HomeMy WebLinkAboutSDP201700065 Approval - County 2019-03-26COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
March 26, 2019
Mr. Chris Schooley — UVA Foundation
cschooley(a4uvafoundation. com
RE: Approval Letter for SDP-2017-00065 (Boar's Head Inn — Letter of Revision/LOR #2)
Mr. Schooley:
This letter acknowledges that Agent for the Board of Supervisors has granted administrative approval to
the above referenced Letter of Revision (LOR) #2 (dated February 4, 2019). The County View
application tracking software was previously updated by CDD-Planning and CDD-Zoning to reflect a
review status of "No Objection" on 2/21/2019 and 2/27/2019, respectively.
Please retain a copy of this approval letter as documentation of this administrative approval.
Additionally, a copy of this approval letter and approved application materials for LOR #2 (including the
signed, approved LOR #2 plan sheets) have been added to the application folder for SDP-2017-00065.
If you have any questions or requests for assistance, please feel free to contact me at (434)-296-5832 x
3088 or tpadalino&albemarle.org. Thank you.
Sincerely,
/nc
Tim Pada ino, AICP I Senior Planner
County of Albemarle I Community Development Department
Page 1 of 1
Dewberry
Engineers Inc. 804.290.7957
Va"4805 Lake Brook Drive, Suite 200 804.290.7928 fax
Glen Allen, VA 23060 www.dewberry.com
February 4, 2019
Albemarle County c/o Tim Padalino
Community Development Department
401 McIntire Rd
Charlottesville, VA 22902
RE: Boar's Head Inn Lobby Renovation and Parking Relocation — SDP20170oo65 - Letter of Revision #2
Dear Mr. Padalino,
This letter is to notify Albemarle County of proposed revisions to a previously approved site development
plan. The Boar's Head Inn Lobby Renovation and Parking Relocation project, SDP20170oo65, received
final approval on 6/14/2018.
The proposed changes as part of this Letter of Revision application are as follows:
i. A Phase line has been shown on sheet C3.01 to separate the main parking area at the Lobby
renovation and the access drive between the new lot and Ednam Drive. Plan sheets have been
attached with this application showing this.
2. Notes have bene added to sheets Ti.oi, C2.04, C3.02, and C3.04 stating that the improvements
shown on these sheets will be done with a future phase.
3. Notes have bene added to sheets C2.05, and C3.07, associated with Letter of Revision #1 for the
keg storage building, stating that the improvements shown on these sheets will be done with a
future phase
Find the following plan sheets attached showing proposed changes relating to the items above.
Ti.ol — Cover Sheet
C2.04 — Demolition Plan
C2.05 — Keg Storage Shed Demolitions and ESC Phase I Plan
C3.01— Site Plan
C3.02 — Site Plan
C3.04 — Grading and Utility Plan
C3.07 — Keg Storage Shed Site, Utility, Grading, and ESC Phase II Plan
Do not hesitate to contact if you have any questions or concerns, or if you need additional information.
Sincerely,
000111
F. Cameron Palmore
Senior Project Manager
Page 1 of 1