Loading...
HomeMy WebLinkAboutSP201700016 Approval - County Special Use Permit 2017-11-17COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434 296-5832 ax ( 4) 972-4126 X usty A. Coan Cross DeygLcq_w_,extJJ_C_ 4336 Marsh Ridge Carrollton TX 75010 The Albemarle County Architectural Review Board, at its meeting on November 6, 2017, completed an improvements. WATTWIN drawings reviewed on Novebmer 6, 2017. The ARB also noted the following expectations for the future site plan submittal: I . Secondary planting will be required to screen equipment. 2. The sidewalk along the entrance elevation should connect to the sidewalk along Avon Street, convenience. Application forms, checklists and schedules are available on-line at www.albemarle.oryLARB, Sincerely, Margaret Maliszewski zc: Destiny Of Lynchburg LLC P 0 Box 359 Keene VA 22946 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone 434 296-5832 Fax 434 972-4126 April 25, 2018 Rusty Coan Cross Development 4336 March Ridge Carrollton, VA 75010 RE: SP201700016 Caliber Collision Dear Mr. Coan, On April 11, 2018, the Board of took action on your special use permit to propose a body shop in a new building of approximately 18,700 which includes approximately 2,200 sq. ft. of office space. on Tax Map Parcel 07700-00-00-011F0 in the Scottsville District. The Special Use permit was approved by the Board's adoption of the attached resolution and conditions. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; • approval of and compliance with a SITE PLAN or a SITE PLAN AMENDMENT; and • approval of a ZONING COMPLIANCE CLEARANCE. Before beginning uses as allowed by this special use permit or if you have questions regarding the above - noted action, please contact Rebecca Ragsdale at (434) 296-5832 ext. 3226. Sincerely, Cameron Langille Senior Planner Planning Division CC: Destiny of Lynchburg LLC PO Box 359 Keene VA 22946 RESOLUTION TO APPROVE SP 2017-16 CALIBER COLLISION; BODY SHOP WHEREAS, Caliber Collision submitted an application for a special use permit to establish a body shop and associated improvements on Tax Map Parcel Number 07700-00-00-0111~0, and the application is identified as SP201700016 Caliber Collision Body Shop ("SP 2017-16"); and WHEREAS, on March 6, 2018, after a duly noticed public hearing, the Albemarle County Planning Commission recommended approval of SP 2017-16 with conditions; and WHEREAS, on April 11, 2018, the Albemarle County Board of Supervisors held a duly noticed public hearing on SP 2017-16. NOW, THEREFORE, BE IT RESOLVED that, upon consideration of the foregoing, the staff report prepared for SP 2017-16 and all of its attachments, the information presented at the public hearing, and the factors relevant to a special use permit in AIbemarle County Code §§ 18-24.2.2(17) and 18-33.8, the Albemarle County Board of Supervisors hereby approves SP 2017-16, subject to the conditions attached hereto. 1, Claudette K. Borgersen, do hereby certify that the foregoing writing is a true, correct copy of a Resolution duly adopted by the Board of Supervisors of Albemarle County, Virginia, by a vote of six to zero, as recorded below, at a regular meeting held on April 11, 2018. Clerk, Board of County Supervis Aye Nay Mr. Dill Y Mr. Gallaway Y Ms. Mallek Y _ Ms. McKeel Y Ms. Palmer Y Mr. Randolph Y SP 2017-16 Caliber Collision; Body Shop Special Use Permit Conditions Development and use shall be in general accord with the following revised plans originally prepared by Freeland and Kauffman, Inc. last updated March 8, 2018 entitled "Caliber Collision, Conceptual Site Plan, Conceptual Grading PIan, Conceptual Landscape Plan," (hereafter "Concept Plan") as determined by the Director of Planning and the Zoning Administrator. To be in general accord with the Concept Plan, development and use shall reflect the following major elements as shown on the plans: a. Limits of disturbance b. Location of buildings and structures c. Location of parking areas d. Location of driveways and entrances e. Relation of buildings and parking to the street Minor modifications to the Concept Plan that do not otherwise conflict with the elements listed above may be made to ensure compliance with the Zoning Ordinance. 2. Development and use shall also be in general accord with the following plans originally prepared by Brian Rumsey, dated November 1, 2017 and last updated March 12, 2018 entitled "Caliber Collision Exterior Elevations" (hereafter "Elevations"), as determined by the Director of Planning and the Zoning Administrator. To be in general accord with the Elevations, development and use shall reflect the following major elements as shown on the Elevations: a. Building massing, shape, and height b. Fenestration or architectural features along the "02 Left Elevation (South)" fagade to provide a pedestrian orientation. Alternatively, this condition may be satisfied with a combination of wall plantings, architectural features, and fenestration along this particular elevation to the satisfaction of the Director of Planning or his/her designee. Minor modifications to the Elevations that do not otherwise conflict with the elements listed above may be made to ensure compliance with the Zoning Ordinance. I Upon request of the County, the applicant shall dedicate land within the 100 -year floodplain and stream buffers to public use near Moore's Creek for a potential future greenway trail. Actual trail planning, permitting, and construction is to be carried out by others. 4. Approval of a construction permit for installation of the proposed septic system is required by the Virginia Department of Health prior to final site plan approval by Albemarle County. S. Approval of an Access Management Exception Request by the Virginia Department of Transportation will be required prior to final site plan approval by Albemarle County. 6. The use shall commence on or before April 11, 2021 or the permit shall expire and be of no effect. .<j••�i. ter