Loading...
HomeMy WebLinkAboutSUB200500186 Bond Road Plan and Comps. 2001-09-01 Internal Use Oni"l, jc,C4 0 k Date Deceived: Fee Paid: / � Received by: `^r� 'k • Intake: Forward to Management Analyst BOND INSPECTION REQUEST (Inspection must be requested by the Owner/Developer of the property) DATE: September 1, 2010 PROJECT NAME: The Village At Chestnut Grove Subdivision • (Include phase,section,and other relevant information to clearly identify the project) TAX MAP/PARCEL: 01900-00-00-00-012A0 OWNER: The Village At Chestnut Grove, LLC This is to request that an inspection be scheduled to determine if the following performance bonds can be reduced or released(check below all that apply). Requests are required once the initial bond estimate is prepared. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,VA 22902,Attention:Management Analyst-Phone 434-296-5832;Fax 434-972-4126. Inspections will be scheduled within thirty days of receipt of this request and the required fee. 0 Water Protection Performance Bond(bonds will not be reduced below 20%of the original amount—this amount is held until acceptance of the bonded improvements) O Erosion&Sediment Control component of water protection bond(bond inspection fee covered under annual permit and inspection fee) ❑ Stormwater Management&Water Quality component of water protection bond- SUBMIT$60 BOND INSPECTION FEE with request—make check payable to County of Albemarle ® Subdivision/Road Performance Bond(bonds will not be reduced below 20%of the original amount—this amount is held until acceptance of the bonded improvements) SUBMIT$250 BOND INSPECTION FEE PER BOND with request-make check payable to County of Albemarle © Roads&Drainage—Refer to Community Development's"Private Road Acceptance Procedure"and"Public Road Acceptance Procedure"to request reductions/release ❑ Water&Sewer O Other—list below(i.e.4 andscapin_ pedestrian paths) ❑ Site Development Performance Bond-Incomplete Site Work&Landscape Maintenance SUBMIT$60 BOND INSPECTION FEE PER BOND with request-make check payable to County of Albemarle If landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete and the project is ready to start the one-year landscape maintenance period. Bonds for landscape maintenance are 33.3%of the total landscaping value are aintained at that amount for theone-year maintenance period. I�4h tl ate/ < 434-962-1758 Si I+'r'Si'-, Owner/Developer / /' ' Phone Barry G. Dofflemyer Managing Member Print Name Title 1/1/03;Rev.3/27104;11/8/04;2/!/06;2/8/08;8/8/08;10/1/09 GLOEC NGINEERIN SINC. lA4 � 07 VR e KI@NU4 Q, 8 Dale Avenue,, Suiteuite k • CHARLOTTESVILLE, VA 22903 DATEJOB NO. (434) 971-1591 3/� 4 c::, "Q I S � • FAX (434) 293-7612 ATTENTION TO RE: O lir`.1..,A4 .... e-4jG c.;AAA._ S U1SM %-VT-A-4 ..-IN\C__ t,A, E2P---- \AL-1-ere-A-7— iNT. C-40'---CA1.7 I C, i•A* SITS a)A'` L lirstsb WE ARE SENDING YOU .Attached ❑ Under separate cover via the following items: > ❑ Shop drawings ❑ Prints ❑ Plans LI Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION Z. eRio VP - 1...44-1...) 4, — U►3.05- I V(p 2- PA%T \ .0. T1c THESE ARE TRANSMITTED as checked below: XFor approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints > ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS A L-L.A t-4 1 4\00,,,,) r >tAv Nvrs r s (...._ELT- t• W_ AAA°J v1/4.)- l k..-AR.... ; I .+- AN' t> Ate® ` F A--s- ocrs.- -A .)-v "5 Q FP>-1 r c_1— `T p zo-t-k V---j \ n --C- ‘A-..\ Q• -`-----1----k-\--A . , - , , 7. .,,4WD A; 32CS COPY TO iai r ma _0 w 1_ C8iii4 !' - Tom. SIGNED: te(0 P��,Y- �J 3� � zP.. If enclosua res are n t s noted,kindly notify us at once. 1� L