Loading...
HomeMy WebLinkAboutARB201900026 Correspondence 2019-03-18Heather McMahon From: Heather McMahon Sent: Monday, March 18, 2019 1:15 PM To: 'Lauren Routson' Cc: Casey Kilmartin; 'Bob Pingry' Subject: RE: ARB2019-26: Goodwill sign -- changes requested Attachments: ARB2019-26 CoA with approved drawings.pdf Hello Lauren, Thank you for the revised drawings. Please find your CoA attached. Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.ore From: Lauren Routson <Iroutson@gropen.com> Sent: Monday, March 18, 2019 10:52 AM To: Heather McMahon <hmcmahon@albemarle.org> Cc: Casey Kilmartin <CKilmartin@gropen.com> Subject: RE: ARB2019-26: Goodwill sign -- changes requested Hi Heather, The logo/cabinet sign has been removed from the plans and is no longer being fabricated. Attached are new updated plans. Thanks. From: Heather McMahon <hmcmahon@albemarle.org> Sent: Friday, March 15, 2019 4:46 PM To: Lauren Routson <Iroutson@gropen.com> Cc: Casey Kilmartin <CKilmartin@gropen.com> Subject: RE: ARB2019-26: Goodwill sign -- changes requested Hello Lauren, If you are proposing external illumination for the logo/cabinet sign, you need to: 1. Show where the lighting fixture(s) will be mounted on the elevations 2. Provide manufacturer's cut sheets for the proposed light fixture(s) 3. Remove the note on page 7 about milliamps because that only applies to internal illumination 4. Add a note on page 7 that states: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle. I suggest you revisit the application and checklist for signs, especially section 3: SECnON 3: ILLUMINATION REQUIREMENTS A. If the nrolyused fJgn is to be illuminatrd, the applicant must proside thr folltMing: L Electrical permit L] Electrical schematic L1 Tit location of proposed Iight fixtures idrntifled tin a plan andrar elevation L Manuf ietur2r cut sheets desuibing illuminafii)n type, intensity, ,;tylc %hi-lding� color. and height. All fighting mint meet ordinance requirements us outhned in Section 4.17 of the Zoniz_g Ordin::nce-. I equally encourage you to consider the outdoor lighting regulations in the Zoning Ordinance, Chapter 18, Section 4.17 as well as section 5 (pages 6-7); section 9e. (page 10); and section 10e. (page 15) of the Entrance Corridor Sign Guidelines when selecting your external illumination. As a courtesy, I have attached the lighting guidelines checklist which ARB staff uses to ensure that light fixtures in the EC comply with the lighting criteria (numbers 22-31) detailed in the Entrance Corridor Design Guidelines. Not all of the criteria will apply to you, but pay careful attention to criteria #23, 24, 25, 26, 30 and 31. Please let me know if you have questions before resubmitting. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.orR From: Lauren Routson <Iroutson@hropen.com> Sent: Friday, March 15, 2019 4:24 PM To: Heather McMahon <hmcmabon@albemarle.org> Cc: Casey Kilmartin <CKilmartin(a)gropen.com> Subject: RE: ARB2019-26: Goodwill sign -- changes requested Hello Heather, Changes have been made per your request. Please let me know if any other information is needed. Thanks so much, Lauren RouLson 434-295-1924 (100) Iroutson(a@Rropen.com 1766 Scottsville Road I Charlottesville, VA 22902 F GPOPEN From: Heather McMahon <hmcmahonL@albemarle.org> Sent: Friday, March 15, 2019 2:45 PM To: Lauren Routson <Iroutson@gropen.com> Cc: Bob Pingry <bobpingry@gmail.com> Subject: ARB2019-26: Goodwill sign -- changes requested Hello Lauren, I have reviewed your sign application for Goodwill. Your proposal does not meet all of the criteria of the Northtown Center Comprehensive Sign Plan, which was approved in February 2019 (see the attached CoA). Changes are requested in order to meet the approved criteria; see the attached letter for more details. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.ore Heather McMahon From: Heather McMahon Sent: Thursday, March 14, 2019 4:24 PM To: Lauren Routson Cc: Margaret Maliszewski; Michael Dellinger, Jennifer Pritchett; Bart Svoboda Subject: RE: status of permit Hello Lauren, Your ARB application was received by ARB staff on 3/6/19. ARB policy is that staff has two weeks from the date of receipt to review an application. In addition, ARB is one of several reviewers of the sign permit. ARB staff will not approve your sign permit until the Certificate of Appropriateness is issued to you, which depends on the completeness of your application and its fulfillment of all of the Entrance Corridor and Zoning Ordinance regulations relating to signage. Again, that review can take up to two weeks from the date the application was received. I will be in touch once I have reviewed your sign application. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Jennifer Pritchett Sent: Thursday, March 14, 2019 3:32 PM To: Lauren Routson <Iroutson@gropen.com> Cc: Margaret Maliszewski <MMaliszewski@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Bart Svoboda <bsvoboda@albemarle.org> Subject: RE: status of permit Good afternoon Lauren, I'm checking into. One of the CC'd will update you on the status. Thank you, Jennifer From: Lauren Routson <Iroutson@gropen.com> Sent: Thursday, March 14, 2019 3:26 PM To: Jennifer Pritchett <iritchett@albemarle.org> Subject: status of permit Hi Jennifer, I am trying to get the status of a sign permit for Goodwill. I sent in the permit Feb 26th and the grand opening for Goodwill is in 2 weeks. I emailed Jeffrey Baker yesterday but did not hear back. Here is the tracking number 62019- 00359. 1 tried to track it but for some reason the county application site is not working. Any help would be much appreciated! Thanks so much! Lauren Routson 434-295-1924(100) Iroutson@gropen.com 1766 Scottsville Road I Charlottesville, VA 22902 C GROPEN Heather McMahon From: Bob Pingry <bobpingry@gmail.com> Sent: Thursday, December 27, 2018 5:20 PM To: Pete Cc: Margaret Maliszewski; Nena Harrell; Hunter Call; Heather McMahon Subject: Re: GOODWILL BUILDING C ELEVATIONS AND SIGN CONSTRUCTION DETAILS January 2 at 3 pm works. See you at your office. On Thu, Dec 27, 2018, 4:52 PM <phwrav@trianglerealtors.net wrote: I will be out of town until January 9 but Bob and Hunter know what we need ... thank you. From: Margaret Maliszewski <MMaliszewski@albemarle.org> Sent: Thursday, December 27, 2018 3:32 PM To: Nena Harrell <ulcwww@embargmail.com> Cc: Bob Pingry <bobpingry@gmail.com>; Pete <phwrav@trianglerealtors.net>; Hunter Call <hunter.caII13@gmail.com>; Heather McMahon <hmcmahon@albemarle.org> Subject: RE: GOODWILL BUILDING C ELEVATIONS AND SIGN CONSTRUCTION DETAILS Does Wednesday, January 2 at 3 PM work for everyone? From: Nena H <ulcwww@embargmail.com> Sent: Thursday, December 27, 2018 8:18 AM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Cc: Bob Pingry <bobpingry@gmail.com>; Pete <phwrav@trianglerealtors.net>; Hunter Call <hunter.caII13(a@gmail.com>; Heather McMahon <hmcmahon@albemarle.org> Subject: Re: GOODWILL BUILDING C ELEVATIONS AND SIGN CONSTRUCTION DETAILS All, I am out for rest of week. I will be back in touch re time soon. If others want to propose time, please do so. Nena Harrell 434-975-3334 Sent from my Whone On Dec 26, 2018, at 2:28 PM, Margaret Maliszewski <MMaliszewski@albemarle.org> wrote: Hello, Bob. Thanks for checking in on this project. It sounds like there remains some confusion about what is required for the Northtown Center Comprehensive Sign Plan approval. I've attached the August 6, 2018 ARB action letter and Heather's September email. Both provide direction on how to obtain approval. I recommend that we (you, me, Heather, Nena, and your sign company representative) meet to go over everything so that everyone involved understands all that is required, so we can get this wrapped up. Please provide a few days and times that your team will be available to meet here at the County Office Building and we'll let you know which dates/times will work. In the meantime, please note the following: 1. 1 suggest you pursue a temporary wall sign for Goodwill to ensure that you will have signage when the store opens. Application here. Information here. 2. Maximum allowable square footage is based on business frontage. You are showing signs for three businesses, but the floor plan seems to show only two. If you provide the business frontage for all three tenants, I will forward that information to our Zoning permit reviewers and they'll let you know the maximum allowable sign area for each. 3. The roof color change, and any other changes to the building, require a separate application and review by the ARB. In Part B of the a,)plication, check the box under "Review by the ARB" for "Amendment to an approved Certificate of Appropriateness." Metal/color samples will be required. As I've indicated previously, I don't think the blue is consistent with the other building materials and colors in the shopping center, so it is not likely that I will recommend approval to the ARB. The next submittal deadline is January 7 for a February 19 meeting. 4. Allowable logo colors will be determined by the approved Comprehensive Sign Plan. I'll wait to hear from you on potential meeting times Thanks. Margaret From: Bob Pingry <bobpingry@gmail.com> Sent: Friday, December 21, 2018 1:22 PM To: Margaret Maliszewski <MMaliszewski@albemarle.ore> Cc: Nena Harrell <ulcwww@embargmail.com>; Pete <phwray@trianglerealtors.net>; Hunter Call <hunter.caII13@gmail.com> Subject: GOODWILL BUILDING C ELEVATIONS AND SIGN CONSTRUCTION DETAILS Margaret: We have completed a CSP plan that I think addresses all of the items you asked Nena to provide upon review of her CSP application, which I have attached. Gropen's plan (attached) shows channel letter dimensions and color possibilities. We are requesting the colors specified to coordinate with the Goodwill Blue and a tenant prospect for red. Also shown is the existing brown standing seam metal roofs painted Goodwill Blue. The priority for Goodwill is to get there sign up between now and February to accommodate their projected opening in early February. They have agreed to a white channel letter to accommodate this schedule, but it is not there preference. They also will open with the no change to the existing standing seam metal shed roof color, but also is not their preference. What else do you need to to approve a CSP for this center and if an approval is possible to allow for fabrication lead time for the signage. If the timing for CSP approval is in mid to late January, can Goodwill submit a sign application based on the existing Gander sign dimensions in white channel letters? Can their logo use their logo colors? Thank you very much for your assistance to accommodate this part of the Gander building renovation. Have a great Holiday Season! <ARB -2018-77 and ARB -2018-94 Northtown Center Comprehensive Sign Plan ULC and Burnt Boot Camp Signs.pdf> <mime -attachment>