Loading...
HomeMy WebLinkAboutARB201900007 Staff Report 2019-03-06ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2019-07: Pantops Corner Final Site Development Plan Review Type Final Site Development Plan Parcel Identification 078000000005A0, 078000000005130, 078000000005G1 Location On the north side of Richmond Road (Rt. 250 east) across from People Place Zoned Highway Commercial (HC)/Entrance Corridor (EC) Owner/Applicant Pantops Corner LC/Shimp Engineering (Justin Shimp) Magisterial District Rivanna Proposal To construct a 5-story hotel with associated site improvements. Context The site of the proposed development is surrounded by a mix of retail, office and residential development. Visibility The hotel will be visible from both the Rt. 250 and Rt. 20 Entrance Corridors. ARB Meeting Date March 4, 2019 Staff Contact Margaret Maliszewski PROJECT HISTORY DATE APPLICATION/REVIEW TYPE RESULT July 2, 2018 Initial Site Plan ARB recommended that 4 conditions be resolved prior to Initial Plan approval. July 17, 2018 Work Session Work session held to discuss visibility and orientation of the hotel relative to the Rt. 20 EC. Comments were provided. Aug. 6, 2018 Work Session Work session held to discuss issues identified at July 17 meeting. ARB recommended approval of the initial site plan, with conditions to be resolved with the final plan. REF GUIDELINE AUGUST 2018 ISSUE AUGUST 2018 CURRENT ISSUE CURRENT RECOMMENDATION RECOMMENDATION Structure design 1 The goal of the regulation of the design of Two options are illustrated for the building The stepped gables of Stepped gables are no longer proposed. Revise the white picket development within the designated Entrance design. In both designs, the building is 5 Option 2 are not hand rail for greater Corridors is to insure that new development stories tall with a single bay, three-story appropriate for the EC. The design has been simplified at the consistency with the within the corridors reflects the traditional wing on the west elevation, that is provided corner towers; the towers are now treated immediate setting. architecture of the area. Therefore, it is the to meet the stepback requirement. (For each Revise the corner towers with a single material for their full height. Include a detail(s) in the purpose of ARB review and of these story that begins above 40' in height, or for of Option 1 so that they This change helps project more of a site plan for all hand rails. Guidelines, that proposed development within each story above the third story, whichever is appear more fully as "tower" image. the designated Entrance Corridors reflect less, the minimum stepback shall be 15'.) towers or eliminate them. Coordinate the drawings elements of design characteristic of the Both options have: 1) an off -center, 4-bay, All but the top floor of the entrance bay is with submitted EIFS significant historical landmarks, buildings, brick -framed, EIFS-faced entrance element Revise the EIFS material now faced with brick. The brick facing material samples. and structures of the Charlottesville and that projects forward from the main building and detailing of the steps up from 2 to 3 stories at the bays Albemarle area, and to promote orderly and wall; 2) north and south elevations with entrance bay to better flanking the entrance, and up to 4 stories in Clarify the discrepancy attractive development within these corridors. brick -faced walls at the three lower stories reflect the importance of the entrance bay. A coping has been added between the illustrated Applicants should note that replication of and EIFS walls above; 3) side elevations the entrance function. at the 4' story. The entrance bay frame is brick and the submitted historic structures is neither required nor with brick -faced walls at the lower 2 stories also faced in brick. brick sample. Clarify how desired. and EIFS walls above; and 4) a fenced patio on the north side and a porte cochere with an Note on the elevation drawings that the vents at A note on the elevations sheet states that the illustrated brick will have an appropriate 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience angled roof supported by stone -faced the windows will be all vents will match the color of the appearance for the EC. these sites as ensembles of buildings, land, columns on the south side. colored to match the adjacent wall surface. and vegetation. In order to accomplish the adjacent wall surface. Include the wood product integration of buildings, land, and vegetation The primary difference in the designs is that A flat roof is now proposed, so no shingles in the materials list on the characteristic of these sites, the Guidelines Option 1 has a hipped roof with rectangular Refine and simplify the will be used. architectural drawings require attention to four primary factors: tower -like elements at the building corners, hotel design to establish and provide a sample. compatibility with significant historic sites in extending up from the third story, and Option greater coordination of The three-story end wing is now faced with the area; the character of the Entrance 2 transforms the towers into oversized architectural elements brick at all three stories. No windows have Corridor; site development and layout; and stepped gables at the ends of the building. In throughout. been added since the 8/6/2018 work landscaping. both cases the roof has a deep overhang on the north and south elevations. Clarify the proposed session, but a soldier course, a wall recess, and a second story cap at the piers have 3 New structures and substantial additions to existing structures should respect the shingle color and note it been added. A canopy over the first story traditions of the architecture of historically The various elements of the design and the consistently throughout windows, a hand rail, and two retaining significant buildings in the Charlottesville and materials and colors contribute to a "busy" the drawings. walls provide some relief at the base. The Albemarle area. Photographs of historic and uncoordinated appearance. The stepped illustrated hand rail resembles a white buildings in the area, as well as drawings of gable doesn't have a strong local precedent, The three-story end wing picket fence, which appears inconsistent architectural features, which provide appears overscaled, and further contributes to lacks detail and scale, and with the setting. important examples of this tradition are the lack of coordination. needs additional contained in Appendix A. The brick proposed for the base of the fenestration or patterning. Extending the brick to the The proposed brick is a thin brick with a Tabs II support system. A sample has been 4 The examples contained in Appendix A should be used as a guide for building design: building is a tie to a traditional building third floor of the end provided. The brick includes 67% Grey the standard of compatibility with the area's material in the county, but overall the design wing may resolve the Blend Velour and 33% Manganese historic structures is not intended to impose a does not have a strong connection to the issue. Ironspot velour. The size of the majority of rigid design solution for new development. historic architecture of the area. the thin brick is 11 5/8" x 3 5/8" x 5/8" Replication of the design of the important The center framed area thick. 20% of the Manganese is proposed historic sites in the area is neither intended The architectural elevations note gray has no proportion, needs to be 1" thick (projecting forward from the nor desired. The Guideline's standard of dimensional shingles for the roof, the infill. A solution may be other brick). The brick sample does not compatibility can be met through building renderings show brown shingles. continuing the brick up appear to be represented accurately in the scale, materials, and forms which may be one story above the rest color renderings. The illustrated brick embodied in architecture which is The addition of a three-story wing on the east of the brick facing, inside appears to include more color variation contemporary as well as traditional. The end of the building would balance the design the arch, and topping the than the submitted sample. The illustration Guidelines allow individuality in design to and make it more consistent with some brick with coping. shows significant patterning and texture, accommodate varying tastes as well as special historic precedents. and a very prominent color variation. The functional requirements. The entrance bay of the hotel is emphasized illustrated brick color, and the variation in colors, is not typical in Albemarle's 9 Building forms and features, including roofs, windows, doors, materials, colors and textures by a brick surround, increased height, and a traditional architecture, but might be should be compatible with the forms and projection out from the main wall of the acceptable from the Rt. 250 EC given the features of the significant historic buildings in building. The material (EIFS) and apparent 570' distance from that corridor. (Distance the area, exemplified by (but not limited to) lack of texture and detail in the wall surface from the Rt. 20 corridor ranges from 130' the buildings described in Appendix A [of the are not consistent with the importance of the to 320'. The 3-story wing is visible from design guidelines]. The standard of entrance function. Rt. 20.) compatibility can be met through scale, materials, and forms which may be embodied Note that architectural elevations for Samples of three shades of Dryvit (2 off - in architecture which is contemporary as well Building A were not submitted with the white, 1 dark tan) were submitted for as traditional. The replication of important Initial Plan; however, staff recently met with review. Two shades of EIFS are identified historic sites in Albemarle County is not the the applicant to view preliminary designs. on the elevation drawings; the color names objective of these guidelines. Based on the materials and details do not match the samples. presented, staff recommended that the applicant provide the elevations for a work The wood product proposed for the session level review with the ARB. These canopies is not identified on the drawings. drawings will be forwarded to the ARB as soon as they are made available. 5 It is also an important objective of the The proposed hotel will appear considerably None at this time. The August 2018 assessment of these Coordinate all drawings Guidelines to establish a pattern of compatible larger (at approx. 210' x 65') and taller (at guidelines is still accurate. The hotel will with submitted material architectural characteristics throughout the approx. 74' tall) than the buildings on the appear much larger than all nearby samples/colors. Entrance Corridor in order to achieve unity adjacent properties (Goodwill, Malloy Ford, buildings with the exception of the VNB and coherence. Building designs should Flow Auto) and will appear considerably building. Some of the nearby parcels with demonstrate sensitivity to other nearby different in form, style and detail. The existing one-story buildings may redevelop structures within the Entrance Corridor. building height is more consistent with the in the near future, so consistency with Where a designated corridor is substantially Virginia National Bank building across Rt. those existing buildings may be less developed, these Guidelines require striking a 250 to the south. Future buildings in the critical. The hotel design does not share careful balance between harmonizing new Pantops Corner development could be any forms, features or scale with the Wawa development with the existing character of the designed to be compatible with the hotel. convenience store and fuel pump canopy corridor and achieving compatibility with the Future buildings will also serve to limit that are under review on the portion of the significant historic sites in the area. visibility of the hotel. property located just south of the hotel site adjacent to Rt. 250. 10 Buildings should relate to their site and the surrounding context of buildings. The colors of the submitted material 12 Architecture proposed within the Entrance The proposed design incorporates a number Refine and simplify the Corridor should use forms, shapes, scale, and of different forms, details, materials and hotel design to establish samples are compatible with each other. materials to create a cohesive whole. colors. A greater level of coordination among greater coordination of The combination of colors and the revised these elements would establish more of a architectural elements distribution of brick help establish a more cohesive whole. throughout. unified appearance. However, there are discrepancies between the drawings and the submitted samples. 11 The overall design of buildings should have Details and treatments employed to help None. Details and treatments employed to help None. human scale. Scale should be integral to the establish human scale include: material and establish human scale include: material and building and site design. color changes, brick banding, and color changes, brick banding, projections. ro'ectionS. 13 Any appearance of "blankness" resulting from In both hotel designs, blankness in the end None. The end elevations have minimal windows, None. building design should be relieved using elevations is relieved by a single, central bay but the elevations appear balanced and design detail or vegetation, or both. of windows and changes in materials and material, color and height changes break colors. It is anticipated that most of the up the mass. eastern elevation will not be visible from the EC. 14 Arcades, colonnades, or other architectural The nearest building to the hotel that is None. The site plan includes a single building, so None. connecting devices should be used to unify proposed at this time is 500' away. No connecting devices are not needed. groups of buildings within a development. connecting devices are provided. 15 Trademark buildings and related features The proposed design is a Holiday Inn See recommendations The proposed design is a Holiday Inn See recommendations should be modified to meet the requirements Express & Suites standard with some above. Express & Suites standard with revisions above. of the Guidelines. revisions made in an attempt to address local made to address ARB comments. context and requirements. 16 Window glass in the Entrance Corridors should Window glass is not addressed in this Include the standard The window glass note was added to the None. not be highly tinted or highly reflective. submittal. window glass note on the elevation drawings. Window glass in the Entrance Corridors drawings and provide should meet the following criteria: Visible specs for review. light transmittance (VLT) shall not drop below 4001o. Visible light reflectance (VLR) shall not exceed 3001o. Specifications on the proposed window glass should be submitted with the applicationfiorfinal review. Accessory structures and equipment 17 Accessory structures and equipment should be Dumpsters are proposed at the northeast Add a dumpster detail to A dumpster detail is included on sheet None. integrated into the overall plan of corner of the site. Evergreen shrubs are the site plan. Coordinate C13. It shows a stone finish, which is development and shall, to the extent possible, proposed around the dumpster screen. Given dumpster screening expected to be compatible with the be compatible with the building designs used the location, if the dumpster screen material materials with the building materials. Some evergreen trees on the site. is coordinated with the building material, the appearance is expected to be appropriate. building materials. and shrubs are provided around the dumpsters. 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, Confirm that mechanical after appropriate siting, these features will still Mechanical equipment for the hotel is equipment for the hotel Notes on the architectural elevations state have a negative visual impact on the Entrance expected to be located below the roof. Vents will be screened by the that the building parapet will screen Corridor street, screening should be provided to at individual rooms appear to be colored to roof. Note this on the rooftop mechanical units and that all vents eliminate visibility. a. Loading areas, b. coordinate with the adjacent wall material. architectural drawings. will match the color of the adjacent wall Service areas, c. Refuse areas, d. Storage surface. areas, e. Mechanical equipment, No information has been provided regarding Note on the elevation f. Above -ground utilities, and g. Chain link equipment for Building A. drawings that vents at the Building A is no longer shown on the plan. fence, barbed wire, razor wire, and similar individual rooms will be security fencing devices. colored to coordinate with the adjacent wall 19 Screening devices should be compatible with the design of the buildings and surrounding material. natural vegetation and may consist of: a. Walls, b. Plantings, and c. Fencing. Show on the plan where Building A mechanical equipment is located. 21 The following note should be added to the site The note does not appear on the drawings. Add the standard The mechanical equipment note has been None. plan and the architectural plan: "Visibility of mechanical equipment added to the architectural drawings and the all mechanical equipment from the Entrance note to the site and site plan. Corridor shall be eliminated." architectural drawings. Lighting No lighting is proposed at this time. The roof Include details in the A note on the plan indicates that the Correct the labels on the of the port cochere is angled up and away lighting plan to confirm canopy fixtures will be inset in the canopy lighting plan for the wall from the building. This may allow the under- that the under -canopy to achieve the full cutoff condition. fixtures: change the two canopy light fixtures to produce glare and/or light fixtures are full "D" labels to "B". emit light above the horizontal plane. cutoff fixtures that do not Cut sheets for the wall lights have been produce glare. included in the plan. The wall lights are the "B" fixtures in the luminaire schedule; Update the lighting plan however, two of the wall fixtures are to include information on all proposed building lights. labeled "D" on the plan. General Guidelines 22 Light should be contained on the site and not Spillover does not exceed .5 fc. None. spill over onto adjacent properties or streets; 23 Light should be shielded, recessed or flush- Proposed pole -mounted and wall -mounted None. mounted to eliminate glare. All fixtures with fixtures are full cutoff. The structure of the lamps emitting 3000 lumens or more must be canopy will provide the cutoff function for full cutoff fixtures. the soffit fixtures. 24 Light levels exceeding 30 footcandles are not The maximum light level is 12.3 fc. None. appropriate for display lots in the Entrance Corridors. Lower light levels will apply to most other uses in the Entrance Corridors. 25 Light should have the appearance of white All fixtures are proposed with lamps with a None. light with a warm soft glow; however, a 4000K color temperature. consistent appearance throughout a site or development is required. Consequently, if existing lamps that emit non -white light are to remain, new lamps may be required to match them. 26 Dark brown, dark bronze, or black are Fixture finish has not been provided. Provide on the lighting appropriate colors for free-standing pole plan information showing mounted light fixtures in the Entrance that the light fixtures will Corridors. have a consistent dark brown, dark bronze or black finish. 27 The height and scale of freestanding, pole- A note on the plan states that fixture None. mounted light fixtures should be compatible height, including the base, will not exceed with the height and scale of the buildings and 20 fc. the sites they are illuminating, and with the use of the site. Typically, the height of freestanding pole -mounted light fixtures in the Entrance Corridors should not exceed 20 feet, including the base. Fixtures that exceed 20 feet in height will typically require additional screening to achieve an appropriate appearance from the Entrance Corridor. 28 In determining the appropriateness of lighting Coordination will be enhanced if adjacent None. fixtures for the Entrance Corridors, the parcels that will be developing in the near individual context of the site will be taken future use light fixtures consistent with into consideration on a case by case basis. those approved for this project. 29 The following note should be included on the The note is included on the lighting plan. None. lighting plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 30-31 Guidelines for the Use of Decorative - - No decorative landscape lighting is None. Landscape Lighting ro osed. Landscaping 7 The requirements of the Guidelines regarding Rt. 250 Clearly show all utilities The landscaping on the Rt. 250 frontage is Continue the row of Rt. landscaping are intended to reflect the Large shade trees, 3'/2" caliper at planting, and easements on the now shown on the Wawa site plan. 20 EC trees along the landscaping characteristic of many of the are shown along the Rt. 250 frontage, spaced utility and landscape north retaining wall. area's significant historic sites which is 35' on center with a gap in the planting plans. Provide required Grading and tree preservation conflicts characterized by large shade trees and lawns. where the entrance/exit is proposed. planting free of utilities along Rt. 20 have been resolved. Reposition the water and Landscaping should promote visual order Ornamental trees are interspersed. and easements. sanitary lines to reserve within the Entrance Corridor and help to Large shade trees (tulip poplars) have been planting area for future integrate buildings into the existing An existing water line is shown A separate diagram of the provided along the Rt. 20 side of the EC street trees on Rt. 20, environment of the corridor. approximately 15' from the trunks of the large trees. Site plans previously reviewed frontage planting that details the utility lines northern parking area, approximately 35' on center. The row of trees extends from south of Pantops Corner Way. 8 Continuity within the Entrance Corridor should be obtained by planting different types for this site showed two underground fiber and easements in varying Pantops Corner Way to the point where the of plant materials that share similar optic lines, a Centel easement, an overhead colors would help clarify northern retaining wall begins. characteristics. Such common elements allow power line, a power easement and a Service the feasibility of the for more flexibility in the design of structures Authority easement in addition to the water proposed planting. Proposed block for the retaining walls is because common landscape features will help line. Eagle Bay Diamond Pro segmental block; to harmonize the appearance of development Eliminate the conflicts the proposed color is "James River". This as seen from the street upon which the Rt. 20 between proposed block has been approved for other Corridor is centered. Substantial right-of-way (up to approximately 60' in depth) exists between grading and wooded area to remain along Rt. 20. developments in the ECs. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: the property line and the edge of pavement The extension of water and sanitary sewer a. Large shade trees should be planted parallel along Rt. 20. Some of the right-of-way is Provide large shade trees, lines from points just south of the Rt. to the Entrance Corridor Street. Such trees occupied by existing trees that are shown to 3'/2" caliper at planting, 20/Pantops Corner Way intersection will should be at least 3%2 inches caliper (measured remain. This wooded area ranges from 10' to 35' on center, along the severely limit the planting of EC trees on 6 inches above the ground) and should be of a 30' deep. Grading is shown into the edges of Rt. 20 side of the site. parcel 78-5E in the future. plant species common to the area. Such trees the wooded area. Intersperse ornamentals should be located at least every 35 feet on among the shade trees. center. The ground rises approximately 20' from Rt. b. Flowering ornamental trees of a species 20 to the base of a proposed retaining wall common to the area should be interspersed that runs along a parking lot on the north side among the trees required by the preceding of the hotel. The wall varies in height from paragraph. The ornamental trees need not 6' to 12'. A row of evergreen shrubs is alternate one for one with the large shade trees. shown along the parking lot side of the They may be planted among the large shade portion of the wall closest to Rt. 20. Only trees in a less regular spacing pattern. one perimeter parking lot tree is provided c. In situations where appropriate, a three or along 585 linear feet of retaining in this area. four board fence or low stone wall, typical of There is no landscape easement on the the area, should align the frontage of the wooded area in the right-of-way. Entrance Corridor street. Consequently, the standard EC frontage d. An area of sufficient width to accommodate planting should be provided. the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor South of the entrance on Rt. 20, there is a street, and exclusive of road right-of-way and much shorter length of frontage; it is without utility easements. trees. One tree is shown off -site in the right- of-way at the intersection of Pantops Corner Way with Rt. 20. 33 Landscaping along interior roads: Large shade trees, 2'/2" caliper at planting, None at this time. Trees are shown along the interior road, at Revise the planting size a. Large trees should be planted parallel to all are spaced 40' apart along the interior road. approximately 40' spacing. However, they of interior road trees to 2 interior roads. Such trees should be at least are specified at 1 1/2" caliper, which is 1/2" caliper. 2'/z inches caliper (measured six inches above smaller than the requirement. the ground) and should be of a plant species common to the area. Such trees should be located at least every 40 feet on center. 34 Landscaping along interior pedestrian ways: Trees are shown at 40' on center along the Provide medium street Most of the proposed sidewalks are Consider adding trees a. Medium trees should be planted parallel to sidewalks that are located adjacent to interior trees, spaced 25' on adjacent to interior roads or travelways that along the sidewalks at the all interior pedestrian ways. Such trees should roads which also require trees at 40' center, parallel to the have a 40' treespacing requirement. The north, south and east be at least 2'/2 inches caliper (measured six spacing). A sidewalk surrounds the hotel, but sidewalks at the hotel and sidewalks around the hotel are the elevations of the hotel. inches above the ground) and should be of a the 25' tree spacing is only met at its Building A. exception. Some trees are provided at the species common to the area. Such trees should southwest corner. Sidewalks are provided west end of the hotel, but none are be located at least every 25 feet on center. north of Building A, but the 25' spacing provided along the sidewalks at the north, requirement is not met. south and east elevations. 35 Landscaping of parking areas: The cover sheet notes a total of 177 parking Coordinate the number of The cover sheet and landscape plan both Specify the perimeter a. Large trees should align the perimeter of spaces proposed. The landscape plan notes proposed parking spaces note 122 parking spaces; the plan shows parking lot tree planting parking areas, located 40 feet on center. Trees 176 parking spaces. Sufficient interior noted on the cover sheet the same. size as 2 1/2" caliper. should be planted in the interior of parking parking lot trees are provided. with the number noted on areas at the rate of one tree for every 10 the landscape plan and Perimeter parking lot trees are specified at parking spaces provided and should be evenly the actual number 11/2" caliper, which is less than the 2 1/2" distributed throughout the interior of the provided. requirement. parking area. b. Trees required by the preceding paragraph should measure 2'/z inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: Medium shade trees are proposed along the Add trees west of the Two trees are proposed along Pantops None. a. Trees or other vegetation should be planted Rt. 250 side of the hotel, spaced 40', 50' and hotel building to soften Corner Way, west of the hotel. Shrubs are along the front of long buildings as necessary 60' apart. Two trees are provided on the the appearance of the shown at the base of the retaining walls in to soften the appearance of exterior walls. The north side of the hotel — one in each of two west elevation. this area. spacing, size, and type of such trees or planting islands at the corners of the vegetation should be determined by the building. The side elevations have limited length, height, and blankness of such walls. windows. Additional trees located just west b. Shrubs should be used to integrate the site, of the hotel building would be appropriate. buildings, and other structures; dumpsters, accessory buildings and structures; "drive thru" windows; service areas; and signs. Shrubs should measure at least 24" in height. 37 Plantspecies: a. Plantspecies required should Plantspecies have not yet been provided. None at this time. The Franklin tree is not included in the Replace the Franklin tree be as approved by the Staff based upon but various lists. with a tree from the not limited to the Generic Landscape Plan recommended plant lists. Recommended Species List and Native Plants Three evergreen shrub species are for Virginia Landscapes (Appendix D). proposed. Adding a fourth shrub species Add a fourth shrub type would provide greater diversity and to the plant list. Limit the support the health of the landscape. number of proposed plants for any one species to 25% of the total proposed for that plant type tree, shrub). 38 Plant health: The following note should be The note appears on the plan. Note 4 on the Eliminate Note 4 on the Note 4 has been deleted. The standard None. added to the landscape plan: "All site plantings landscape plan indicates that landscaping landscape plan. Provide plant health note is on the plan. Rt. 250 of trees and shrubs shall be allowed to reach, shall be replaced when necessary. This note additional clarification planting is now shown with the Wawa site and be maintained at, mature height; the is too open-ended and should be deleted. regarding the timing of plan. topping of trees is prohibited. Shrubs and Note 5 indicates that planting will occur after EC frontage planting. trees shall be pruned minimally and only to building and road construction. Additional support the overall health of the plant." information should be provided to clarify the timing of the EC frontage planting. Site Development and layout 6. Site development should be sensitive to the Proffers associated with ZMA-2013-02 Terrace retaining walls 6' The northern retaining wall has a Add trees at the base of existing natural landscape and should require a private road from Rt. 20 to Rt. 250 in height and taller and maximum height of 14' and it is not the northern retaining contribute to the creation of an organized through the property; the road is shown on plant the terraces. terraced. This wall is expected to have wall to mitigate heights development plan. This may be accomplished, the plan. reduced visibility from the EC, but some over 6'. to the extent practical, by preserving the trees views will be available from Rt. 20, and rolling terrain typical of the area; planting The hotel is located approximately 575' from including the area where the wall height Include on the hotel plan new trees along streets and pedestrian ways Rt. 250 and 125' from Rt. 20. Retail building ranges from approximately 5' to 10'. No all planting associated and choosing species that reflect native forest A is located 27' from Rt. 250. landscaping is proposed at the base of this with retaining walls that elements; insuring that any grading will blend wall, where the slope is relatively steep. are shown on the hotel into the surrounding topography thereby The phasing of the project leaves a 2-acre Views will be filtered by off -site wooded plan. creating a continuous landscape; preserving, pad for future development adjacent to the area to remain along the road. to the extent practical, existing significant Rt. 250 EC, in front of the hotel. Retaining river and stream valleys which may be located walls line the eastern edge of the pad. Trees Two retaining walls have been added west on the site and integrating these features into are shown along the EC frontage of the of the hotel, transitioning from the the design of surrounding development; and future pad site. sidewalk adjacent to the hotel down to limiting the building mass and height to a Pantops Corner Way. These walls have a scale that does not overpower the natural In addition to the three -tiered wall east of the maximum height of 5' and are planted with settings of the site, or the Entrance Corridor. future pad site, there are other significant shrubs. retainingwalls proposed throughout the site 10 to accommodate the development. The walls reach 6', 8' and 12' tall, but only those east of the pad site are stepped. The hotel is proposed at 5 stories high. This is taller than all buildings in the immediate vicinity except for the VNB building located on the south side of Rt. 250. Eventually, buildings in the "future development" area will limit visibility of the hotel from Rt. 250. A 7' wall is proposed at the northwest corner of the Wawa site. It is not terraced. Three long terraced walls with maximum height of 6' are proposed on the east side of the Wawa site. If these walls are to be approved with the hotel plan, the planting associated with the walls must also be included on the hotel plan. 39 The relationship of buildings and other Building A and the hotel building are None. The Building A footprint has been None. structures to the Entrance Corridor street and situated parallel to the Rt. 250 EC. The hotel removed from the plan, but the area is to to other development within the corridor is not parallel to the Rt. 20 EC. be graded and a retaining wall is shown on should be as follows: the west side of Pantops Corner Way in the a. An organized pattern of roads, service The layout of the site appears generally vicinity. lanes, bike paths, and pedestrian walks should organized, though a large portion of the guide the layout of the site. development is not yet shown. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Sidewalk connections are made to both Rt. Building groupings should be arranged to 250 and Rt. 20. parallel the Entrance Corridor street. c. Provisions should be made for connections A small pocket of existing wooded area is to adjacent pedestrian and vehicular shown to remain at the northeast corner of circulation systems. the site. It is connected to a larger wooded d. Open spaces should be tied into area located behind the Ford car dealership. surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. 11 f. The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic The use of retaining walls is not limited in Terrace retaining walls 6' The walls east of the Wawa site and just Include on the landscape relationship of the site to surrounding this proposal. A large portion of the in height and taller and west of the hotel are terraced; the others plan the plants associated conditions by limiting the use of retaining walls development adjacent to Rt. 250, east of the plant the terraces. are not. with any retaining walls and by shaping the terrain through the use of interior road would be graded for future shown on the plan. smooth, rounded land forms that blend with the development. This results in a large, Provide top -of -wall and Although the walls on the Wawa site (east Intensify landscaping to existing terrain. Steep cut or fill sections are rectangular pad with three retaining walls bottom -of -wall elevations side and northwest corner) are shown on compensate for walls generally unacceptable. Proposed contours on adjacent to the eastern property line. The for the retaining walls. the hotel plan, the plants associated with over 6' tall that are not the grading plan shall be rounded with a ten walls are approximately 270', 350' and 390' the walls are not shown on the plan. terraced. foot minimum radius where they meet the long with 3' spacing between each wall. A Intensify the landscaping adjacent condition. Final grading should note indicates that they are approximately 6' to compensate for 8' The wall on the north side of the site Provide top -of -wall and achieve a natural, rather than engineered, tall. Rows of shrubs are shown at the base of retaining walls. reaches 14' tall and has no plants at its bottom -of -wall elevations appearance. Retaining walls 6 feet in height and each wall. base. for the retaining walls. taller, when necessary, shall be terraced and planted to blend with the landscape. A 6'-12'-tall retaining wall approximately Top -of -wall and bottom -of -wall elevations Add trees at the base of 450' long, runs along the northeastern, have not been provided for the retaining the northern retaining northern, and northwestern boundaries of the walls. wall to mitigate heights hotel parking lot. A 225'-long 8'-tall wall over 6'. marks the southeast corner of the hotel A note on the landscape plan states that parking lot. 788' of retaining wall will be screened with Coordinate the evergreens. This planting is not illustrated evergreens/retaining wall A 165'-long wall parallels the interior road on the plan. note (788' with evergreen just north of the proposed retail building. screen) with the plants illustrated on the plan. Provide for review, and in the site plan, a detail of the 42" retaining wall handrail. 41 No grading, trenching, or tunneling should Some proposed grading falls within the line Adjust the proposed Grading and tree preservation areas have None. occur within the drip line of any trees or other of trees to remain along the Rt. 20 frontage. grading to eliminate been coordinated. Tree protection fencing existing features designated for preservation in conflicts with wooded is shown on the site, grading and landscape the final Certificate of Appropriateness. area to remain. Show plans. Adequate tree protection fencing should be adequate tree protection shown on, and coordinated throughout, the fencing on the grading, 12 grading, landscaping and erosion and sediment landscaping and erosion control plans. and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 20 Surface runoff structures and detention ponds No above -ground stormwater facilities are None at this time. Underground stormwater facilities are None. should be designed to fit into the natural proposed. proposed. topography to avoid the need for screening. When visible from the Entrance Corridor street, these features must be fully integrated into the landscape. They should not have the appearance of engineered features. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. 13 Staff recommends the following as the primary points of discussion: 1. The architectural design of the hotel: the western wing, building materials/colors, overall coordination 2. The proposed brick color; the brick sample vs. the brick illustrated in the renderings 3. Planting along retaining walls, in particular the 14'-high northern wall 4. Hand rail on retaining walls: white pickets west of the hotel Staff recommends approval with the following conditions: 1. Revise the white picket hand rail for greater consistency with the immediate setting. Include a detail(s) in the site plan for all hand rails. 2. Coordinate all drawings with submitted material samples/colors, in particular the EIFS and brick. 3. Clarify the discrepancy between the illustrated brick and the submitted brick sample. Clarify how the illustrated brick will have an appropriate appearance for the EC. 4. Include the wood product in the materials list on the architectural drawings and provide a sample. 5. Correct the labels on the lighting plan for the wall fixtures: change the two "D" labels to "B". 6. Provide on the lighting plan information showing that the light fixtures will have a consistent dark brown, dark bronze or black finish. 7. Coordinate the evergreens/retaining wall note (788' with evergreen screen) with the plants illustrated on the plan. 8. Reposition the water and sanitary lines to reserve planting area for future Rt. 20 EC street trees south of Pantops Corner Way. 9. Revise the planting size of interior road trees to 2 1/2" caliper. 10. Consider adding trees along the sidewalks at the north, south and east elevations of the hotel. 11. Specify the perimeter parking lot tree planting size as 2 1/2" caliper. 12. Replace the Franklin tree with a tree from the recommended plant lists. 13. Add a fourth shrub type to the plant list. Limit the number of proposed plants for any one species to 25% of the total proposed for that plant type (tree, shrub). 14. Add trees at the base of the northern retaining wall to continue the EC planting and to mitigate heights over 6'. 15. Include on the landscape plan the plants associated with any retaining walls shown on the plan. Intensify landscaping to compensate for walls over 6' tall that are not terraced. 16. Provide top -of -wall and bottom -of -wall elevations for all retaining walls. 14 TABLE A This report is based on the following submittal items: Sheet # Drawing Name Revision Date Sheet # Drawing Name Drawing Date C1 Cover Sheet 1/22/2019 A141 Aerial view from Southwest Sept. 2018 C2 Proffer & Exhibits 1/22/2019 A102 View from Southwest Sept. 2018 C3 Existing Boundary 1/22/2019 A103 View from North (Bypass road Sept. 2018 C4 Existing Conditions 1/22/2019 A104 View from Northeast Sept. 2018 C5 Site Plan 1/22/2019 A105 View from South Rear Sept. 2018 C6 Grading Plan 1/22/2019 A201 View from Northwest Sept. 2018 C7 Utility Plan 1/22/2019 A202 View from North Sept. 2018 C8 Landscaping Plan 1/22/2019 A301 Site Sections Sept. 2018 C9 Lighting Plan 1/22/2019 A302 Drive -by Visibility Sept. 2018 C10 Landscape/Lighting Details 1/22/2019 A401 First Floor Plan Sept. 2018 C11 Road Plan A 1/22/2019 A402 Second Floor Plan Sept. 2018 C12 Road Plan B & Rt. 20 WL Crossing Profile 1/22/2019 A404 Typical 3-5 Floor Plan Sept. 2018 C13 VDOT Details 1/22/2019 A501 Front(North) Elevation Sept. 2018 C14 San. Sewer Profiles & Details 1/22/2019 A502 Rear (South) Elevation Sept. 2018 C15 Storm Sewer Profiles 1/22/2019 Material Samples: Thin utility brick: 67% Grey Blend Velour and 33% Manganese Ironspot Velour (11 5/8" x 3 5/8" x 5/8"); 20% of Manganese will be 11 5/8" x 3 5/8" x 1" thick); Dryvit: 142 Spectrum Brown, 113 Amarillo White, 396 Alabaster C16 SWM Details 1/22/2019 C17 Water Details 1/22/2019 15