Loading...
HomeMy WebLinkAboutSUB200500186 Plan - Approved Road Plan and Comps. 2006-06-27 (4)NOTES: 1. THE ABBREVIATION V.D.O.T. MADE HEREAFTER REFERS TO THE VIRGINIA e DEPARTMENT OF TRANSPORTATION. THE TERM COUNTY REFERS TO ALBEMARLE, VIRGINIA. _10VE -THE VI._LLAG__E___._.AT­- _CHESff`NUT G7n 2. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT FOR SAID CONSTRUCTION SHALL BE OBTAINED FROM THEPLAN AND� PRn- Fil F VIRGINIA DEPARTMENT OF TRANSPORTATION (HEREAFTER ABBREVIATEDROAD AS�BUILT 1 VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE: - REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCURS r THE REQUIREMENTS OF THE PERMIT SHALL GOVERN.TA A PROPOSED ROADS WITHIN THE 'L 19, PARU'""ELS 3. CONSTRUCTION INSPECTION OF LL DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR WUST NOTIFY THE DEPARTMENT OF ENGINEERING (296-5861.) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 4. ALL PAVING AND DRAINAGE RELATED MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 5. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND MUST BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CON- STRUCTION, 6, UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY. IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS FOR APPROVAL. 7. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. MAXIMUM ALLOWABLE FILL OR CUT SLOPE IS 2:1. WHERE REASONABLY OBTAINABLE LESSER SLOPES OF 4:1 OR BETTER ARE TO BE -ACHIEVED. 8. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT -OF --WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY VDOT (ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO BOUNDARY LINE OR A NATURAL WATERCOURSE.) 9. GUARDRAIL LOCATIONS WHERE SHOWN HEREON ARE APPROXIMATE. EXACT LOCATION AND APPROPRIATE END TREATMENTS WILL BE FIELD DETERMINED. AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONSNOT SHOWN WHEN, IN THE OPINION OF VDOT; THE DIRECTOR OF ENGINEERING OR HIS DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED IT SHALL BE INSTALLED FOUR FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SIX FEET, 10. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEV,A1 ENTRANCES SHALL CONFORM TO VDOT CG -9 (A,B, OR C). 11. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWriY ENTRANCES_ SHALL CONFORM TO VDOT STANDARD PE -1. 12. PAVED, .RIP-RAE',UR S`�T�Bt1�1=zAmTt�i�`�v1A7rLTNTED DITCH MAY BE REQUIRED""TO "5 SIZE .A DRAINAGE CHANNEL WHEN, IN THE OPINION OF VDOT, THE DIRECTOR OF ENGINEERING OR HIS DESIGNEE, IT IS DEEMED NECESSARY. 13. A MINIMUM -.CLEAR ZONE OF TEN (10) FEET FROM THE EDGE OF PAVE- MENT SHALL' BE MAINTAINED ON ALL RESIDENTIAL SUBDIVISION STREETS. ADDITIONAL CLEAR ZONE MAY BE. REQUIRED DEPENDING ON THE CATEGORY OF ROAD DESIGN. 14, COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTIION DETAIL, SHALL BE STRICTLY ADHERED TO. EXCEPTIONS WILL NOT BE ALLOWED. 15. ALL REQUIRED SIGNS (STOP, STREET NAME, SPEED LIMIT SIGN, ETC..) ARE, TO BE FURNISHED AND INSTALLED BY THE DEVELOPER PRIOR TO A(CCEP'i;,--'rvCE. SIGNS AND .THEIR INSTALLATION! SHALL CONFORM TO "ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL" AND THE -} VIRGINIA MANUAL FOR UNIFORM TEAEEIC CONTROL DEVICES THE LOCATIONS QF ALL SIGNS�ARE SHOWN ON THE PLANS. THE DEVELOPER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE SIGNS UNTIL THE ROADS HAVE BEEN ACCEPTED INTO THE STATE SECONDARY ROAD SYSTEM, THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE TO BE DETERMINED BY VDOT PRIOR TO ACCEPTANCE. THE SPEED LIMIT IS TO BE POSTED 5MPH BELOW THE DESIGN SPEED. CLEAN-OUT BIOFILTER P WCA� (TYP) HT CROSS SECTION .ALTERNATE. DI -7 3:1 SLOPE N,T.S, LOCATION TO (MAX) REPLACE CLEAN-OUT I SOD TURF SEE NOTE 1TOP DI -7 [ =601.0 EC -1 FROM TOP' BANK DETENTION =602.0 BAS I N 600.0 *�, 36.0-15 R.C.P. ......i.L..... DISCHARGE !;, . TO STREAIM 2 1 /2'-3' ® 2.4% SLOPE 50% SAND 1.0' MIN !.5 _ n . •_J 20% LEAF MULCH �-15.0' MIN.- INV. IN =595.0 30% TOP SOIL 6" PERFORATED P.V.C. PIPE UNDERDRAIN GRAVEL SCHEDULE 40 OR EQUIVALENT (AASHTO M43, 1/2--l") APPROVED BY ENGINEER @1% WRAPPED IN FILTER FABRIC SLOPE (MIN.) TO D.I. OR STORM DRAIN. PROVIDE ACROSS ENTIRE WIDTH CSD• 20 FT. O.C. 12, 12A, 12B & .18A ALBENIARLE COUNTY., VIRGINIA June 4, 2010 NOTES, _ 1. PLANTING AS FOLLOWS: 9 RED MAPLES 1 1/2" O CALIPER 12.0' -ON CENTER AS SHOWN. O 8 RED OSIER •DOGWOOD 2.0' HEIGHT 24.0' -ON CENTER AS SHOWN. 8 BERBERIS KOREANA (BARBERRY) 4.0' HEIGHT 24.0' -ON CENTER AS SHOWN. 2. PROVIDE 1.0' PONDING DEPTH,,, TO THE CREST OF AN OVERFLOW STRUCTURE. OVERFLOW STRUCTURE MAY BE D.I. IN SWALE (INDICATED) OR STONE WEIR DISCHARGING TO STABLE CHANNEL OR STORM DRAIN. 3. BIOFILTERS MUST NOT BE INSTALLED UNTIL THE SITE IS DETERMINED TO BE ADEQUATELY STABILIZED BY THE EROSION 'CONTROL AND WATER RESOURCES INSPECTORS. VICINITY MAP SCALE: 1"=1000' 4. THE CONTRACTOR SHALL CONTACT THE WATER RESOURCES INSPECTOR 24 HOURS PRIOR TO BACKFILLING THE BIOFILTER AND REQUEST AN INSPECTION AND APPROVAL OF THE: UNDERDRAIN INSTALLATION AND THE SOIL MIX. 5. THE BIOFILTER SOIL MIX WILL BE "LUCK BIO -FILTER MIX" OR A TESTED EQUIVALENT APPROVED BY THE COUNTY ENGINEER. 6. BIOFILTERS MUST NOT BE INSTALLED UNTIL THE SITE IS DETERMINED TO BE ADEQUATELY STABILIZED BY THE EROSION CONTROL AND WATER RESOURCES INSPECTORS. 7. CONTRACTOR SHALL CONTACT THE WATER RESOURCES INSPECTOR 24- HOURS 4HOURS PRIOR TO BACKFILLING THE BIOFILTER AND REQUEST AN INSPECTION AND APPROVAL OF THE UNDER -DRAIN INSTALLATION AND THE SOIL MIX. OPTIONAL DISCHARGE FROM SAND DETENTION BASIN LAYER �- y y W y W y y W y y W CLEANOUT y W LENGTH=97.0' y _4 y (ONE OOR y EACH W 1 % 1 % 12'� 5.5'w UNDERDRAIN) ° W=22.0' DI -7A W -o o ®o ® 0 TOP OF GRATE 5.5' 24' 6' W y INVERT IS -� 8"-10" 41 y y ,GRASS 71,y 12'y y BERM=6.,0' ABOVE BOTTOM SOD IV 4, OF PONDING y W BASIN TO DISCHARGE GRAVEL 44.32 C CURTAIN BERM --8 -15 RCP d DRAIN BIOFILTER OVERFLOW BIORETENITION AREA INV. OUT=4 .PLAN VIEW N.T.S. B.M.P. DETAILS FOR STATE ROAD N.T.S. FILL WITH GUARD RAIL SHOULDER=5.0' GUARD RAIL FILL on 16. ROAD PLAN APPROVAL IS SUBJECT TO FINAL SUBDIVISION VALIDATION. SHOULD 7HE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 17. UPON COMPLETION OF THE ROADWAY CONSTRUCTION, STREET NAME SIGNS SHALL BE INSTALLED B'' THE DEVELOPER AT ALL STREET INTERSECTIONS. SIGNS AND NE INSTALLATION THEREOF SHALL CONFORM TO "ALBEMARLE CO)NTY STREET NAME SIGN REQUIREMENTS". THE DEVEILOPER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE SIGNS UNTIL THE ROADS HAV[ BEEN ACCEPTED INTO THE STATE SECONDARY ROAD SYSTEM. j 18. TRAFFIC CONTROL OR OTHER PEGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE pEVELOPER WHEN, IN THE OPINION OF THE DIRECTOR OF ENGINEERING OR:HIS DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PRCIDE SAFE AND CONVENIENT ACCESS. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION. 19. SITE IS NOT WITHIN THE WATIF'SHED OF THE SOUTH FORK RIVANNA RESERVOIR, UPSTREAM OF THI PROPOSED LICKINGHOLE CREEK IMPOUNDMENT. 20. THIS SITE: IS NOT LOCATED VATHIN THE LIMITS OF THE 100 YEAR FLOOD PLAIN AS DESIGNATED BY THE NATIONAL FLOOD INSURANCE PROGRAM. 21. THE LOCATION OF EXISTING UTILITIES ACROSS OR ALONG THE LINE OF THE PROPOSED WORK ARE NCF NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONL' APPROXIMATELY CORRECT. THE CONTRACTOR SHALL ON HIS (WN INITIATIVE LOCATE ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. 22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING "MISS GPOO f 4AQ.$ 00` ; UTILITY (1-800-552-7001), APPIRGYEr) 23. CERTIFICATION THAT 95% COMPACTION IS OBTAINED SHALL BE IFv th, @ A I b M 0Unt,v PROVIDED FOR ALL FILL AREA UNDER ROADWAY LINES AND E��,� r,1-lopM gpaftmni APPURTENANCES, THIS CER71CATION SHALL BE SIGNED BY Ajv0C zoo _ PROFESSIONAL GEOLOGIST. THE CERTIFICATION SHALL STATE THE 7 g:'Zo03 o gR� EXACT AREA THAT THE CERTIFICATION APPLIES TO 24, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO V.D.O.T. STANDARD PE -1. 25. CONTRACTOR SHALL FIELD VERIFY LENGTH OF ALL STORM DRAINAGE PIPE. CROSS SLOPES SHALL BE MEINTAINED AS SHOWN. 26. SPEED LIMIT POSTING TO BE DETERMINED BY VDOT PRIOR TO ROAD ACCEPTANCE. 27. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS 'AND STANDARDS OF VDOT. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMFLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 192; 28. PAVED OR RIP -RAP LINED DIFC`-' MAY BE REQUIRED TO STABILIZE A DRAINAGE CHANNEL., WHEN IN THE OPIN�ON OF VDOT, THE DIRECTOR OF ENGINEERING OR HIS DESIGNEE, IT IS DEEMED NFCESSARY. 29. BENCHMARK=2 NAILS IN BASE. -OF TRIPLE OAK ELEVATIOIN=712.0 DATyW ASSUMED 30. STANDARD CD -1:-O0 CD -2 UNDERDRAIN IS REQUIRED AT ALL CUT AND FILL TRANSITIONS ,AKb GRADE SAG POINTS. 31. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT INSPECTIONS AND ARE TO BE ACCEPTED INTO VDOT'S MAINTENANCE PROGRAM AND OWNERSHIP. THE VIDDO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT AND/OR COUNTY INSPECTOR PRESENT, IN ADDI'ION, IF HIGH-DENSITY POLYETHYLENE (HDPE) PIPE OR PIPE SYSTEM IS INSTALLED, THE CONTRACTOR AND A REPRESENTATIVE FROM THE PIPE MANUFACTURER SHOULD HOLD A PRE -CONSTRUCTION MEETING FOR INSTALLATION TRAINING. THE PIPE MANUFACTURER SHOULD SPEND A MINIMUM OF TWO HOURS ON THE JOBSITE DURING THE INITIAL INSTALLATION, 32. ALL UNDERDRAINS AND CROSS DRAINS SHALL BE INSTALLED AS DIRECTED DURING FIELD INSPECTIONS THROUGHOUT THE CONSTRUCTION PERIOD. 33. DRIVEWAY'S ON LOTS 5, 6, 7,;8, 9, 10, & 11 WILL BE CONSTRUCTED THROUGH THE STREAM BUFFERS AT THE SAME TIME AS THE PUBLIC ROADS. 34. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE AND/OR CONVERT TO PERMANENT STCRv1WATER MANAGEMENT FACILITIES (WHERE APPLICABLE) ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, REVISIONS JANUARY 18, 2006 MARCH 7, 2006 APRIL 28, 2006 MAY 9, 2006 JUNE 4 2010 iiLTL DATE NOVEMBER 9, 2005 50.0' VA (11 E -S - IS CC- "PCA �jI SURFACE -'; SM -9.5A VAP-IE5 �-- 1/4": 1' 1/4 '7 VAr2 (65 / -8-"#21/21A SUB -BASE MIN. CE3R=10 AGGR. BASE WITH COVERED PRIME COAT TYPICAL ROAD CROSS SECTION - SIENNA LANE N.T.S. SEE fl,5Pt-+At-T --4 5 -rat -r6 'TH-tcK N/ G-55 ME-s01Z.EMC NTS PA-rc-D F852t)A-2Y 9, 2008- 5&PAIZAT>r A-TTACH.MGNT' 1 ": 1 ' is 3 i KURT M. GLOECKPIER �,�49/400 COXAL �' JOB NUMBER 05-015-00 DWG. NAME 050150ORD.DWG JF'!tt 9 OF �7 6004 NE S 2J' 664 �TgiN ROq� yo -v = c �0 SITE 70oo o z� y�(( NOTES, _ 1. PLANTING AS FOLLOWS: 9 RED MAPLES 1 1/2" O CALIPER 12.0' -ON CENTER AS SHOWN. O 8 RED OSIER •DOGWOOD 2.0' HEIGHT 24.0' -ON CENTER AS SHOWN. 8 BERBERIS KOREANA (BARBERRY) 4.0' HEIGHT 24.0' -ON CENTER AS SHOWN. 2. PROVIDE 1.0' PONDING DEPTH,,, TO THE CREST OF AN OVERFLOW STRUCTURE. OVERFLOW STRUCTURE MAY BE D.I. IN SWALE (INDICATED) OR STONE WEIR DISCHARGING TO STABLE CHANNEL OR STORM DRAIN. 3. BIOFILTERS MUST NOT BE INSTALLED UNTIL THE SITE IS DETERMINED TO BE ADEQUATELY STABILIZED BY THE EROSION 'CONTROL AND WATER RESOURCES INSPECTORS. VICINITY MAP SCALE: 1"=1000' 4. THE CONTRACTOR SHALL CONTACT THE WATER RESOURCES INSPECTOR 24 HOURS PRIOR TO BACKFILLING THE BIOFILTER AND REQUEST AN INSPECTION AND APPROVAL OF THE: UNDERDRAIN INSTALLATION AND THE SOIL MIX. 5. THE BIOFILTER SOIL MIX WILL BE "LUCK BIO -FILTER MIX" OR A TESTED EQUIVALENT APPROVED BY THE COUNTY ENGINEER. 6. BIOFILTERS MUST NOT BE INSTALLED UNTIL THE SITE IS DETERMINED TO BE ADEQUATELY STABILIZED BY THE EROSION CONTROL AND WATER RESOURCES INSPECTORS. 7. CONTRACTOR SHALL CONTACT THE WATER RESOURCES INSPECTOR 24- HOURS 4HOURS PRIOR TO BACKFILLING THE BIOFILTER AND REQUEST AN INSPECTION AND APPROVAL OF THE UNDER -DRAIN INSTALLATION AND THE SOIL MIX. OPTIONAL DISCHARGE FROM SAND DETENTION BASIN LAYER �- y y W y W y y W y y W CLEANOUT y W LENGTH=97.0' y _4 y (ONE OOR y EACH W 1 % 1 % 12'� 5.5'w UNDERDRAIN) ° W=22.0' DI -7A W -o o ®o ® 0 TOP OF GRATE 5.5' 24' 6' W y INVERT IS -� 8"-10" 41 y y ,GRASS 71,y 12'y y BERM=6.,0' ABOVE BOTTOM SOD IV 4, OF PONDING y W BASIN TO DISCHARGE GRAVEL 44.32 C CURTAIN BERM --8 -15 RCP d DRAIN BIOFILTER OVERFLOW BIORETENITION AREA INV. OUT=4 .PLAN VIEW N.T.S. B.M.P. DETAILS FOR STATE ROAD N.T.S. FILL WITH GUARD RAIL SHOULDER=5.0' GUARD RAIL FILL on 16. ROAD PLAN APPROVAL IS SUBJECT TO FINAL SUBDIVISION VALIDATION. SHOULD 7HE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 17. UPON COMPLETION OF THE ROADWAY CONSTRUCTION, STREET NAME SIGNS SHALL BE INSTALLED B'' THE DEVELOPER AT ALL STREET INTERSECTIONS. SIGNS AND NE INSTALLATION THEREOF SHALL CONFORM TO "ALBEMARLE CO)NTY STREET NAME SIGN REQUIREMENTS". THE DEVEILOPER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE SIGNS UNTIL THE ROADS HAV[ BEEN ACCEPTED INTO THE STATE SECONDARY ROAD SYSTEM. j 18. TRAFFIC CONTROL OR OTHER PEGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE pEVELOPER WHEN, IN THE OPINION OF THE DIRECTOR OF ENGINEERING OR:HIS DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PRCIDE SAFE AND CONVENIENT ACCESS. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION. 19. SITE IS NOT WITHIN THE WATIF'SHED OF THE SOUTH FORK RIVANNA RESERVOIR, UPSTREAM OF THI PROPOSED LICKINGHOLE CREEK IMPOUNDMENT. 20. THIS SITE: IS NOT LOCATED VATHIN THE LIMITS OF THE 100 YEAR FLOOD PLAIN AS DESIGNATED BY THE NATIONAL FLOOD INSURANCE PROGRAM. 21. THE LOCATION OF EXISTING UTILITIES ACROSS OR ALONG THE LINE OF THE PROPOSED WORK ARE NCF NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONL' APPROXIMATELY CORRECT. THE CONTRACTOR SHALL ON HIS (WN INITIATIVE LOCATE ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. 22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING "MISS GPOO f 4AQ.$ 00` ; UTILITY (1-800-552-7001), APPIRGYEr) 23. CERTIFICATION THAT 95% COMPACTION IS OBTAINED SHALL BE IFv th, @ A I b M 0Unt,v PROVIDED FOR ALL FILL AREA UNDER ROADWAY LINES AND E��,� r,1-lopM gpaftmni APPURTENANCES, THIS CER71CATION SHALL BE SIGNED BY Ajv0C zoo _ PROFESSIONAL GEOLOGIST. THE CERTIFICATION SHALL STATE THE 7 g:'Zo03 o gR� EXACT AREA THAT THE CERTIFICATION APPLIES TO 24, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO V.D.O.T. STANDARD PE -1. 25. CONTRACTOR SHALL FIELD VERIFY LENGTH OF ALL STORM DRAINAGE PIPE. CROSS SLOPES SHALL BE MEINTAINED AS SHOWN. 26. SPEED LIMIT POSTING TO BE DETERMINED BY VDOT PRIOR TO ROAD ACCEPTANCE. 27. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS 'AND STANDARDS OF VDOT. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMFLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 192; 28. PAVED OR RIP -RAP LINED DIFC`-' MAY BE REQUIRED TO STABILIZE A DRAINAGE CHANNEL., WHEN IN THE OPIN�ON OF VDOT, THE DIRECTOR OF ENGINEERING OR HIS DESIGNEE, IT IS DEEMED NFCESSARY. 29. BENCHMARK=2 NAILS IN BASE. -OF TRIPLE OAK ELEVATIOIN=712.0 DATyW ASSUMED 30. STANDARD CD -1:-O0 CD -2 UNDERDRAIN IS REQUIRED AT ALL CUT AND FILL TRANSITIONS ,AKb GRADE SAG POINTS. 31. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT INSPECTIONS AND ARE TO BE ACCEPTED INTO VDOT'S MAINTENANCE PROGRAM AND OWNERSHIP. THE VIDDO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT AND/OR COUNTY INSPECTOR PRESENT, IN ADDI'ION, IF HIGH-DENSITY POLYETHYLENE (HDPE) PIPE OR PIPE SYSTEM IS INSTALLED, THE CONTRACTOR AND A REPRESENTATIVE FROM THE PIPE MANUFACTURER SHOULD HOLD A PRE -CONSTRUCTION MEETING FOR INSTALLATION TRAINING. THE PIPE MANUFACTURER SHOULD SPEND A MINIMUM OF TWO HOURS ON THE JOBSITE DURING THE INITIAL INSTALLATION, 32. ALL UNDERDRAINS AND CROSS DRAINS SHALL BE INSTALLED AS DIRECTED DURING FIELD INSPECTIONS THROUGHOUT THE CONSTRUCTION PERIOD. 33. DRIVEWAY'S ON LOTS 5, 6, 7,;8, 9, 10, & 11 WILL BE CONSTRUCTED THROUGH THE STREAM BUFFERS AT THE SAME TIME AS THE PUBLIC ROADS. 34. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE AND/OR CONVERT TO PERMANENT STCRv1WATER MANAGEMENT FACILITIES (WHERE APPLICABLE) ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, REVISIONS JANUARY 18, 2006 MARCH 7, 2006 APRIL 28, 2006 MAY 9, 2006 JUNE 4 2010 iiLTL DATE NOVEMBER 9, 2005 50.0' VA (11 E -S - IS CC- "PCA �jI SURFACE -'; SM -9.5A VAP-IE5 �-- 1/4": 1' 1/4 '7 VAr2 (65 / -8-"#21/21A SUB -BASE MIN. CE3R=10 AGGR. BASE WITH COVERED PRIME COAT TYPICAL ROAD CROSS SECTION - SIENNA LANE N.T.S. SEE fl,5Pt-+At-T --4 5 -rat -r6 'TH-tcK N/ G-55 ME-s01Z.EMC NTS PA-rc-D F852t)A-2Y 9, 2008- 5&PAIZAT>r A-TTACH.MGNT' 1 ": 1 ' is 3 i KURT M. GLOECKPIER �,�49/400 COXAL �' JOB NUMBER 05-015-00 DWG. NAME 050150ORD.DWG JF'!tt 9 OF �7 DATE NOVEMBER 9, 2005 SCALE 1 "=50' KURT M. GLOECKNER 5549 'SIONAL 1� JOB NUMBER 05-015-00 DWG. NAM E 0501500RD.DWO .+ �-� SHEET 2 oF �.l(p s.�% -+r E • t t JOB NUMBER 05-015-00 DWG. NAM E 0501500RD.DWO .+ �-� SHEET 2 oF �.l(p s.�% DATE NOVEMBER 9, 2005 5. L 1 lt=50' OP �-F4- KURT M. W008 P &. vd L 5649 05-015-00 W . TAME 0501500RD.0WG ,o SHEET 062 6�I31 68I:. 679 678 677 676 DATUM ELEV DAT! 5 I 68� 681 679 679 678 677 676 DA TUM AEV 67'5.00 10+00 10+10 10+20 10+30 -1G -4e- o + (o4", 2-0 STORM PIPE. 1-2 PROFILE HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=2' 660 659 658 657 656 655 654 653 DATUM ELEV 652.00 r- rri r` FINISHED GRADE FINISHED i M GRADE o r. , o � Z • Q GRADE cn w ? r .s o z STA. 1C+40 -I� STA. 1C+40— +40ES-1 ES-1 673.30 INV. OU =6:66.5 N CO m 00 00 c� cc> cQ ca 68� 681 679 679 678 677 676 DA TUM AEV 67'5.00 10+00 10+10 10+20 10+30 -1G -4e- o + (o4", 2-0 STORM PIPE. 1-2 PROFILE HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=2' 660 659 658 657 656 655 654 653 DATUM ELEV 652.00 r- rri r` 660 650 658 657 656 655 654 653 DATUM ELEV 652.00 10+00 10+10 10+20 10+30 {0 +39•'gi STORM PIPE 3-4 PROFILE HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=2' 632 631 63 629 628 627 626 625 624 623 622 621 DATUM ELEV FINISHED GRADE FINISHED i i GRADE EXISTING i' • Q GRADE cn w ? r .s o z STA. 1C+40 -I� ES -1 (053.60 INV. OU =654.5 N CO cD cD � c0 660 650 658 657 656 655 654 653 DATUM ELEV 652.00 10+00 10+10 10+20 10+30 {0 +39•'gi STORM PIPE 3-4 PROFILE HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=2' 632 631 63 629 628 627 626 625 624 623 622 621 DATUM ELEV 10+00 10+10 10+20 10+30 10+40 STORM PIPE 5--6 PROFILE HORIZONTAL SCALE: 1 "=10' VERTICAL SCALE: 1"=2' 632 631 630 629 628 627 626 625 624 623 622 621 DATUM ELEV 620.00 10+40 i e +-5%- 1 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 11.4-00 11+10 11+20 11+30 11+40 11+50 11+60 11+70 11+80 11+90 12+00 12+10 12+20 12 -+-;?4- TORM PIPE 7-8 PROFILE HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=2' REVISIONS JANUARY 18, 2006 MARCH 7, 2006 APRIL 28, 2006 MAY 9, 2006 JUNE 4, 2010 , AS-BUILTS N Qy L. i1 RIVER . 019933 NFA.L ®.ATE NOVEMBER 9, 2005 SCALE 1 "-50' KURT M. GLOECOER .g; 5649 F FINISHED i i GRADE EXISTING i' • Q GRADE r o z -I� Q STA. 10+56 E8-1 6 0.10 INIV. OUT= rn ao �t L o o 00 t") ti r o o N Qi o0 r i d 6 t- i � � N 10+00 10+10 10+20 10+30 10+40 STORM PIPE 5--6 PROFILE HORIZONTAL SCALE: 1 "=10' VERTICAL SCALE: 1"=2' 632 631 630 629 628 627 626 625 624 623 622 621 DATUM ELEV 620.00 10+40 i e +-5%- 1 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 11.4-00 11+10 11+20 11+30 11+40 11+50 11+60 11+70 11+80 11+90 12+00 12+10 12+20 12 -+-;?4- TORM PIPE 7-8 PROFILE HORIZONTAL SCALE: 1"=10' VERTICAL SCALE: 1"=2' REVISIONS JANUARY 18, 2006 MARCH 7, 2006 APRIL 28, 2006 MAY 9, 2006 JUNE 4, 2010 , AS-BUILTS N Qy L. i1 RIVER . 019933 NFA.L ®.ATE NOVEMBER 9, 2005 SCALE 1 "-50' KURT M. GLOECOER .g; 5649 F JOB NUMBER 05-015-00 DWG. NAME 050150ORD.DWG AN SHEET 4 OF i i i' • r -I� i JOB NUMBER 05-015-00 DWG. NAME 050150ORD.DWG AN SHEET 4 OF