Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201800094 Bond Estimates 2019-03-28
Project Name: Milestone Communications - Shentel at Western Albemarle High School VSMP/WPO 201800094 WPO file number: WP0201800094 TMP: 05600-00-00-017CO Date Estimate Completed: 03/28/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) 0.32 acres $5,000.00 $1,600.00 2 silt fence (SF) ; Drew Barnocky, email March 21, 2019 11:31 AM 650 ft $5.00 $3,250.00 3 safety fence/tree protection ft $5.00 $0.00 4 diversion (DID, FD, RWD) ft $13.00 $0.00 5 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 30 31 silt fence inlet protection (IP) $100.00 $0.00 32 stone inlet protection (IP) $200.00 $0.00 33 outlet protection (OP) length ft width ft $0.00 $0.00 34 channel (SCC, matted)' length 180 ft width 10 ft $2,340.00 channel (SCC, matted) = VESCH 3.36, Soil Stabilization blanket and matting - Ave. L X w 35 check dam depth in channel 1 ft channel width 6 ft 2 $135.00 $270.00 36 construction entrance (CE) $2,000.00 $0.00 37 wash rack 1 $2,000.00 $2,000.00 38 paved construction entrance 1 $3,500.00 $3,500.00 39 rip -rap, placed depth ft length ft 40 width (tons) 0 tons $60.00 $0.00 41 42 survey and layout (price per 0.' acres traps and basins $0.00 43 mobilization $2,000.00 44 stream crossing (computed independently) $0.00 WP0201800094_Milestone WAHS_ESC_bond _est_09-27-17_032819 cost sum $14,960.00 contingency $1,496.00 Total $16,456 3/28/2019