TEMPORARY SEDIMENT TRAP - 3.13
ATEMPORARY PONDING AREA FORMED BY CONSTRUCTING AN EARTHEN EIMBANKMENT WITH ASTONE OUTLET.
OUTLET PROTECTION - 3.18
A PERMANENT OUTLET PROTECTION MEASURE THAT CONSISTS OF STRUiCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES
PLACED AT THE OUTLETS OFALL PIPES OR PAVED CHANNEL SECTIONS.
TEMPORARY SEEDING - 3.31
THE ESTABLISHMENT OFA TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR PERIODS OF 30 DAYS
TO ONEYEAR BY SEEDING WITH APPROPRIATE RAPIDLY -GROWING ANNUAL_ PLANTS. THIS MEASURE WILLALSO FUNCTION AS DUST CONTROL FOR THE SITE.
PERMANENT SEEDING - 3.32
THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING SEED ON ROUGH -GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A
YEAR OR MORE OR WHERE PERMANENT VEGETATIVE COVER IS NEEDED ON FINE -GRADED AREAS IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL
TECHNICAL BULLETIN NO. 4: NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES.
TREE PRESERVATION & PROTECTION - 3.38
PROTECTION OF DESIRABLE TREES FROM MECHANICALAND OTHER INJURE DURING LAND DISTURBING AND CONSTRUCTION ACTIVITY.
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
ES -1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTUIRAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND
MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND
VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC50-30).
ES -2: THE PLAN -APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE
COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND
DISTURBER MUST BE PROVIDED TO THE PLAN -APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE LAND -DISTURBING ACTIVITYSHOWN ON
THE APPROVED PLAN. IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE LAND -DISTURBING ACTIVITY, THE PLAN'S APPROVAL WILL BE
REVOKED.
ES -3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO ORAS SOON AS THE FIRST STEP IN CLEARING
ES -4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALLTIMES.
ES -5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF
SITE BORROW OR WASTED AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND
APPROVAL BY THE PLAN APPROVING AUTHORITY.
ES -6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
ES -7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND
DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN -APPROVING AUTHORITY, THE
CONTROLS SHALL BE REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF TEMPORARY MEASURES
SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
ES -8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
ES -9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND IMMEDIATELY AFTER EACH RUNOFF -PRODUCING
RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE
IMMEDIATELY.
ES -10: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN TRANSPORTED ONTO A PAVED OR PUBLIC ROAD
SURFACE.
ES -11: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER; REACHING FINAL GRADE OR UPON SUSPENSION OF GRADING OPERATIONS FOR AN
ANTICIPATED DURATION OF GREATER THAN 30 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA.
ES -12: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOILS WHICH MAY PRESENT
HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM ANIMAL. OR PLANT LIFE -
ES -13: A VSMP IS REQUIRED FOR PROJECTS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED CHESAPEAKE BAY PRESERVATION AREA (CBPA)
OR ONE ACRE OR GREATER OUTSIDE THE CBPA. FOR MORE INFORMATION VISIT THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMITTING
WEB PAGE AT: http://www.deq.virginia.gov/Programs/Water/StorrrnwaterManagement.aspx
MAINTENANCE:
IN GENERAL, ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH RAINFALL EVENT GREATER THAN 0.25
INCHES. MEASURES SHOULD BE CLEANED AND REPAIRED ACCORDING TO) THE FOLLOWING SCHEDULE AND THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK. THE FOLLOWING WILL BE CHECKED IN PARTICULAR:
1. THE CONSTRUCTION ENTRANCES AND CONSTRUCTION ROAD STABILIZATION AREAS SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY THROtUGH PERIODIC TOP DRESSING WITH ADDITIONAL STONE AND/OR WASHING AND
REWORKING OF EXISTING STONE.
2. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SILT FENCE AFTER EACH RAINFALL. UNDER NO CIRCUMSTANCES SHALL DEPOSITS BE ALLOWED TO
ACCUMULATE ABOVE HALF TH E HEIGHT OF THE FENCE. DAMAGED OR; UNDERCUT SILT FENCE SHALL BE REPAIRED IMMEDIATELY. SHOULD SILT FENCE
BECOME INEFFECTIVE OR REACH THE END OF THE EXPECTED USEABLE LIFE, FABRIC SHALL BE REPLACED IMMEDIATELY. UPON SILT FENCE REMOVAL,
DRESS ANY SEDIMENT DEPOSITS TO CONFORM WITH EXISTING GRADE AND SEED.
3. INLET PROTECTION SHALL BE CHECKED REGULARLY FOR SEDIMENT. IF EXCESSIVE SEDIMENT IS PRESENT, OR IF EXCESSIVE PONDING OCCURS AFTER
RAINFALL, THE STONE SHALL BE PULLED AWAY AND CLEANED OR REPLACED.
4. STONE USED IN CULVERT INLET PROTECTION SHALL BE INSPECTED REGULARLY FOR CLOGGING AND REPLACED AS NEEDED TO MAINTAIN FULL
FUNCTIONALITY. UNDER NO CIRCUMSTANCES SHALL SEDIMENT BE ALLOWED TO ACCUMULATE ABOVE ONE-HALF OF THE HEIGHT OF THE INLET
PROTECTION. ACCUMULATED SEDIMENT SHALL BE REMOVED AND UPSTREAM AREAS PERMANENTLY STABILIZED BEFORE THIS CONTROL IS REMOVED.
5. CHECK DAMS SHALL BE INSPECTED REGULARLY TO ENSURE THE CENTER OF THE DAM IS LOWER THAN THE EDGES, SEDIMENT SHALL BE REMOVED
WHEN IT REACHES ONE HALF THE HEIGHT OFTHE DAM.
6. ANY SOIL WITHIN TREE PROTECTION AREAS THAT IS INADVERTENTLYCOMPACTED SHALL BE AERATED WITH AN IRON BAR EVERY 18 INCHES TO A DEPTH
OF 12 INCHES. PHYSICAL DAMAGE TO TREES SHALL BE REPAIRED AS OUTLINED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION
3.38. TREES THAT ARE STRESSED OR DAMAGED SHALL RECEIVE AN APPROPRIATE APPLICATION OF FERTILIZER TO AID RECOVERY.
7. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS
NEEDED.
8. ALL TEMPORARY EROSION AND SEDIMENT MEASURES SHALL BE DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED
AND VEGETATION IS ESTABLISHED. FINAL SITE STABILIZATION SHALL BE APPROVED BY THE OWNER AFTER THE INSPECTOR HAS DETERMINED THAT THE
SITE IS STABILIZED.
ALBEMARLE COUNTY GENERAL E&S NOTES:
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE
COMMENCEMENT OF LAND DISTURBIING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT
CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
4. A COPY OF THE APPROVED EROSION SAND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE
BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL
BY THE PLAN APPROVING AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION AS DETERMINED BYTHE PLAN APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING
SITE DEVELOPMENT UNTIL FINAL STNBILIZATION IS ACHIEVED.
8. DURING DEWATERING OPERATIONS, (WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY
NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
10. ALL FILL MATERIALTO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS,
WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28.
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00AM TO 9:OOPM.
15. BORROW, FILLOR WASTE ACTIVITY SHALLBE CONDUCTED IN ASAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD
TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR
COLLAPSE.
16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES
WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER
PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE AND IN THE MONTHS OF SEPTEMBER
TO FEBRUARY TO CONSIST A 50/50 M IX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY
THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 8OLBS/1OOSF. ALTERNATIVES ARE SUBJECT TO APPROVED BY
THE COUNTY EROSION CONTROL INSPECTOR -
18. PERMANENT STABILIZATION SHALL BIE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED
AT 90LBS/1OOOSF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1OOOLBS/ACRE AND CONSIST OF A 10-20-10
NUTRIENT MIX. PERMANENT SEEDINtG SHALL BE APPLIED AT 18OLBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL
RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY
EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS
TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALLSEEDED AREAS
ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT
TO HALFTHEIR HEIGHT MUST BE GLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES
ARE NO LONGER NEEDED, SUBJECT 70 APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
MANAGEMENT STRATEGIES:
THE FOLLOWING SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE CONSTRUCTION SCHEDULE FOR THIS
PROJECT AND SHALL APPLY TO ALLCONSTRUCTION ACTIVITIES WITHIN PROJECT LIMITS.
1. CONSTRUCTION WILL BE SEQUENCED SO THAT TRENCHING AND EXCAVATION OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE.
2. SOIL STOCKPILES WILL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES. STOCKPILES REMAINING FOR MORE THAN 14 DAYS SHALL
BE TEMPORARILY SEEDED.
3. THE CONTRACTOR SHALL USE APPROPRIATE CONSTRUCTION METHODS TO MINIMIZE DISTURBANCE ALONG MANAGED SLOPES AND EXISTING STEEP
SLOPES WHERE EROSION HAZARD IS HIGH.
4. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED WITH INLET PROTECTION SO THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM.
5. PREVIOUSLY GRASSED AREAS SHALL BE SEEDED AND STRAW MULCHED IMMEDIATELY AFTER TRENCHING OPERATION.
6. ALLTHE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED 48 HOURS AFTER EVERY RAIN EVENT GREATER THAN 0.25 INCHES AND
EVERY 5 DAYS EVEN IF A RAIN EVENT DOES NOT OCCUR. REQUIRED REPAIRS SHALL BE MADE AS NEEDED TO MAINTAIN DESIGNED STANDARD.
7. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVERED IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO
SURVIVE AND WILL INHIBIT EROSIOIN.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES.
MINIMUM STANDARD COMPLIANCE:
MS -1 HAVE TEMPORARY AND PERMANENT STABILIZATION BEEN ADDRESSED IN THE NARRATIVE? HAVE THE PROPOSED PRACTICES BEEN SHOWN ON
THE PLAN? YES
SEED SPECIFICATION YES MULCHING YES GRAVEL YES
MS -2 HAS STABILIZATION OF SOIL STOCKPILES BEEN ADDRESSED IN THE NARRATIVE? YES.
IS SEDIMENT TRAPPING MEASURES PROVIDED? YES.
MS -3 HAS MAINTENANCE OF PERMANENT STABILIZATION BEEN ADDRESSED? YES.
MS -4 ARE SEDIMENT TRAPPING FACILITIES TO BE CONSTRUCTED AS A FIRST STEP IN LDA? YES.
MS -5 HAS STABILIZATION OF EARTHEN STRUCTURES BEEN ADDRESSED? YES.
MS -6 ARE SEDIMENT BASINS REQIUI RED WHERE NEEDED?
MS -7 HAS STABILIZATION OF CUTAND FILL SLOPES BEEN ADEQUATELY ADDRESSED? YES.
MS -8 ARE PAVED FLUMES, CHANNIELS OR SLOPED DRAINS REQUIRED WHERE NECESSARY?
MS -9 HAS STABILIZATION THROUGH SURFACE ROUGHENING OR OUTLET PROTECTION BEEN ADDRESSED? YES.
MS -10 IS ADEQUATE INLET PROTECTFION REQUIRED ON ALL OPERATIONAL STORM SEWER INLETS? YES -
MS -11 HAS MAINTENANCE OF PERMANENT STABILIZATION BEEN ADDRESSED? YES.
MS -12 ARE IN STREAM CONSTRUCTION MEASURES REQUIRED SO THAT CHANNEL DAMAGE IS MINIMIZED?
MS -13 ARE TEMPORARY STREAM CROSSINGS OF NON -ERODIBLE MATERIAL REQUIRED WHERE APPLICABLE?
MS -14 THIS REGULATION REQUIRES THAT ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES BE FOLLOVr'VED.
MS -15 HAS RESTABILIZATION OFAR2EAS SUBJECT TO INSTREAM CONSTRUCTION BEEN ADEQUATELY ADDRESSED?
MS -16 IS STABILIZATION OF UTILITY' TRENCHES ADDRESSED? YES.
MS -17 IS THE TRANSPORT OF SOIL AND MUD ONTO PUBLIC ROADWAYS PROPERLY CONTROLLED? (I.E. CONSTRUCTION ENTRANCES, WASH RACKS,
DAILY CLEANING OF ROADWAYS, TRANSPORT OF SEDIMENT TO ATRAPPING FACILITY) YES.
MS -18 HAS THE REMOVAL OFTEMP'ORARY PRACTICES BEEN ADDRESSED? YES.
HAS MAINTENANCE OF PRACTICES BEEN ADDRESSED? (I.E. REPAIR OF STRUCTURES AND REMOVAL OF ACCUMULATED SEDIMENT) YES.
MS -19 ARE PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT ADEQUATELY PROTECTED FROM EROSION AND SEDIMENT DEPOSITION
DUE TO INCREASES IN PEAK STORM WATER RUNOFF? YES.
Pon
O �26 0 t%
U I Y E R ;
t'q. No.,RE 45596
NALC�
� Va, DCH
U MIT T AL NO. 3
I° OJ F.CT 1809400
T 0
gg VV PKK
C1.2
CONSTI RI.JCTION'
-3" '&k1 -2A ASPHALT TOP
DDURSE
29 2%
STONE
CON III' 1"R' tj f"I, I ON
ACCESS
'-6 WN, 21A ArYCRILGAT-E DA5E
PROAL
//--'A5PHALT PAVED
F'VASFMACK
12%
EXIS:]N,',G
P1,',jFMFNT I
T—POS1PV1-' DRAINA(3E
*WWST" EXTEEND FULL IF W �:'T[ 1 10 SEL)IN1,ENT
OF INGRESS AND, EGRESS TRAPP�N(; 5"FN[CE
OPERATION PLAL4
F� 0' DN,'%INAGE
TO
TRAIPPNG DBVICE
FII.- TER CLQTH--�
SECTION A—A
A n1irilluni water tap of I lilich 11111st be installed Nvith a iiiiihimin I inch ballcock
slititoff vahre "11pPb'*g a Wash hose NAth a fliallietel of 1.5 inclies for adequate
coll;,tailt pressure. Wa, -iied away froill the entrance to an
sh water rritist be cal
apl)ro,ved settli- area to renio-.Fe sedhiient. All sedhiietit,Ball bepre6retite(Ifi-oiii
entering storm drains, ditches or
PAVED WASH RACK
NO SCALE
(:D CONSTRUCTION ENTRANCE WITH WASH RACK
CONSTRUCTION OF A SILT FENCE
(WITHOUT WIRE SUPPORT.)
1. SET THE STAKES. 2. EXCAVATE A 4�'X 4" TRENCH
UPSLOPE ALONG THE LINE OF
STAKES.
6' MAX.
— --- ------- ---
FLOW
3. STAPLE FILTER MATERIAL
TO STAKES AND EXTEND
IT INTO THE TRENCH.
FLOW
4"
4. BACKFILL AND COMPACT
THE EXCAVAwED SOIL,
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
POINTS A SHOULD BE HIGHER THAN POINT B.
DRAINAGEWAY INSTALLATION
(FRONT ELEVATION)
Source: Adapted from Installation of Straw and Fabric Filter
Barriers for Sediment Control Sherwood and Wyant
SILT FENCE
TEMPORARY DIVERSION DIKE
Compacted Soil
18" min.
E Hary
4.5' min.
Source: Va. DSWC
DIVERSION DIKE
Plate 3.05-2 Source: Va, DSWC Plate 338-2
TREE PROTECTION FENCING
TEMPORARY SEDIMENT TRAP
i
1' VARIABLE* I
ORIGINAL
GROUND
ELEV.
*SEE PLATE 3.13-1
67 CU. YD./ACRE
1.01
VARIABLE
� , I
67 CU, YD./ACRE
(EXCAVATED) 41 MAX.
FILTER CLOTHORIGINAL
GROUND
\ ELEV.
COARSE AGGREGATE CLASS I RIPRAP
CROSS SECTION OF. OUTLET
CLASS I RIPRAP
LENGTH (IN FEET) =
6 X DRAINAGE AREA
(IN AC.)
DIVERSION
DIKE
COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5
OUTLET (PERSPECTIVE VIEW)
Plate 3.09-1 Source: Va. DSWC Plate 3.13-2
SEDIMENT TRAP DETAILS AND CALCULATIONS
SILT FENCE CULVERT INLET
PROTECTION
ENDWALL
-------------------------------------
T -J
TOE OF FILL L.
CULVERT
----------- --1 ------- I ---------
TOE OF FILL
SILT FENCE
* DISTANCE IS 6' MINIMUM IF FLOW
LIS TOWARD EMBANKMENT
FLOW
OPTIONAL STONE COMBINATION
FLOW
Ffi VDOT #3, #357 OR #5 COARSE AGGREGATE
TO REPLACE SILT FENCE IN - HORSESHOE - WHEN
HIGH VELOCITY OF FLOW IS EXPECTED
Source: Adapted from VDOT Standard
Sheets and Va. DSWC
CULVERT INLET PROTECTION
EM BAN KM ENT ELEV. = 623.76
DRY STORAGE ELEV. 622.76
0?'
0, U
'
403
WET STORAGE ELEV, 621A2 Qe
F
BOTTOM E LEV. = 6 19.7 2
STONE OUTLET AS SHOWN ON
SEDIMENT TRAP DETAIL
STONE OUTLET TO FUNCTION AS
I RIPRAP
Plate 3.08-1
PHASE I PROP. GRADE
EX. GRADE
I NV- 621.34 -V—
PROPOSED PIPES INSTALLED IN
ULTIMATE CONDITION
(INSTALL WITH PHASE I ESC)
2111 1) J I a
El
NN
P
CULVERT INLET PROTECTION.
IEL
INSTALL IN HORSESHOE SHAPE AS N I-)
SHOWN ON PLANS. C.
U
H Y I-: R..
11
Ic* Na. 5596
ST -1 Drainage Area (Ac) Required Storage Elevations] A - I AI
CONTOUR Iner. Incr. Cum. 2.42 324 C A P P R 57�- 0W, DCH
L W Area Vol. Vol. Vol. 162 Wet Storage 621.42 SUBMITTAL NO. 3
Elevation (Ft) (Ft) (SF) (CF) (CY) (C 162 Dry Storage 622.76
619.72 84 26 2147 0 0 0 Min. Top of 623.76 PROJECT 1809400
620.00 85 27 2272 619 23 23 embankment T Fi E 'Oil 0 R K 0 F
621.00 89 31 2734 2503 93 116 WET L i N E
622,00 93 35 3222 2978 110 226 DRY Embankment 50%
623.00 1 97 1 38 3734 34781 129 1 355 Slope (%)
624.00 11011 42 F427214003 148 503 Cls3
•
■
NN
P
CULVERT INLET PROTECTION.
IEL
INSTALL IN HORSESHOE SHAPE AS N I-)
SHOWN ON PLANS. C.
U
H Y I-: R..
11
Ic* Na. 5596
ST -1 Drainage Area (Ac) Required Storage Elevations] A - I AI
CONTOUR Iner. Incr. Cum. 2.42 324 C A P P R 57�- 0W, DCH
L W Area Vol. Vol. Vol. 162 Wet Storage 621.42 SUBMITTAL NO. 3
Elevation (Ft) (Ft) (SF) (CF) (CY) (C 162 Dry Storage 622.76
619.72 84 26 2147 0 0 0 Min. Top of 623.76 PROJECT 1809400
620.00 85 27 2272 619 23 23 embankment T Fi E 'Oil 0 R K 0 F
621.00 89 31 2734 2503 93 116 WET L i N E
622,00 93 35 3222 2978 110 226 DRY Embankment 50%
623.00 1 97 1 38 3734 34781 129 1 355 Slope (%)
624.00 11011 42 F427214003 148 503 Cls3
213 IS - L fl' I E+G
0
of
kk 11 IN
A
Lie.
O. 5596
m
APPRO'q ' DCH
SU BM ITT AL- NO, 3
P ROYEZCT 1809400
T H E W 0 R K 0 F
LINE + GRADE
it
0
of
kk 11 IN
A
Lie.
O. 5596
m
APPRO'q ' DCH
SU BM ITT AL- NO, 3
P ROYEZCT 1809400
T H E W 0 R K 0 F
LINE + GRADE
11
A 100 -YEAR FLOODPLAIN
WATER PROTECTION ORDINANCE BUFFER
EX. GRAVEL ROAD REGRADED FIELD
X. GRADE
PROP. GRADE
I 7`�
LOPE
__- ----- 1.5%S 77 .........
tDITCH CENTERLINE
SITE SECTION
III = 51 5 10
100 -YEAR FLOODPLAIN
WATER PROTECTION ORDINANCE BUFFER
EX. GRAVEL ROAD
G
5
2, _000- RRv
SITE SECTION
J-11 = 51 5 10
COMPACTED
BERM
- r, n u r. k_1 L_
EX. GRADE
REGRADED FIELD
DITCH CENTERLINE
01
FINISHED GRADE
6" VDOT 21A
NON -WOVEN GEOTEXTILE
FILTER FABRIC
r- COMPACTED SUBGRADE
GRAVEL ROAD SECTION
SHAPE TO BE
BEVELED
WITH MORTAR
DO NOT
BEVEL
INVERT
NOTES: 1. I'H" MAY BE REDUCED UNTIL "X" REACHES A MINIMUM OF 4" WHERE
ENDWALL WOULD PROTRUDE ABOVE SHOULDER LINE.
N NO CASE SHALL TOP OF ENDWALL PROJECT ABOVE FILL SLOPE,
DITCH SLOPE, OR SHOULDER.
2. THIS ITEM MAY BE PRECAST OR CAST IN PLACE.
3. ALL CAST IN PLACE CONCRETE TO BE CLASS A3. FOR PRECAST SEE
SHEET 101,02.
4. THIS STANDARD TO BE USED WITH STRAIGHT CROSSINGS AND ALL
SKEWS(O* TO 45').
SITE SECTION
III = 51 5 10
EW -MA
C
S. BEVEL EDGE IS REQUIRED ON THE HEADWALL AT THE INLET END OF THE
CULVERT (WHERE THE FLOW ENTERS THE CULVERT).
7. HEADWALL AT THE OUTLET END OF THE CULVERT MAY BE EITHER SQUARE
EDGE OR BEVEL EDGE,
S. ON SHALLOW FILLS, WHERE ENDWALLS ARE 1 1 OR LESS BELOW SHOULDER
LINE, THE TOP OF THE ENDWALL SHALL BE CONSTRUCTED PARALLEL TO THE
GRADE OF THE ROAD.
Gii. Y4" CHAMFER MAY BE PROVIDED ON ALL EDGES AT MANUFACTURER'S OPTION.
5. HEADEZ daEI
C
WITH FN V I[RbKwBiTk4NW
A ONLY I ASSOCIATION
TOP OF FILL
DIAMETER OF PIPE CULVERT
ENDWALL FOR ELLIPTICAL
12"
15"
18"
21" OR 24"27"
OR 2
A
0'-6"
0`8"
0`91"
REGRADED FIELD
a
23"x14,"
30"A9"
REGRADED RV PADS
T-3"
REGRADED GRAVEL ROAD
45"x29"
C
T-4"
1l-7"
1'-911
2--2"
0.-9.1
D
0,671
1'-3"
1r-6"
2'-0"
2'-6"
F
3:11.00%
01-81,
01-8,
0I_911
01-91l
H
2--3"
2`11"
3--2"
31-91,
4'-3-
L
4--0"
5`10"
6'-0"
81-O'll
TIE-IN
a
01-11/4'.
-1.00%
0'-2"
-1.00%
0'-31/4°
b
01-1-1
0-11/4-1
O --1V2"
gg
O' -2Y2
01-91,
1.43%
CUBIC YARDS OF CONCRETE
CONC. PIPE 1
2ne
0.492
1 0.697
1 1,319
2.067
_j
0.257
0.521
1 0.739
1 1.398
1 2.198
3'-9"
4'-0"
4'-2"
4--5"
4'-7"
12--0"
L
5'-5"'
7$-2"
81-61,
9'-2"
10'-2"
L,:, J!
12 -1"
121-111,
O' -3,Y4"
S
11-111.
2'-6"
2.-10.1
_j
3l-6"
31-91.
4--1"
41-5$'
.... . ....
.
a
W -21/2t'
0'-31/4"
0-4/2"
0'-4"
0'-4Y2"
E -:4N"
0'-5"
00-51/zl'
Jv
0'-2,"I
`q,
0'-2Y4"
0'-3"
0'-3Y2"
01-3Y4"
0'-4"
0'_41/2"
.. ...... ....
CUBIC YARDS OF CONCRETE
2,947
3.145
CONC.PIPE
0,502
0.855
1.236
1 1.500
T 1.811
2.101
2.512
2.801
CONTRACTOR TO RAISE RV UTILITY
CONNECTIONS TO PROPOSED GRADE
EX. GRADE
PROP. GRADE
SHAPE TO BE
BEVELED
WITH MORTAR
DO NOT
BEVEL
INVERT
NOTES: 1. I'H" MAY BE REDUCED UNTIL "X" REACHES A MINIMUM OF 4" WHERE
ENDWALL WOULD PROTRUDE ABOVE SHOULDER LINE.
N NO CASE SHALL TOP OF ENDWALL PROJECT ABOVE FILL SLOPE,
DITCH SLOPE, OR SHOULDER.
2. THIS ITEM MAY BE PRECAST OR CAST IN PLACE.
3. ALL CAST IN PLACE CONCRETE TO BE CLASS A3. FOR PRECAST SEE
SHEET 101,02.
4. THIS STANDARD TO BE USED WITH STRAIGHT CROSSINGS AND ALL
SKEWS(O* TO 45').
SITE SECTION
III = 51 5 10
EW -MA
C
S. BEVEL EDGE IS REQUIRED ON THE HEADWALL AT THE INLET END OF THE
CULVERT (WHERE THE FLOW ENTERS THE CULVERT).
7. HEADWALL AT THE OUTLET END OF THE CULVERT MAY BE EITHER SQUARE
EDGE OR BEVEL EDGE,
S. ON SHALLOW FILLS, WHERE ENDWALLS ARE 1 1 OR LESS BELOW SHOULDER
LINE, THE TOP OF THE ENDWALL SHALL BE CONSTRUCTED PARALLEL TO THE
GRADE OF THE ROAD.
Gii. Y4" CHAMFER MAY BE PROVIDED ON ALL EDGES AT MANUFACTURER'S OPTION.
5. HEADEZ daEI
C
WITH FN V I[RbKwBiTk4NW
A ONLY I ASSOCIATION
EW -1A
TOP OF FILL
DIAMETER OF PIPE CULVERT
ENDWALL FOR ELLIPTICAL
12"
15"
18"
21" OR 24"27"
OR 2
A
0'-6"
0`8"
0`91"
O, -ill'
a
23"x14,"
30"A9"
34"42"
T-3"
T-6"
45"x29"
C
T-4"
1l-7"
1'-911
2--2"
0.-9.1
D
0,671
1'-3"
1r-6"
2'-0"
2'-6"
F
8
01-81,
01-8,
0I_911
01-91l
H
2--3"
2`11"
3--2"
31-91,
4'-3-
L
4--0"
5`10"
6'-0"
81-O'll
101-oll
a
01-11/4'.
OI -1y4"
0'-2"
0"-21/2"
0'-31/4°
b
01-1-1
0-11/4-1
O --1V2"
O'-2"
O' -2Y2
01-91,
F
CUBIC YARDS OF CONCRETE
CONC. PIPE 1
0.241
0.492
1 0.697
1 1,319
2.067
C.M. PIPE 1
0.257
0.521
1 0.739
1 1.398
1 2.198
EW -1A
r �� I Iv^1 I'll
REFERENCE STANDARD ENDWALL FOR PIPIE CULVERTS
105 12" - 36" CIRCULAR AND 23" x 14" - 53" x 34" ELLIPTICAL PIPES
302 VIRGINIA DEPARTMENT OF TRANSPORTATION
XVDC3T
ROAD AND RIDGE
REVISION DATE SHEET 1 OF 1
103.01
S
NOTES:
1. IN NO CASE SHALL TOP OF ENDWALL PROJECT ABOVE FILL SLOPE, DITCH
SLOPE, DITCH SLOPE, OR SHOULDER.
2. THIS ITEM MAY BE PRECAST OR CAST IN PLACE.
3. ALL CAST IN PLACE CONCRETE TO BE CLASS A3. FOR PRECAST SEE SHEET
101.12.
4. THIS STANDARD TO BE USED WITH STRAIGHT CROSSINGS AND SKEW
ANGLES TO 15'.
5, HEADWALL TO BE BEVELED IN ALL AREAS EXCEPT WHERE A CONFLICT WITH
INVERT OR WINGWALLS OCCUR,
TOP OF FILL
FOR
ENDWALL FOR ELLIPTICAL
PIPE
PIPE
D
S
SIZE OF ELLIPTICAL PIPE CULVERT (SPAN x RISE)
L
CUBIC YARDS
CONCRETE
ONE DOUBLE
ENDWALL
OR 36"
a
23"x14,"
30"A9"
34"42"
38l"x24"
42"x27"
45"x29"
49"x32"
53"04"
I. -DI.
A
O. -Bl.
0.-9.1
7t-3"
0,671
0.179
1.-0.
W-114"
181,
2'-0"
8
T-2"
T -5l,
0.244
O'-2-1
0I -1V2--
11-101l
1
4'-0"
2'-9'l
C
11-81,
1l-11.1
0'-2"
2--4"
2'-5l'
20-7"
2'-8"
21-9"
3'-0"
D
1'-2"
T-7--
T-10..
2'-0"
2'-3"
2'-5"
2'-81.
21-101,
01-91,
F
0-8-
0'-81,
0-9"
0-9.,
27" OR 30"
0.-9.0
O*_91.
01-91,
4--9"
H
21-10.11
31-31,
3'-7"
3'-9"
4'-0"
4'-2"
4--5"
4'-7"
12--0"
L
5'-5"'
7$-2"
81-61,
9'-2"
10'-2"
101-111,
12 -1"
121-111,
O' -3,Y4"
S
11-111.
2'-6"
2.-10.1
31-2"
3l-6"
31-91.
4--1"
41-5$'
0'-3"
a
W -21/2t'
0'-31/4"
0-4/2"
0'-4"
0'-4Y2"
E -:4N"
0'-5"
00-51/zl'
b
0'-2,"I
0'-21/,"
0'-2Y4"
0'-3"
0'-3Y2"
01-3Y4"
0'-4"
0'_41/2"
CUBIC YARDS OF CONCRETE
2,947
3.145
CONC.PIPE
0,502
0.855
1.236
1 1.500
T 1.811
2.101
2.512
2.801
r �� I Iv^1 I'll
REFERENCE STANDARD ENDWALL FOR PIPIE CULVERTS
105 12" - 36" CIRCULAR AND 23" x 14" - 53" x 34" ELLIPTICAL PIPES
302 VIRGINIA DEPARTMENT OF TRANSPORTATION
XVDC3T
ROAD AND RIDGE
REVISION DATE SHEET 1 OF 1
103.01
S
NOTES:
1. IN NO CASE SHALL TOP OF ENDWALL PROJECT ABOVE FILL SLOPE, DITCH
SLOPE, DITCH SLOPE, OR SHOULDER.
2. THIS ITEM MAY BE PRECAST OR CAST IN PLACE.
3. ALL CAST IN PLACE CONCRETE TO BE CLASS A3. FOR PRECAST SEE SHEET
101.12.
4. THIS STANDARD TO BE USED WITH STRAIGHT CROSSINGS AND SKEW
ANGLES TO 15'.
5, HEADWALL TO BE BEVELED IN ALL AREAS EXCEPT WHERE A CONFLICT WITH
INVERT OR WINGWALLS OCCUR,
SHAPE TO
BE BEVELED
WITH MORTAR
DO NOT BEVEL INVERT
EW -6
RIM
6, BEVEL EDGE IS REQUIRED ON THE HEADWALL AT THE INLET END OF THE
CULVERT (WHERE THE FLOW ENTERS THE CULVERT).
7. HEADWALL AT THE OUTLET END OF THE CULVERT MAY BE EITHER SQUARE
EDGE OR BEVEL EDGE.
8. ON SHALLOW FILLS, WHERE ENDWALLS ARE 1' OR LESS BELOW
SHOULDER LINE, THE TOP OF THE ENDWALL SHALL BE CONSTRUCTED
PARALLEL TO THE GRADE OF THE ROAD.
9. 3'4" CHAMFER MAY BE PROVIDED ON ALL EDGES AT MANUFACTURER'S OPTION.
10. QUANTITIES GIVEN ARE FOR ONE ENDWALL. PLEASE REFER TO
STANDARD EW -1, SHEET lOtOl FOR ALL DIMENSIONS NOT GIVEN
IN TABLES.
TOP OF FILL
FOR
FOR
CONCRETE
PIPE
D
S
G
L
CUBIC YARDS
CONCRETE
ONE DOUBLE
ENDWALL
INCREASE FORt
EACH ADDITION,1A_
PIPE
a
b
12"
1f-1011
21-0"
51-10"
0.329
0.088
b
PIPE PROJECTION ABOVE GROUND LINE
15"
2--3"
2t -6l
7t-3"
0,671
0.179
TOP OF FILL
W-114"
181,
1 2'-8" 1
3--0"
W-8-11
0.941
0.244
O'-2-1
0I -1V2--
21 1- OR 24-1 _r3'-6"
1
4'-0"
11'-6-1
1.763
0.444
0'-2
0'-2"
27" OR 30"
4�-4�- T
-75--o-
1 4r7
2.730
0.663
0'-3
331, OR 36"
5'-2"
0.980
171-21
3.854
0.907
I 3
0'-3
()1 3" 1
SHAPE TO
BE BEVELED
WITH MORTAR
DO NOT BEVEL INVERT
EW -6
RIM
6, BEVEL EDGE IS REQUIRED ON THE HEADWALL AT THE INLET END OF THE
CULVERT (WHERE THE FLOW ENTERS THE CULVERT).
7. HEADWALL AT THE OUTLET END OF THE CULVERT MAY BE EITHER SQUARE
EDGE OR BEVEL EDGE.
8. ON SHALLOW FILLS, WHERE ENDWALLS ARE 1' OR LESS BELOW
SHOULDER LINE, THE TOP OF THE ENDWALL SHALL BE CONSTRUCTED
PARALLEL TO THE GRADE OF THE ROAD.
9. 3'4" CHAMFER MAY BE PROVIDED ON ALL EDGES AT MANUFACTURER'S OPTION.
10. QUANTITIES GIVEN ARE FOR ONE ENDWALL. PLEASE REFER TO
STANDARD EW -1, SHEET lOtOl FOR ALL DIMENSIONS NOT GIVEN
IN TABLES.
STANDARD ENDWALL FOR MULTIPLE PIPE CULVERTS
ROAD AND BRIDGE STANDARDS
105 12" - 36" CIRCULAR PIPES REVISION DATE SHEET 1 OF I
302 VIRGINIA D!)EPARTMENT OF TRANSPORTATION 101.11
PB -1 .. .. j NO PROJECTION OF PIPE ABOVE GROUND LINE
TOP OF FILL
FOR
CORRUGATED
METAL PIPE
_ GROUND LINE _
GROUND LINE
CUBIC YARDS
INCREASE FOR
L[
_:f ml:_11 --I,
EARTH
LIl k=14//r/
MIN_ 1/10 D1
X D x BEDDING
MATERIAL
M
D
S
G
L
CONCRETE
EACH ADDITIONAL
a
b
PIPE PROJECTION ABOVE GROUND LINE
MIN. 1.5 x 0 MIN. 1.5 x D
MIN, 1.5 x 0 MIN. 1.5 x D
MIN. 1-5 x D MIN. 1.5 x D
ONE DOUBLE
PIPE
TOP OF FILL
TOP OF FILL
GROUND
LINE
+ It -GROUND
LINE
+ X•GROUND
% LINE
ENDWALL
LLI_
ROCK 0 R
.........
12"
1'-7"
2'-0"
5'-7`
0.344
0,087
01-11
-0-7-T
0,_v
15"
1` llY2" 2'-6"
0.696
0.175
1 4r7
07--174'---
181,
2--4
t'
3--0" !
8- 4"
0.980
0.241
-
OI_1TP_
24"
31"
4'-0"
ll`f_
1.840
0.442
0'-21
01-21,
27" OR 30"
3'-10"
15'-0'l 13`10"
2.868
0.670
0'-3
W-21/2"
4.076
STANDARD ENDWALL FOR MULTIPLE PIPE CULVERTS
ROAD AND BRIDGE STANDARDS
105 12" - 36" CIRCULAR PIPES REVISION DATE SHEET 1 OF I
302 VIRGINIA D!)EPARTMENT OF TRANSPORTATION 101.11
PB -1 .. .. j NO PROJECTION OF PIPE ABOVE GROUND LINE
TOP OF FILL
TOP OF FILL
TOP OF FILL
_ GROUND LINE _
GROUND LINE
L[
_:f ml:_11 --I,
EARTH
LIl k=14//r/
MIN_ 1/10 D1
X D x BEDDING
MATERIAL
M
&4N",
RUCK OR
UNYIELDING
SOIL
MIN.
1/10 D� X -BED DING
._I x [
- MATERIAL
EARTH
F,
BEDDING
MATERIAL
MIN. 1/10 J
x] D X
%2" PER 1' OF H
NORMAL EARTH FOUNDATION
MIN. 8", MAX. 24"
ROCK FOUNDATION
FOUNDATION SOFT, YIELDING, OR
OTHERWISE UNSUITABLE MATERIAL
PIPE PROJECTION ABOVE GROUND LINE
MIN. 1.5 x 0 MIN. 1.5 x D
MIN, 1.5 x 0 MIN. 1.5 x D
MIN. 1-5 x D MIN. 1.5 x D
TOP OF FILL
TOP OF FILL
TOP OF FILL
GROUND
LINE
+ It -GROUND
LINE
+ X•GROUND
% LINE
III "I 11-1I I�l1I ILIIEARTH
4
LLI_
ROCK 0 R
.........
MIN 1/10 D� - __ I , -
, UNYIELDING
MIN. 1/10 D A BEDDING
L MATERIAL
NORMAL EARTH FOUNDATION
_= _11- SOIL
V2" PER
T' OF H x D X
MIN. 8", BEDDING
MAX. 21, MATERIAL
ROCK FOUNDATION
LI=t i I IF, 11 1 11 1=11 I IF, 1_111 1 111=;�,
MIN. 1/10
BEDDING EARTH
MATERIAL
FOUNDATION SOFT, YIELDING, OR
OTHERWISE UNSUITABLE MATERIAL
BEDDING MATERIAL IN ACCORDANCE WITH EMBANKMENT
SECT ON 302 OF THE ROAD AND BRIDGE NOTES:
SPECIFICATIONS. FOR GENERAL NOTES ON PIPE BEDDING,
CLASS I BACKFILL MAHERIIAL IN ACCORDANCE SEE INSTALLATION'OF PIPE CULVERTS
WITH SECTION 302 OF THIE ROAD AND BRIDGE AND STORM SEWERS GENERAL NOTES
SPECIFICATIONS. ON SHEET 107.00.
REGULAR BACKFILL MATERIAL IN ACCORDANCE
FOR PLASTIC PIPE CLASS I BACKFILL MATERIAL WITH SECTION 302 OF THE ROAD AND BRIDGE CRUSHED GLASS CONFORMING TO THE
rrrrr IN ACCORDANCE WITH SECTION 302 OF THE ROAD SPECIFICATIONS. SIZE REQUIREMENTS FOR CRUSHER RUN
AND BRIDGE SPECIFICATIONS. AGGREGATE SIZE 25 AND 26 MAY BE
USED IN PLACE OF CLASS I BACKFILL,
rrrrr FOR ALL OTHER PIPE REGULAR BACKFILL MATERIAL
IN ACCORDANCE WITH SECTION 302 OF THE ROAD
AND BRIDGE SPECIFICATIONS,
XVDOT
INSTALL, OF PIPE CULVERTS AND STORM SEWERS
SPECIFICATION
REFERENCE
ROAD AND BRIDGE STANDARDS
CIRC. PIPE BEDDING AND BACKFILL - METHOD "All
VIRGINIA DEPARTMENT OF TRANSPORTATION
302
303
SHEET 1 OF 4
REVISION DATE
07/12
107.01
O
VDOT EW -1 & 1A O VDOT EW -6 0
f�, 2018 UINF-GRADE LLC
w
U F1 Y E -y >
No., 3E 45596
APPRM_)JvP" "t"' DCV1
PROJECT 1809400
THE WORK 01F
L I N E + G R A D E
C201
Channel Report
Hydraflow Express Extension for Autodesk® AutOCADO Civil 300 by Autodesk, Inc
ROADSIDE DITCH - 10 YEAR
Triangular
Side Slopes (z:1)
= 3.00, 66.66
Total Depth (ft)
= 2.58
Invert Elev (ft)
= 621.34
Slope (%)
= 1.25
N -Value
= 0.035
Calculations
Compute by: Known Q
Known Q (cfs) = 7.43
Elev (ft) Section
6124.00
6;23.50
623.00
6122.50
6122.00
621.50
IE t
620.50
01
Highlighted
Depth (ft)
Q (Cfs)
Area (sgft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Wednesday, Nov 7 2018
= 0.38
= 7.430
= 5.03
= 1.48
= 26.54
= 0.31
= 26.47
= 0.41
Depth (ft)
2.66
3 20 40 60 80 100 120 140 160 180 200 220
Reach (ft)
ROADSIDE DITCH CROSS SECTION - 10 YEAR
ME
1.66
1.16
0.16
-0.34
-0.84
x'111 VFRT DATA TARI F '
CULVERT NAME
CULVERT DESCRIPTION
HYDROLOGY
TOTAL
FLOW
Qio
(cfs)
FLOW PER
BARREL
Q/N (cfs)
HEADWATER CALCULATIONS
ELEVATION
HEADWATER
CONTROL
VELOCITY
OUT
(fps)
LOW POINT
ELEVATION
FREEBOARD
(ft)
Material -Shape -Size
SLOPE LENGTH
�Q7o) (ft)
1.50%
INfLET CONTROL
OUTLET CONTROL
HWI /
D
HWi
FALL
ELHI
HWo
De He kr
H ELHO
NJ INVo INVin MATERIAL DIA (in)
Triple Culverts
3-15" RCP 1 3 1 620.97 621.37 1 RCP 15
0.60% 66.48
16.81
5.60
1.57
1.96
2.36
623.33
1.99
0.96 1-99 0.50
0-40 623.36
1 623.36
4.57
1 623.92
0.56
Twin Culverts
2-24" RCP 2 1 620.32 620.53 1 RCP 24
0-81% 33.46
1 25.70
12.85
1 0.94
1.89
2.16
622.48
1.44
1.29 1 1.44 0.50
0,271 622.03
1 622.48
1 6.54
1 624.67
1 2.19
0
625
620
CULVERT COMPUTATIONS
VDOT CL. I RIPRAP
SEE THIS SHEET
FOR DIMENSIONS
INV.IN=620.59' '
INV. OUT=620.32
0+50 1+00
TRIPLE CULVERT PROFILE
SCALE: 1"=20' H; 1"=2'V
PROPOSED TRIPLE CULVERT PROFILE
1" = 20' 20 40
1992 3.18
PIP.. ' O UTLE' T CONDITIONS
A A4
'IPE OUTLET TO FLAT
iREA WITH NO DEFINED
.HANNEL
L a
0 % - *
SECTION A -A FILTER CLOTH KEY IN C-9% RECOMMENDED FOR ENTIRE PERIMETER
3dc (MIN.)
'IPE OUTLET TO WELL
)EFINED CHANNEL
I
P I
u/
d,
SECTION A -A
FILTER CLOTH KEY IN B" -S"; RECOMMENDED FOR ENTIRE PERIMETER
NOTES; 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION
BASKET, OR CONCRETE.
2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED
USING PLATES 3.18-3 AND 3.18-4.
3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT
LESS THAN 6 INCHES.
Source: Va. DSW Plate 3.18-1
NOTE: COMPUTATIONS PER VESCH STANDARD 3.18
5
OUTLET PROTECTION DETAIL AND MINIMUM DIMENSIONS
625 CURVE NUMBER TABULATIONS
DRAINAGE AREA: DA. A
AREAS (Ac)
SOIL Total Area Impervious (CN 98) Woods (CN 77)
Open Space (CN 80)
D 0.82
0.20 0.26
0.37
DRAINAGE AREA:
DA. B
15.59%
0.050
AREAS (Ac)
SHALLOW
SOIL
1.50%
0.050
Total Area
Impervious (CN 98) Woods (CN 77)
Open Space (CN 80)
D 1.67
0.17 0.06
1.45
DRAINAGE AREA:
DA. C
(%)
620
AREAS (Ac)
15.0
SOIL
(MIN)
SHEET 100
Total Area
Impervious (CN 98) Woods (CN 77)
Open Space (CN 80)
D 2.23 0.54 0.07 1.62
DRAINAGE AREA: DA. D
AREAS (Ac)
SOIL Total Area Impervious (CN 98) Woods (CN 77) Open Space (CN 80)
1+50 1+75 D 1.77 0.78 0.12 0.87
3 CURVE NUMBER TABULATIONS
TIME OF CONCENTRATION TABULATIONS
DRAINAGE AREA: DA. A
FLOW TYPE
LENGTH SLOPE MANNING'S n FLOW AREA WETTED VELOCITY TIME
(FT) (%) (S F) PERIMETER (FT) (FPS) (MIN)
SHEET 100 3.82% 0.170 7.8
SHALLOW 217 13.65% 0.050 0.6
SHAILLOW 150 2.30% 0.050 1.0
TOTAL Tc = 9.5
DRAINAGE AREA: DA. B
FLOW TYPE LENGTH SLOPE MANNING'S n FLOW AREA WETTED VELOCITY TIME
(FT) (%) IS F) PERIMETER (FT) (FPS) (MIN)
SHEET
75
5.58%
0.400
10.6
SHALLOW
182
15.59%
0.050
0.5
SHALLOW
190
1.50%
0.050
1.6
CHANNEL
190
1.10%
0.035 2.99
17.95 1.34 2.4
D50
(FT)
(%)
CONIDITION
TOTAL Tc =
15.0
DRAINAGE AREA:
DA. C
PIPE
APRON
APRON WIDTH
LENGTH
SLOPE
FLOW AREA
WETTED
VELOCITY
TIME
FLOW TYPE
VELOCITY
MANNING'S n
UPSTREAM
DOWNSTREAM
VDOT
D50
(FT)
(%)
CONIDITION
IS F)
PERIMETER (FT)
(FPS)
(MIN)
SHEET 100
4.27%
0.400
THICKNESS
FEET
14.8
SHALLOW 510
6.52%
0.050
2.1
SHALLOW 160
1.78%
0.050
INCHES
CFS
FPS
1.2
FEET
FEET
FEET
TOTAL Tc =
18.1
3 x;15
DRAINAGE AREA:
DA. D
10
13-25
17-25
I
1.1
LENGTH
SLOPE
1
FLOW AREA
WETTED
VELOCITY
TIME
FLOW TYPE
1 23
MIANNING'S n
1 1-1
2.5
(FT)
(%)
(SF)
PERIMETER (FT)
(FPS)
(MIN)
SHEET 100
1.91°!0
0.150
9.3
SHALLOW 400
0.95%
0.050
4.2
TOTAL Tc =
13.6
TIME OF CONCENTRATION TABULATIONS
,OUTLET PROTECTION - MINIMUM DIMENSIONS
'_,
PIPE
APRON
APRON WIDTH
APRON WIDTH
STR_ #
TAILWVATER
SPAN
DISCHARGE
VELOCITY
LENGTH
UPSTREAM
DOWNSTREAM
VDOT
D50
RIP RAP
CONIDITION
(Do)
(Q o)
(V�°)
(La)
(3 Do)
(W)
GLASS
THICKNESS
FEET
INCHES
CFS
FPS
FEET
FEET
FEET
FEET
Triple Culverts
2
3 x;15
( 16.81
1 4.57
10
13-25
17-25
I
1.1
2.5
Twin Culverts
1
2 xi24
I 25.70
1 6.54
1 10
1 13
1 23
I
1 1-1
2.5
'_,