The Albemarle County Architectural Review Board, at its meeting on November 6, 2017, completed an
improvements.
WATTWIN
drawings reviewed on Novebmer 6, 2017.
The ARB also noted the following expectations for the future site plan submittal:
I . Secondary planting will be required to screen equipment.
2. The sidewalk along the entrance elevation should connect to the sidewalk along Avon
Street,
convenience. Application forms, checklists and schedules are available on-line at
www.albemarle.oryLARB,
Sincerely,
Margaret Maliszewski
zc: Destiny Of Lynchburg LLC
P 0 Box 359
Keene VA 22946
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone 434 296-5832 Fax 434 972-4126
April 25, 2018
Rusty Coan
Cross Development
4336 March Ridge
Carrollton, VA 75010
RE: SP201700016 Caliber Collision
Dear Mr. Coan,
On April 11, 2018, the Board of took action on your special use permit to propose a body shop in a
new building of approximately 18,700 which includes approximately 2,200 sq. ft. of office space.
on Tax Map Parcel 07700-00-00-011F0 in the Scottsville District. The Special Use permit was
approved by the Board's adoption of the attached resolution and conditions.
Please be advised that although the Albemarle County Board of Supervisors took action on the
project noted above, no uses on the property as approved above may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN or a SITE PLAN AMENDMENT; and
• approval of a ZONING COMPLIANCE CLEARANCE.
Before beginning uses as allowed by this special use permit or if you have questions regarding the above -
noted action, please contact Rebecca Ragsdale at (434) 296-5832 ext. 3226.
Sincerely,
Cameron Langille
Senior Planner
Planning Division
CC: Destiny of Lynchburg LLC
PO Box 359
Keene VA 22946
RESOLUTION TO APPROVE
SP 2017-16 CALIBER COLLISION; BODY SHOP
WHEREAS, Caliber Collision submitted an application for a special use permit to establish a body
shop and associated improvements on Tax Map Parcel Number 07700-00-00-0111~0, and the application is
identified as SP201700016 Caliber Collision Body Shop ("SP 2017-16"); and
WHEREAS, on March 6, 2018, after a duly noticed public hearing, the Albemarle County Planning
Commission recommended approval of SP 2017-16 with conditions; and
WHEREAS, on April 11, 2018, the Albemarle County Board of Supervisors held a duly noticed
public hearing on SP 2017-16.
NOW, THEREFORE, BE IT RESOLVED that, upon consideration of the foregoing, the staff
report prepared for SP 2017-16 and all of its attachments, the information presented at the public hearing,
and the factors relevant to a special use permit in AIbemarle County Code §§ 18-24.2.2(17) and 18-33.8, the
Albemarle County Board of Supervisors hereby approves SP 2017-16, subject to the conditions attached
hereto.
1, Claudette K. Borgersen, do hereby certify that the foregoing writing is a true, correct copy of a
Resolution duly adopted by the Board of Supervisors of Albemarle County, Virginia, by a vote of six to zero,
as recorded below, at a regular meeting held on April 11, 2018.
Clerk, Board of County Supervis
Aye Nay
Mr. Dill
Y
Mr. Gallaway
Y
Ms. Mallek
Y _
Ms. McKeel
Y
Ms. Palmer
Y
Mr. Randolph
Y
SP 2017-16 Caliber Collision; Body Shop Special Use Permit Conditions
Development and use shall be in general accord with the following revised plans originally prepared by
Freeland and Kauffman, Inc. last updated March 8, 2018 entitled "Caliber Collision, Conceptual Site
Plan, Conceptual Grading PIan, Conceptual Landscape Plan," (hereafter "Concept Plan") as determined
by the Director of Planning and the Zoning Administrator. To be in general accord with the Concept
Plan, development and use shall reflect the following major elements as shown on the plans:
a. Limits of disturbance
b. Location of buildings and structures
c. Location of parking areas
d. Location of driveways and entrances
e. Relation of buildings and parking to the street
Minor modifications to the Concept Plan that do not otherwise conflict with the elements listed above
may be made to ensure compliance with the Zoning Ordinance.
2. Development and use shall also be in general accord with the following plans originally prepared by
Brian Rumsey, dated November 1, 2017 and last updated March 12, 2018 entitled "Caliber Collision
Exterior Elevations" (hereafter "Elevations"), as determined by the Director of Planning and the Zoning
Administrator. To be in general accord with the Elevations, development and use shall reflect the
following major elements as shown on the Elevations:
a. Building massing, shape, and height
b. Fenestration or architectural features along the "02 Left Elevation (South)" fagade to provide a
pedestrian orientation. Alternatively, this condition may be satisfied with a combination of wall
plantings, architectural features, and fenestration along this particular elevation to the satisfaction of
the Director of Planning or his/her designee.
Minor modifications to the Elevations that do not otherwise conflict with the elements listed above may
be made to ensure compliance with the Zoning Ordinance.
I Upon request of the County, the applicant shall dedicate land within the 100 -year floodplain and stream
buffers to public use near Moore's Creek for a potential future greenway trail. Actual trail planning,
permitting, and construction is to be carried out by others.
4. Approval of a construction permit for installation of the proposed septic system is required by the
Virginia Department of Health prior to final site plan approval by Albemarle County.
S. Approval of an Access Management Exception Request by the Virginia Department of Transportation
will be required prior to final site plan approval by Albemarle County.
6. The use shall commence on or before April 11, 2021 or the permit shall expire and be of no effect.