HomeMy WebLinkAboutARB201800019 Checklist 2018-02-15 a
3 1III
Hi
cis ci)
33 � o a. � Q QQQ � � cgs
o 00 >, o c.
x dd ° 0 o z z ZZZ .a 54. > Z ` ZZ a =
F" ti ai a) a , �= -d
W (2q - • ° 2 o.c a. a. o a a) ; o,, � �, `s ° �,
O 0.1 N to
p '� a) o u. 0 .zoo .' 0 4. o z o ' �) p, ° o
=1-1 4g• . 0 � 0cA `*' � 5b o oa 0 I : : I1 !' h
cn '> a a
Z 0 5 .0 5 o r) .c M Q a o a) i o 0 I
Cs.N� = ' >i ° c?.I,) p . a) C p Z ...
A y o a °' ao ci _ No on U N ° y °"a •° • . 2 � °- > > a)
0 za) a k -C7 O C d •d V .+ d V L .1 - • - . -d o
At UU z a� 'FA ° cdE. Na = Z dwc7sa ^ =
c) 0 .. . oZd .? N
W• z° oo °
o
Oo ^ `) •c N o ° 0 = = fin.',c1 ,.= \\ a) o egzs
3N uiiii
a) p O N o O •E 3 7z a) , U 0 .d o :. C C >, , 0 ^ cd s.b O y a N t) O r• ,; a) v• ^O
. � 3 O ° o ) .. �; v, v)A cd UO O4�
4. • •0 a 'o - ' z =
urz d a) 1 c 00 a X n b scf p O1o . z . 3 •d
r4 N .i ) y . C .= Na 0 E., C O
eaWs a ` ` 4i ;'
w � E
NA * az NNN al o -0 a y oo c> = c)a O C i W a) p ,00 y Q C . . .� y d
1-1 C p C 0O A O ' >,-4 - 'C Y.'
. a) O
�] �
Q .UW O a) ) v o ) c 4+• on z cd . o .° " -d o o . - r o .- 4 .ox aa «- p v,
cd o ) ° o:c 5 - ai.� c2 v b -
0 > r cn o ° O a. i o a) E •= 5 o a)
Q uectetetama .a 0 a' ° ? '- ) a '° 5 g o = 0 o s. = - •a c., - a) O
d UU ca, a) a. ai :v, .o ° o„ 5aNas ZZdUC7 Ea = ° o . .aZ 0cda ,
O x p a
° o 3cA
0 a � z
o �
a F L
. WwN d i LT Ezz o ° H� UMwc7H4.
� UU04A A H an
4
v� a •K0 - a
E-+
Completeness Check for Signs
Project#/Name: " 2CI r 'L�ki.AA ' '" ' A.4 CJ ck ael
Date Received at County:
Date Received in Design Planning:
Date of Checklist Check: Assigned to/Date:
FEES
3. ARB Review— Will the permanent sign(s)be constructed in an Entrance Corridor?
(See the Entrance Corridor map in the Sign Permit Application packet for a list of Entrance Corridors.)
❑ Yes (This sign will be constructed in an Entrance Corridor and it does not meet the conditions of a $120.00
Comprehensive Sign Review. See ARB requirements next pages.) �.
❑ Yes (This sign will be constructed in an Entrance Corridor and it does meet the conditions of a (Waive
aive Fee
Comprehensive Sign Review. See ARB requirements next pages.)
❑ No (This sign will not be constructed in an Entrance Corridor) $0.00
FEE TOTAL(Please add all the amounts checked in sections 1—3): $
FREESTANDING SIGNS
A. Submittal Requirements
❑ Site plan or latest approved plat showing,to scale,the proposed loc•tion of the sign(s)with dimensions.
❑ Distance from the sigthe property lines and/or edge of the VI)G T right-of-way.
❑ If the sign will be located in an easement,a letter of approval • am the easement holder will be required.
❑ A to-scale color illustration of th- .roposed sign showin.;
❑ Dimensions of the sign,includin_ overall height ••.m the ground;cabinet size,length,width and depth;base
size,etc. (Be sure to also include these •'mensions • the diagrams provided in the Sign Permit Application packet.)
❑ Proposed lettering and/or graphics in •eir •posed location.
❑ Entrance Corridor Requirements: If the sir.• to be constructed in an Entrance Corridor,also provide a color
illustration of the front and side elevations . the 'gn showing:
o If internally illuminated,indicate whi' areas o se sign are opaque and which are illuminated.Internally
illuminated cabinet signs must have opaque backgr• ds.(Opaque materials don't allow light to pass through.
When lit only from behind,the co .r of an opaque ma -rial cannot be detected nor can objects be seen through it.)
o Identification of proposed mat: gals and colors. Include . andard color id numbers(Pantone,Benjamin Moore,
Acrylic,etc.)for all material ext,graphics,base,faces,tr ' caps,returns,etc.
o Provide accurate physical .mples of all colors proposed,pre = .•ly in the material proposed.(Paint chips that
accurately reflect the pro osed colors are acceptable.)
o Provide a site plan sho ing proposed landscaping around the sign,including botanical names and planting sizes.
o Additional submittal materials may be required if review by the Architectural Review Board is necessary.(The
applicant will be notified if this requirement applies.)
C
WALL SIGNS
JD r A drawing,to scale,showing dim ions of the sign(length,height,depth).
JI--Elevdrawing(s)or modified photograph of the entire building,to scale and in color,showing
The sign to n on the building,sign heptSbove grade,and the length ofplittling frontage.(Be sure to also
include these dimensions on the diagrams provided in Appendix B.)
[Sign l ering and/or giatrgics in their proposed location.
❑ Entrance Corridor Requirements: If the sign is to be constructed in an Entrance Corridor also provide a color
illustration of the front and side elev ' ns of the sign showing:
Indication of sign type(ch nel le s,cab' et, ,•nel,etc.). frY,..0 6 1 V
o Indicate on the drawings the proposed Itif Is and c. . Include standard color identification numbers
(Pantone,Benjamin Moore,Acrylic,etc.) or all materia s,text,graphics,faces,trim caps,etc.For channel letter
signs,indicate on the drawing that the raceway color shall match the color of the wall to which the raceway is
attached. eiey A
Provide accurate physical samples of all colors proposed in the sign,preferably in the material proposed. (Paint
chips that accurately reflect the propos d colors are acceptable.)
t, o Location of proposed fight fix. es and manufacturer cut sheets describing illumination type, intensity,style,
4` shielding,color,and hei L All lighting must meet ordinance requirements as outlined in ection 4.17.
For internally illuminated signs, indicate which areas of the sign are opaque�ic are illuminated. (Opaque
materials don't allow light to pass through.When lit only from behind,the color of an opaque material cannot be
detected nor can objects be seen through it.)
ILLUMINATION REQUIREMENTS
e location of proposed light fixtures identified on a plan and/or elevation
❑ Manufacturer cut sheets describing illumination type,intensity,style,shielding,color,and height.All lighting must
meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance.
NOTES: