Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARB201800018 Checklist 2018-02-15
s. b .3 0 0• al 0 (14 Q d d Q d a) cs o ct o 0 0 >, 2 a x ° 8 R 0 Z Z ZZZ a e4, > Z ZZ a 0 44 0 ro c°)i1\,,‘ 0 p 0 W O sU. �. a Q ct U U p, a) a) N „ T., ) . O c. -o .101 til r, "o 0 0 0J0 p >, ° wo a fil c m` on Qaca) > a > Z � b per "" ° 0 ``' • - " - � � . Nba� ` � d 0 al N ° - o 1W 8 ' o o (E v • ro = ° N p . 0 oU A .4 T. z• d o � • ai U 4-4 bA p p. ) O s ^ � � = U0C V � _ d Q d , s a.) ) .= A t sG C.) a N O.. ' ° H0 N - - , > Z y r- o CO O• O 0 `a 0 -; U a) a) C o Q Y �A 0'3 O „ o ai o o O.� 'i r ' Q C 0Gs L1 G L ° a p �t4 r-+ W o 0 'C s. bM : g ya CAN >, � 0 ° O 3CA i o _. = o o (I.) 0.13 o +. 3- " ° nc ° c - o " o C Ay rZ )4 • U .� -0 VD 0 U o 0 ,-' i • "'' O 4+ d c c� a) UU 00 7 ) o a) � O y ^ O ° 7• a) 4-1• NH > co ,1^ s" 00s.• G .= e a O v vi N al v _ a) o 5a) Evi go-6 ct sg • =A A .� ) � O c0 0 O O C ,. yy> a nuZ >' 5 ° N Ca) s. G<+ C O Gq dc O� a V' s. o .. V-- O a? 3 et •^. = 0 = '0 0 . a) • .-s A a; ,N 0 -� R3 _ .D aj :.. '� 0 °? cn 0 Ll. U .^ ❑ U U 03 I•w N W d p . .� 0 = O r. a) p A t~ c b... A s r4 FA L1 y 0.) tJ 4" O o bA Q U .. ., a) a� U cd^d �+ Z O ? -8 o 0 4, oA;z c , e 1- $ 5 a TD 2 � o " ao U W c4 a , > ' -o ° o c '° *�- ai z U -o ,. .� , A . a) a) rA ' (4 -0 �, a Gz] a .2 5 a t o f, -b . a) a.- r g o d d CA v 0 V. = 4-0 g = 4: aQ 0 .. ' ' , •'v, a dUC) a) a-a 'FA ° c 3 EaNaq ZZdUC7 .o E a = = U ° .- ..oZda) c: . --Z a) F O a p a > •, a O Za OZ ' ''To a y �., 5 Cg4 °E-i.d EL) 0 w = . ....4‘ cia‘) d FOB • a4 i WWo T.1 � F � � x wz o F" O W O d d F W L. W c F Ep W © a r w CD � a U A A az H� E. 14 d Completeness Check for Signs� � G Project#/Name: l ail' I r g— i E —I d Date Received at County: Date Received in Design Planning: Date of Checklist Check: Assigned to/Date: FEES 3. ARB Review— Will the permanent sign(s)be constructed in an Entrance Corridor? (See the Entrance Corridor map in the Sign Permit Application packet for a list of Entrance Corridors.) ❑ Yes (This sign will be constructed in an Entrance Corridor and it does not meet the conditions of a $120.00 Comprehensive Sign Review. See ARB requirements next pages.) _ ❑ Yes (This sign will be constructed in an Entrance Corridor and it does meet the conditions of a Waive Fee Comprehensive Sign Review. See ARB requirements next pages.) ❑ No (This sign will not be constructed in an Entrance Corridor) $0.00 FEE TOTAL(Please add all the amounts checked in sections 1—3): $ FREESTANDING SIGNS A. Submittal Requirements ❑ Site plan or latest approved plat showing,to scale,the proposed location of the sign(s)with dimensions. ❑ Distance from th- ign to the property lines and/or edge of the VDOT right-of-way. ❑ If the sign will be loc. ed in an easement,a letter of approval from the easement holder will be required. A to-scale color illustration o e proposed si tl showin ❑ p P g ❑ Dimensions of the sign,inclu.'.. over. " height from the ground;cabinet size,length,width and depth;base size,etc. (Be sure to also include thes• • ensions on the diagrams provided in the Sign Permit Application packet.) ❑ Proposed lettering and/or graphi ei in t -'r proposed location. ❑ Entrance Corridor Requirement If the sign is : be constructed in an Entrance Corridor,also provide a color illustration of the front and side elevations of the sign 'owing: o If internally illuminated,ittd cate which areas of the sit' ! e opaque and which are illuminated.Internally illuminated cabinet sig must have opaque backgrounds.(•.;1 ue materials don't allow light to pass through. When lit only from behind,the color of an opaque material cannot .--.etected nor can objects be seen through it.) o Identification of prq osed materials and colors. Include standard color id numbers(Pantone,Benjamin Moore, Acrylic,etc.)for a materials,text,graphics,base,faces,trim caps,returns,etc. o Provide accurate physical samples of all colors proposed,preferably in the material proposed.(Paint chips that accurately reflect the proposed colors are acceptable.) o Provide a site plan showing proposed landscaping around the sign, including botanical names and planting sizes. o Additional submittal materials may be required if review by the Architectural Review Board is necessary.(The applicant will be notified if this requirement applies.) drib II II WALL SIGNS tp, drawing,to scale,showing dimensions of the sign(length,height,depth). ❑rElepllbn drawing(s)or modified photograph of the entire building,to scale and in color,showing zEr The sign lcf tion on the building,sign lotiglit above grade,and the lengttAhtfiging frontage. (Be sure to also include these dimensions on the diagrams provided in Appendix B) !/e Sign le ping a ing and/or graphics in their proposed location. 7 ntrance Corridor Requirements: If the sign is to be constructed in an Entrance Corridor also provide a color illustration of the front and side elevations of the sign showing: p Indication of sign typchannel letters,cabinet panel etc.). �Il 4 C/, g,„ Indicate on the drawings the proposed mauls and coil* Include standard color identification numbers V (Pantone,Benjamin Moore,Acrylic,etc._for all materidls,text,graphics, faces,trim caps,etc. For channel letter signs,indicate on the drawing that th ' color shall match the color of the wall to which the raceway is attached. o Provide accurae p ysical samples of all colors proposed in the sign,preferably in the material proposed.(Paint \-- chips that accurately reflect the proposed colors are acceptable.) Location of proposed light fixtures and manufacturer cut sheets describing illumination type,intensity,style,_ shielding,color,and height.All lighting must meet ordinance requirements as outlined in Sectionll/17..r �'►' "r o For internally illuminated signs,indicate which areas of the sign are opaque and which are minted. (Opaque materials don't allow light to pass through. When lit only Ion}bejvjjud,the color of an opaque material cannot be detected nor can objects be seen through it.) /�/J /'� ILLUMINATION REQUIREMENTS ` 1 ❑ T ocation of proposed light fixtures identified on a plan and/or elevation Manufacturer cut sheets describing illumination type,intensity,style,shielding,color, and height. All lighting must t. meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance. NOTES: