Loading...
HomeMy WebLinkAboutARB201800055 Checklist 2018-05-13 . Provide specs for the proposed window glass. Ensure that VLT is not below(0% and VLR does not exceed 30%. Add the standard window glass note to the drawings. 4144 /d ayt /GXJ a, . Add screening trees or tall screening shrubs to reduce visibility of the equipment on the east side of the WTP building. IG-Yt e 7� !i /1-24/w $S '� 011A,d- ai-e17( e c)ei(___ 1/37 Revise the photometric plan to reduce illumination levels to not exceed 20 fc in all areas outside the WTP sediment basinG;.�,', tcd / /„_'? V4• Ensure that the photometrics are calculated using an LLF of 1.0 and note the LLF on the lighting plan. (` b AA7" Revise the fixtures to use LED lamps with a consistent warm white color mpera> . �� D f�.�t v�2 (2) • m, S- (�v Provide a luminaire schedule on the plan that identifies fixture height. l7. ) abel the fixtures on the lighting plan(13 of 33�1)/to coordinate with the cut sheets. r/(ilj- Ac4-1,,uaAt_ceuirtla) 17-1, ?va,ix.711.7 .48 ),, ,z,,,,1_,,-(e 4-1-4 ' Extend the staggered row of evergreen plants down the north/west side of the access road to provide greater screening.3 E4 a 01-4i' "`s 0.-/ �� y of Q cc_e S S ti-v 9 _sider increasing the spacing between plants based on anticipated mature size. f,4 ipik a4 fittriV fiCertilli<4.0 rttil4te-e ”...62-rf C' le. Y t/10. Revise the plans to show a tree line to remain in the area where pipes are shown crossing the road, and revise the landscape plan to show how this area will be replanted to attain an appearance consistent with the surroundings. ipe---)GtAtt 12-e 441d ' "6 //1-1t A-iv-YR-6 4--e 1 Reconsider the Leyland cypress for screening. Atli/la-cc( W _1-2. Consider adding screening at the loading dock. d 600-44E' . The quantity of W4 and C2 light fixtures noted in the luminaire schedule does not match the 1 e quantity illustrated on the plan. LINING PLAN REVIEW CHECKLII CHECKLIST ITEM NOTES Cut sheets Lumen level (3000 or more must be full p� cutoff) id,t0 Bulb/lamp location(must be totally within C� house to be full cutoff) Luminaire scheduletja Catalog# coordinated with cut sheets4447;1////44p k_ Fixture quantity/types coordinated with (/�iIr..tso iD /�- ✓��" � quantity/types on lighting plan Pole height/mounting height (ARB) /1N-471 e l Colors/finishes (ARB) /5 /p Tilt (must be 0 for full cutoff) �'_ V" Fixture locations UP, Location conflicts with trees, utilities, etc. Coordination with other site plan sheets Shielding issues (freestanding signs, wall fixtures, etc.) Photometric plan L.4„... Adjacent zoning Property lines Excessive spillover /11 ° Excessive lighting levels (ARB) lettr4 . et tee oO/d- - U tie/, 3 Maintenance factor= 1.0 / Standard lighting notes: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire /JM and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-halffootcandle.