HomeMy WebLinkAboutWPO201500076 Bond Release Mitigation Plan 2018-07-25Wens]Use(hay
es 'Date Received: K 7C^
Receivedtry: 4r7,,__`1
91(4-%.......Busk': Forward to M eldeenl Awalnt
a pm
1,111:
61.
1%
BONDI671114-
O
INSPECTION REQUEST
u-, ) -( /
1-
c-
APPROVED PLAN#WP0201400006
PROJECT NAME: Old Ballard Farm Sub.-Lots15116 Driveway
As listed on the approved plan)
This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for
each inspection. Please check the inspections requested.
121 VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207&208 5250
o Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; S269
o Water&Sewer per Subdivision Ordinance section 14-435 S269
Site Development Performance bond(incomplete Site Work&Landscape Maintenance) $301
TOTAL FEES$250
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902,Attention:Management Analyst-Phone 434-296-5832;Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings,inspection reports,and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures.A minimum 20%of the original
posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if
landscape installation is part of the bonded incomplete site work,a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to;
EMAIL: woodswer@aol.com
OR REGULAR MAIL ADDRESS:
l, Gdl.,Vo
Signature of Owner/Developer
Jean Ann Woods for Deep Acres, LLC
5/30/2018PrintName
Date
Revised 7115/2014,7/20/2015,11/3/2015