HomeMy WebLinkAboutWPO201800046 Inspection 2019-02-18Compliant Notice to Comply E
Stop Work L3 Bond Insp E
Warning [] Under NTC E
Under S WO El Re -inspection (fee) L:
Erosion Control Inspection Report
-vJ Pa.
Project Name: e V" LS SP Number,
ba z 42 Iff J 2,0041 L/4
Location
Contractor '
County Inspector: T �A Inspection Date: j- Lot #
For Warnings or Notices, DATE TO COMPLY BY --_Agreement #
Initial controls 0 Clearing El Rough Grading ConstruclionP Finish Grading El Stabilization ❑ swm conversion El
r—c- ��--W-
NO
Silt, safety, +
treefence
biv—eriiions.
Berms
I inlet, culvert
wotection
Stream
work,
Traps,
Basins
Stabilization
Entrances
Limits
Disposal
SolidWaste
Disposal
waste
Ttw,Fofl
Storage
SWPPP
Compliance
costing