Loading...
HomeMy WebLinkAboutSUB201800145 Bond Estimates 2019-03-01Subdivision (Plat) Name: Plat of Two Lot Subdivision Tax Map 44-22 Plan # SUB2018-00145 TM P(s): 44-22 Date Estimate Completed: 03/01/19 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item # Item No. Unit Unit Cost Cost installed Road Name -Barracks Farm Road -7o L STA. NA -sketch of improvements will be submitted road length ± 100.0 ft 1 aggregate base, VDOT 21-A 8.0 in d 100.0 ft L 2.0 ft W 9.3 ton $35.00 $326.67 2 asphalt base (IM-19.0 interim course) 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $100.00 $0.00 3 1.5" asphalt surface course, SM-9.5A, sheet C9 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $120.00 $0.00 4 curb CG-6 0.0 ft $15.00 $0.00 5 stone dust, unit price ($) guesstimate 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $35.00 $0.00 6 7 sidewalk, concrete (6) 0.0 ft $17.00 $0.00 8 ramp CG-12 0 each $350.00 $0.00 9 street name sign 0 each $200.00 $0.00 10 traffic control sign 0 each $200.00 $0.00 11 traffic barrier -temp. ROAD/bridge closure (Estimate) 0 each $500.00 $0.00 12 Street Landscape 0 Each 0 each $150.00 $0.00 13 guardrail 0 ES @ $3700 0.0 ft $17.00 $0.00 14 drop inlet or grate 0 each $3,500.00 $0.00 15 standard manhole frame top (not inlet) 0 each $500.00 $0.00 16 manhole structure (per ft. rise) 0 ft $450.00 $0.00 17 matting, EC-2 or 3 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 18 matting, EC-2 or 3 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 19 pipe, rcp, cmp (15 to 48") 15.0 in d 0 ES-1,2 0 EC-1 0.0 ft $35.00 $0.00 20 pipe, rcp, cmp (15 to 48") 18.0 in d 0 ES-1,2 0 EC-1 0.0 ft $40.00 $0.00 21 pipe, rcp, cmp (15 to 48") 24.0 in d 0 ES-1,2 0 EC-1 0.0 ft $50.00 $0.00 22 clear and grub (75'± x 1430') 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 23 cut grading 0.0 cy $4.00 $0.00 24 25 fill grading 0.0 cy $9.00 $0.00 26 27 as -built drawings (1 k + price per 0.1 mi.) 0.0 ft L 0 mi. 0 Isum $2,000.00 $0.00 28 survey and layout (price per 0.1 mi.) 100.0 ft L 0.01894 mi. 1 Isum $2,000.00 $3,000.00 29 mobilization 1 Isum $500.00 $500.00 30 materials testing 100.0 ft L 0.2 inc of 500' 0 each $200.00 $0.00 31 compaction testing 100.0 ft L 0.2 inc of 500' 1 each $200.00 $240.00 32 CBR tests (1 every 0.1 mi. per road) 100.0 ft L 0.2 inc of 500' 0 each $200.00 $0.00 33 stone depth inspections 100.0 ft L 0.2 inc of 500' 1 each $200.00 $240.00 34 pavement inspections 100.0 ft L 0.2 inc of 500' 0 each $200.00 $0.00 35 pipe and drainage video inspections 0 ft $2.00 $0.00 36 VDOT surety (1 lane) 100.0 ft L 0.01894 mi. 0 Lanes $2,000.00 $0.00 37 VDOT maintenance fee (1 In rd, 1 yr) 100.0 ft L 0.01894 mi. 0 Lanes $150.00 $0.00 38 VDOT admin. Cost recovery fee(1 lane) 0.0 ft L 0 mi. 0 Lanes $100.00 $0.00 cost sum $4,306.67 prej-rrs3mt $0.00 contingency $430.67 JEA 030119 SUB201800145 Barracks Farm subdivision_RP_030119.xlsx Total $4,740 MCommunity Development\Engineering Division\1-Staff Folders\anderson\040918_bonds\estimates\SUB201800145 Barracks Farm subdivision_RP_030119.xlsx 3/1/2019