HomeMy WebLinkAboutARB201900024 Checklist 2019-04-02ARB-2019-24: C&F Bank at Stonefield, Concept Plan/Advisory Review
HNM 4/2/19
Architectural Review Board
Concept Plan/Advisory Review Checklist for Completeness
® (8) collated copies of all information unless otherwise indicated.
A. Written description of the proposal
® Provide a general description of all proposed work.
® Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Sketch plan showing the following (drawn to the scale of 1 "=20', clearly legible and folded):
® Location(s) of proposed building(s) on the site.
® Schematic layout of parking, travelways, and other improvements.
❑1 Location of existing and proposed tree lines. Individually identify trees of 6-inch caliper or greater. commented [HM1]: N/A: no existing trees on site
❑1 Existing and proposed topography and conceptual grading drawn with contour intervals of 5-feet or Commented [HM2]: Not provided
less, and with sufficient offsite topography to describe prominent and pertinent off -site features and
physical characteristics, but in no case less than 50-feet outside of the site.
® ,Sheet number, total number of sheets, date of the drawings, date and description of the latest Commented [HM3]. xotpw ided
revision, and contact information for the firm preparing the drawings in the title block on all drawings.
C. Appearance of the proposed building(s)
® Show a representation of the appearance of the proposed building(s). This may include architectural
elevations, perspective sketches, or photos of the proposed building(s). These documents should
provide a basic understanding of:
® The size, form and scale of the building.
® The architectural style of the building.
® The proposed building materials and color(s).
D. Additional material
® Provide labeled, color, 8-'/2" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
® Signatures