Loading...
HomeMy WebLinkAboutWPO201800073 VSMP - SWPPP 2019-03-27 Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item #12 must be signed by the appropriate person associated with this operator.) University of Virginia Foundation Name: Todd Marshall Contact: P.O. Box 400218 Mailing Address: 22904 Charlottesville434-924-2569 VA City: State: Zip: Phone: Email address (if available): Indicate if DEQ may transmit general permit correspondence electronically: Yes No 2. Existing General Permit Registration Number (for renewals only): 3. Name and Location of the Construction Activity: Lewis and Clark Drive Road Extension Name: 4211 Lewis and Clark Drive Address (if available): Charlottesville Virginia 22911 City: State: Zip: Albemarle County (if not located within a City): -78.438957 38.146487 Latitude (decimal degrees): Longitude (decimal degrees): Name and Location of all Off-site Support Activities to be covered under the general permit: Name: Address (if available): City: State: Zip: County (if not located within a City): Latitude (decimal degrees): Longitude (decimal degrees): 4. Status of the Construction Activity (check only one): Federal State Public Private 5. Nature of the Construction Activity (e.g., commercial, industrial, residential, agricultural, oil and gas, etc.): Commercial 6. Name of the Receiving Water(s) and Hydrologic Unit Code (HUC): Rivanna Name: Name: 02080204 HUC: HUC: 7. If the discharge is through a Municipal Separate Storm Sewer System (MS4), the name of the MS4 operator: 8. Estimated Project Start and Completion Date: 03/01/2020 03/01/2019 Start Date (mm/dd/yyyy): Completion Date (mm/dd/yyyy): 455.85 9. Total Land Area of Development (to the nearest one-hundredth acre): 12.50 Estimated Area to be Disturbed (to the nearest one-hundredth acre): 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes No 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Title: Signature: Date: (Please sign in INK. This Certification must be signed by the appropriate person associated with the operator identified in Item #1.) 07/2014 Page 1 of 1