Loading...
HomeMy WebLinkAboutARB201800036 Review Comments 2018-03-12 Margaret Maliszewski From: Margaret Maliszewski Sent: Monday, March 12, 2018 3:22 PM To: 'Ed Brown' Subject: Pantops Shopping Center sign - information needed for ARB review Attachments: EMS draft criteria checklist.doc Ed, Thanks for your sign application for the Pantops Shopping Center freestanding sign.There are some items missing from the submittal that are needed to complete the review for the ARB. Please submit these items so that ARB review of the application can proceed: 1. Please provide a digital version of the sign drawings and attachments so that we can provide copies to the ARB members. 2. The "refacing" box is checked on the application. Please provide some detail to clarify how the proposal is a refacing.The sign looks like a new sign. 3. Please indicate on the drawing the proposed material for the sign base. If brick is proposed, indicate the manufacturer name and color name/number. (If we do not have a sample on file, we will let you know that a sample will need to be submitted.) 4. 3 Pantone colors are identified, including a shade of green for the mountain graphic and an alternate shade of green for the "Shopping Center" letters.The third Pantone color is a very dark blue, but no dark blue is visible on the sign drawing. "Pantops" and all tenant panel letters appear to be black. Please clarify the use of dark blue and black on the sign drawing. 5. Please confirm that the top panel and all tenant panels have opaque aluminum backgrounds. 6. The sign drawing shows an external light fixture located between the electronic message board and the tenant panels.The photosimulation shows the fixture near the bottom of the brick sign base. Please indicate which location is correct and revise the drawings accordingly. Indicate what the light fixture will be illuminating. 7. Light fixture cut sheets were submitted; however, a variety of options are outlined in the cut sheets and specific options have not been chosen. Please indicate on the cut sheets and/or on the sign drawing the light fixture options that are proposed.Also clearly indicate the total number of lumens emitted by the fixture. 8. Entrance Corridor sign guidelines require landscaping at the base of freestanding signs ("ground cover, shrubs and/or trees must be used to integrate freestanding signs into the overall landscape development of the site"). Provide a landscaping plan to meet this guideline. 9. A stapled set of 3 cut sheets was submitted for the electronic message display.The third sheet of the set is not legible. Please submit a legible copy. 10. The proposed electronic message display will be reviewed against the Draft Design Criteria for Electronic Message Signs (attached)that were drafted by the ARB on 2-17-2015. Only a few of these criteria are clearly addressed in the current submittal. Please provide additional information to address all of the criteria. (We realize that some of these may be addressed with the completion of#9.) Feel free to add to the right-hand column of the criteria table (attached)to outline your proposal. Thanks for your assistance. Margaret Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road 1 Charlottesville,VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 2 Margaret Maliszewski From: Ed Brown <ed@frontrunnersigns.com> Sent: Monday, April 30, 2018 5:09 PM To: Margaret Maliszewski Subject: RE: Pantops Shopping Center sign - information needed for ARB review Attachments: Pantops Font and Color Options.pdf; pantops-shopping-center quote.pdf; SC Duration for enforced slide duration.pdf; Design and Tech Specs for EMS at Pantops Shopping Center.docx Hi Margaret, Attached are my updated additions to the documents we have already submitted. 1) Attached is a screen shot of the Sign Command software that shows where the manufacturer can set preselected parameters that cannot be overridden by the end user, specifically duration of the slide, specified minimum of 15 seconds per slide (See SC Duration for enforced slide duration.pdf). 2) Attached are the Color and Font options for the sign.The font Myriad Pro matches the lettering on the rest of the sign and the others are fairly basic, san-serif fonts. (See Pantop Font and Color Options.pdf)The 3) I will drop off a sample of the Poly Armor tomorrow (May 15`) morning. 4) Attached is a modified Design/Technical Specs file to accompany the drawings. I also have a pdf attached (pantops-shopping-center-quote.pdf) that has quite a bit of this information as well, however, not quite as organized. Please let me know if you have any questions or problems with the attachments or if you need any additional information. Thanks! -7-- 12 YiL.( Ed. /(4im ej l�n,o� ,ems 6/j_e_zgf�l Ed Brown. � � Frontrunner Sign Studios Lti( %G �' /LX V () 1304 E. Market Street, Suite 0. Charlottesville,VA 22902 434-293-7446 frontrunnersigns.com From: Ed Brown [mailto:ed@frontrunnersigns.com] Sent: Monday, April 30, 2018 8:39 AM To: 'Margaret Maliszewski' Subject: RE: Pantops Shopping Center sign - information needed for ARB review Hi Margaret, Thanks for the follow up. I will have the updated information to you later on today. Please let me know if you have any questions. Thanks! Ed. 1 Additional Information Requested for ARB Review of the Pantops Shopping Center Sign 1. Please provide a digital version of the sign drawings and attachments so that we can provide copies to the ARB members. See All Attached 2. The"refacing" box is checked on the application. Please provide some detail to clarify how the proposal is a refacing.The sign looks like a new sign. We are trying to use the same structure/footprint for this project.The existing posts will be used for the structure and covered with aluminum sleeves. 3. Please indicate on the drawing the proposed material for the sign base. If brick is proposed, indicate the manufacturer name and color name/number. (If we do not have a sample on file, we will let you know that a sample will need to be submitted.) We are using a Poly Armor material to create a faux brick base to match the Farmington Brick from Skyline Brick. See Attachments for PolyArmor Specs. If needed,we have a sample in process for submittal. 4. 3 Pantone colors are identified, including a shade of green for the mountain graphic and an alternate shade of green for the "Shopping Center" letters.The third Pantone color is a very dark blue, but no dark blue is visible on the sign drawing. "Pantops" and all tenant panel letters appear to be black. Please clarify the use of dark blue and black on the sign drawing.The color of the PANTOPS letters as well as the tenant names is the dark blue pantone 532, it is very close to black. 5. Please confirm that the top panel and all tenant panels have opaque aluminum backgrounds. Yes, the top panels and tenant panels will all be opaque aluminum backgrounds with clear push through acrylic letters. 6. The sign drawing shows an external light fixture located between the electronic message board and the tenant panels.The photosimulation shows the fixture near the bottom of the brick sign base. Please indicate which location is correct and revise the drawings accordingly. Indicate what the light fixture will be illuminating.This has been corrected on the new documents.The fixture will be above the Message board. 7. Light fixture cut sheets were submitted; however, a variety of options are outlined in the cut sheets and specific options have not been chosen. Please indicate on the cut sheets and/or on the sign drawing the light fixture options that are proposed.Also clearly indicate the total number of lumens emitted by the fixture. Please see additional attached information sent to Margaret Maliszewski.Total Lumens emitted for LED Standard Output would be 2050 lumens per fixture. 8. Entrance Corridor sign guidelines require landscaping at the base of freestanding signs("ground cover, shrubs and/or trees must be used to integrate freestanding signs into the overall landscape development of the site"). Provide a landscaping plan to meet this guideline. Please see additional attached information sent to Margaret Maliszewski. 9. A stapled set of 3 cut sheets was submitted for the electronic message display.The third sheet of the set is not legible. Please submit a legible copy. Please see additional attached information sent to Margaret Maliszewski. Polaris 10mm 96x160 Single Sided Full Color LED Display.This is the same information, reformatted for easier reading. 10. The proposed electronic message display will be reviewed against the Draft Design Criteria for Electronic Message Signs (attached)that were drafted by the ARB on 2-17-2015. Only a few of these criteria are clearly addressed in the current submittal. Please provide additional information to address all of the criteria. (We realize that some of these may be addressed with the completion of#9.) Feel free to add to the right-hand column of the criteria table (attached) to outline your proposal. Additional information has been added to the attached Draft Design Criteria for Electronic Message Signs file