Loading...
HomeMy WebLinkAboutARB201800016 Review Comments 2018-02-07 Margaret Maliszewski From: Travis Peterson <tpeterson@chipman-design.com> Sent: Wednesday, February 07, 2018 1:03 PM To: Margaret Maliszewski Cc: Zorana Jovanovic Subject: Payment Booth at Chick-fil-A Pantops, VA Margaret, I am working with Zorana on the Payment Booth project for the Chick-fil-A at Pantops,VA. She is currently out of the office on a site visit, but forwarded me your email. Please see my responses to your questions below: 1. The fascia of the payment booth will also be Quaker Bronze to match the rest of the booth. It is called out to "Match Exterior Finish" on the Wall Section Detail on sheet 2 of 6 of the shop drawings. 2. The led strip light fixtures will be recessed to be flush with the soffit/fascia. 3. The HVAC unit and the electrical panel box will both be painted to be bronze to match the rest of the booth. Please let us know if there is anything else you require for your review. Thanks, Travis Peterson Senior Project Manager Chipman Design Architecture 1350 East Touhy Avenue First Floor East Des Plaines, IL 60018 T: 847.298.6900 F: 847.298.6966 tpeterson@chipman-desian.com www.chipman-design.com This electronic mail message is intended only for the person or entity to which it is addressed If you are not the intended recipient,please contact the sender by reply e-mail and destroy all copies of the original message Any attachments are proprietary in nature and may only be used for the specified project.Any use, other than for the stated architectural purposes within the recipient's organization,is not authorized. APlease consider the environment before printing this email. From: Margaret Maliszewski<mmaliszewski@albemarle.org> Sent: Wednesday, February 7, 2018 11:26 AM Subject: RE: FedEx Shipment 771327671278 Delivered To: Zorana Jovanovic<zoovanovic@chipman-design.com> Zorana, To approve this amendment for the ARB, I need confirmation on a few things: 1. The proposed exterior finish is bronze. a. I see from the shop drawings that the wall panels are bronze. I am not able to find the finish of the fascia. Can you confirm that it is to be bronze? 2. The light fixtures will be installed flush with the surface of the fascia. a. I can't find this in the drawings. Can you confirm? 1 i • 3. The HVAC unit will have a fli to match the surrounding wall. a. I can't find this in the drawings. Can you confirm? Thanks for your help. Margaret 2 Margaret Maliszewski From: Margaret Maliszewski Sent: Wednesday, February 07, 2018 11:26 AM To: 'Zorana Jovanovic' Subject: RE: FedEx Shipment 771327671278 Delivered Zorana, To approve this amendment for the ARB, I need confirmation on a few things: 1. The proposed exterior finish is bronze. a. I see from the shop drawings that the wall panels are bronze. I am not able to find the finish of the fascia. Can you confirm that it is to be bronze? 2. The light fixtures will be installed flush with the surface of the fascia. a. I can't find this in the drawings. Can you confirm? 3. The HVAC unit will have a finish to match the surrounding wall. a. I can't find this in the drawings. Can you confirm? Thanks for your help. Margaret From:Zorana Jovanovic [mailto:zjovanovic@chipman-design.com] Sent: Wednesday,January 31, 2018 3:48 PM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Subject: RE: FedEx Shipment 771327671278 Delivered Margaret, Please see attached are the shop drawings we have for the payment booth and let me know if this is good for your review, and we will send it overnight. Thank you, Zorana Jovanovic Project Manager Chipman Design Architecture 1350 East Touhy Avenue First Floor East Des Plaines, IL 60018 T: 847.298.6900 F: 847.298.6966 ziovanovic@chipman-design.com www.chipman-design.com This electronic mail message is intended only for the person or entity to which it is addressed.If you are not the intended recipient,please contact the sender by reply e-mail and destroy all copies of the original message.Any attachments are proprietary in nature and may only be used for the specified project.Any use, other than for the stated architectural purposes within the recipients organization,is not authorized APlease consider the environment before printing this email. From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent:Wednesday,January 31, 2018 2:41 PM 1 To:Zorana Jovanovic<zjovanovic@chipman-design.com> Subject: RE: FedEx Shipment 771327671278 Delivered Zora na, The LOR and ARB applications and the site plans were received, but there should have been architectural drawings accompanying the ARB application. I will need the architectural drawings to complete my review. Margaret From:Zorana Jovanovic [mailto:zjovanovic@chipman-design.com] Sent: Wednesday,January 31, 2018 12:45 PM To: Margaret Maliszewski <MMaliszewski@albemarle.org> Subject: FW: FedEx Shipment 771327671278 Delivered Margaret, Please see the email confirmation below. It says it was delivered on Friday 01/26. Thank you, Zorana Jovanovic Project Manager Chipman Design Architecture 1350 East Touhy Avenue First Floor East Des Plaines, IL 60018 T: 847.298.6900 F: 847.298.6966 zjovanovic@chipman-design.com www.chipman-design.com This electronic mail message is intended only for the person or entity to which it is addressed If you are not the intended recipient,please contact the sender by reply e-mail and destroy all copies of the original message.Any attachments are proprietary in nature and may only be used for the specified project Any use, other than for the stated architectural purposes within the recipient's organization,is not authorized. APlease consider the environment before printing this email. From:TrackingUpdates@fedex.com [mailto:TrackingUpdates@fedex.com] Sent: Friday,January 26, 2018 9:29 AM To: Zorana Jovanovic<zjovanovic@chipman-design.com> Subject: FedEx Shipment 771327671278 Delivered 2 • Your package has been delivered Tracking # 771327671278 Ship date: Delivery date: Thu, 1/25/2018 Fri, 1/26/2018 10:26 am Dave Carlson Margaret Maliszewski 103348951 Albemarle County Department Des Plaines, IL 60018 401 McIntire Rd Delivered CHARLOTTESVILLE, VA 22902 US Personalized Message 17-1723-01 Shipment Facts Our records indicate that the following package has been delivered. Tracking number: 771327671278 Status: Delivered: 01/26/2018 10:26 AM Signed for By: J.FRAZIER Reference: 17-1723-01 ZJ Tree Signed for by: J FRAZIER Delivery location: CHARLOTTESVILLE,VA Delivered to: Receptionist/Front Desk Service type: FedEx Priority Overnight Packaging type: FedEx Tube Number of pieces: 1 Weight: 5.00 lb Special handling/Services: Deliver Weekday Standard transit: 1/26/2018 by 12:00 pm This tracking update has been requested by: Company name: 103348951 Name: Dave Carlson Email: 'not provided by requestor' '1! -'1'''774. r Mr''.417,4r r l. '7,1771r,: 174"---1,"Zri ,--..,!`"f'''''-`• '',.a—"''`'-4':"1"'-'''''^ . ''' ' -- — ' . 3 • LJ Please do not respond to this message This email was sent from an unattended mail ox This report was generated at approximately 9.29 AM CST on 01/26/2018 At weights are estimated To track the latest status of your shipment click on the tracking number above This tracking update has been sent to you by FedEx on behalf of the Requestor.FedEx does not validate the authenticity of the requestor and does not validate,guarantee or warrant the authenticity of the request the requestor's message,or the accuracy of this tracking update Standard transit is the date and time the package is scheduled to be delivered by,based on the selected service,destination and ship date Limitations and exceptions may apply.Please see the FedEx Service Guide for terms and conditions of service. including the FedEx Money-Back Guarantee,or contact your FedEx Customer Support representative fr,D 2018 Federal Express Corporation.The content of this message is protected by copyright and trademark laws under U S and international law Review our privacy policy All rights reserved Thank you for your business 4