Loading...
HomeMy WebLinkAboutSDP201600059 Review Comments Initial Site Plan 2016-12-09Short Review Comments Report for: SDP201600059 SubApplication Type: Woolen Mills Light Industrial Park - Initial Initial Site Plan Date Completed:11/22/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:11/14/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated October 7, 2016. No comments or conditions. Note: Due to the proximity of exterior walls on Buildings 1 and 11 to a property line, all, or portions of those walls, must be of fire-rated construction. Division: Date Completed:11/20/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:Requested Changes Reviews Comments: Based on plans dated 10/10/16. 1. Fire flow test required before final approval, please attach a copy to the final plans. 2. Relocate the hydrant on Farish Road to the left side of the road prior to building 1. 3. Please check building codes to see if a sprinkler system is required for building 1. If a sprinkler is required please show FDC on Address side of structure and with in 100' of the hydrant. 4. Please add a note to the plans. "Knox boxes required on each building, contact Albemarle County Fire Marshal office for location. Due to the design with retaining walls two boxes maybe required on buildings 3, 4, and 5." Division: Date Completed:11/18/2016 Reviewer:Matthew Wentland CDD Engineering Review Status:Requested Changes Reviews Comments:Based on plans dated 10-7-16: 1. An approved WPO submittal and Floodplain Development Permit application will be required before the Final Site Plan can be approved. 2. Provide bumper blocks in areas where the parking is adjacent to sidewalk less than 6' wide. [18.4.12.16(e)] 3. Provide guardrail between the ends of travelways and retaining walls. 4. Storm sewer is not considered a public utility and is not allowed in preserved slopes unless there is no other alternative. Please provide justification for the location of the storm sewer to be reviewed by the Zoning Administrator and the Development Process Manager. Division: Date Completed:11/10/2016 Reviewer:Derek Bedarf CDD E911 Review Status:Requested Changes Reviews Comments: Division: Page:1 of 2 County of Albemarle Printed On:April 05, 2019 Date Completed:12/09/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments: Division: Page:2 of 2 County of Albemarle Printed On:April 05, 2019 COUNTY OF ALBEMARLE Department of Community Development • 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 November 22,2016 Mike Myers 172 South Pantops Drive, Suite A 220 East High Street Charlottesville,VA 22902 mmyers(a�dominioneng.com RE: SDP201600059 Woolen Mills Light Industrial Park—Initial Site Plan Dear Mr.Myers: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services(Planner) Albemarle County Engineering Services (Engineer) Albemarle County Information Services(E911) (attached) Albemarle County Building Inspections Albemarle County Architectural Review Board Albemarle County Department of Fire Rescue Albemarle County Service Authority Rivanna Water and Sewer Authority Virginia Department of Transportation(attached) Comments reflect information available at the time the proposal was reviewed and should not be considered final. However,the Site Review Committee has attempted to identify all issues that are required to be resolved prior to final approval.The applicant should work with each of the reviewers individually to address the comments provided. Once all of the comments have been addressed,the Lead Reviewer will request copies for final signature by each reviewer.Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, (:).. 4• Nu-ATI J.T.Newberry Senior Planner CC: Elemental Ecotech,LLC c/o Chris Donalson 809 Bolling Avenue,Unit C Charlottesville,VA 22902 donalsonconstrco@aol.com Albemarle County Planning Services(Planner)—J.T.Newberry,inewberry@albemarle.org 1. [General Comment]—On Sheet SP1,under the Project Narrative,please correct the name of Moores Creek Road to Moores Creek Lane under the"Access"description. 2. [Section 32.6.2(h)]—On Sheet SP1,please list the other Site Review Committee members under the signature block. 3. [Chapter 18, Section 27]—On Sheet SP2,under Site Data,please change the zoning district to"Light Industry"(LI). Please also add the zoning overlay districts: Flood Hazard(FH)and Steep Slopes (Managed and Preserved). 4. [Section 4.20(b)]—On Sheet SP2,under Site Data,please clarify that the front setback is 10' from the edge of the right-of-way. 5. [Section 26.5(c)]—It appears the curbing for Canal Street would require construction activity within the 30' required buffer.The Zoning Division will need to confirm if this encroachment represents "construction ac,but please revise or submit an application for a special exception. 6. [Section 4.20(b)]—On Sheet SP2,under Site Data,please add the stepback information from this section. Additionally,please add a note to specify which structures will be over 40 feet in height. It may be necessary to confirm with the Zoning Division whether or not the stepback regulations apply to certain structures. 7. [Section 32.5.2(b)]—On Sheet SP2,under Site Data,please revise the proposed use from"industrial park"to a use that falls under one of the categories listed in Section 26.Based on the narrative on Sheet SP1 and parking calculation,I expect the proposed use would be"Storage/Warehousing." 8. [General Comment]—On Sheet SP3,please accurately reflect the political boundary of the City and County. The right of way line for Franklin Street adjacent to TMP 77-40B is the City/County boundary line. 9. [Section 32.5.2(n)and Section 4.17]—Although Note 3 on Sheet SP5 indicates that no lighting above 3,000 lumens is planned at this time,a photometric plan may be necessary to confirm compliance with Section 4.17.4(b). Albemarle County Engineering Services (Engineer)—Matt Wentland,mwentland(aalbemarle.org 1. An approved WPO submittal and Floodplain Development Permit application will be required before the Final Site Plan can be approved. 2. Provide bumper blocks in areas where the parking is adjacent to sidewalk less than 6'wide. [18.4.12.16(e)] 3. Provide guardrail between the ends of travelways and retaining walls. 4. Storm sewer is not considered a public utility and is not allowed in preserved slopes unless there is no other alternative. Please provide justification for the location of the storm sewer to be reviewed by the Zoning Administrator and the Development Process Manager. Albemarle County Department of Fire Rescue—Robbie Gilmer,tgilmer@albemarle.org 1. Fire flow test required before final approval,please attach a copy to the final plans. 2. Relocate the hydrant on Farish Road to the left side of the road prior to building 1. 3. Please check building codes to see if a sprinkler system is required for building 1.If a sprinkler is required please show FDC on Address side of structure and with in 100'of the hydrant. 4. Please add a note to the plans. "Knox boxes required on each building,contact Albemarle County Fire Marshal office for location. Due to the design with retaining walls two boxes maybe required on buildings 3,4,and 5." Albemarle County Information Services(E911)—Derek Bedarf,dbedarf@albemarle.org—See attached Albemarle County Building Inspections,Jay Schlothauer,jschloth@,albemarle.org—No objection 1. No comments or conditions. Note: Due to the proximity of exterior walls on Buildings 1 and 11 to a property line,all,or portions of those walls,must be of fire-rated construction. Albemarle County Service Authority—Alex Morrison,amorrisonQi serviceauthority.org 1. Water/Sewer Construction Plan Review by the ACSA will be required at the final site plan stage. Submit 3 copies of the final plan along with water and sewer data sheets to the ACSA,Attn: Michael Vieira,PE,to begin the review. 2. Call out all water valves,fittings, etc. 3. Call out the water main sizes and material. 4. Call out the sewer main material. 5. Proposed retaining wall#11 is in conflict with proposed water and sewer. 6. Proposed retaining wall along the Moores Creek Lane entrance is in conflict with proposed water. 7. Proposed retaining wall#5 is in conflict with proposed water. 8. Proposed retaining wall#6 is in conflict with proposed sewer. 9. Proposed retaining wall#7 is in conflict with proposed water. 10. Due to the number and locations of retaining walls a looped water system within the development may not be practical. 11. Show water meters and sewer laterals for each building. 12. Will any building have sprinkler systems? 13. Is irrigation proposed on the site? 14. Is a fire flow test along Moores Creek Lane required? 15. Add water and sewer profiles. 16. City review and approval for the proposed sewer connection is required at the final site plan stage. Rivanna Water and Sewer Authority—Victoria Fort,vfort@u,rivanna.org,434-977-2970,ext.205 1. RWSA General Notes should be on the plans(see attached). 2. If the development is expected to produce over 40,000 gallons of sewage per day,a flow capacity certification from RWSA will be required prior to final site plan approval. 3. RWSA has serious concerns about the proposed access driveway off of Moores Creek Lane. There is significant truck traffic in and out of the RWSA Moores Creek Advanced Water Resource Recovery Facility(MCAWRRF)at the end of Moores Creek Lane as well as Carter's Bakery on Franklin Street.RWSA is concerned that the addition of a driveway so close to Franklin Street and with such a narrow turning radius may result in traffic interruptions and/or accidents at this location,with impacts extending out to Franklin Street. 4. All RWSA utilities within the scope of the project need to be shown on all sheets.This includes the two future meter vaults located on Broadway Street and Moores Creek Lane near their intersections with Franklin Street(see attached plan sheets) and the RWSA sanitary sewer main which runs parallel to Moores Creek Lane(see attached GIS map). Include utility size,material (if known), and ownership(RWSA). 5. All RWSA easements within the scope of the project need to be shown on all sheets.This includes water line easements at the two meter vault locations(see previous comment,Deed Book 4690,Pages 637-644,628-636),sewer easement over the RWSA sanitary sewer main (Deed Book 342,Pages 197-203),and the access easement shown on sheet SP3 (Deed Book 331 Page 549). 6. RWSA's contractor is currently scheduled to install the two meter vaults located on the property in early 2017. If there is any need to revise the vault locations to accommodate elements of the proposed site design,that will need to be determined in the next few weeks. I am unfortunately unable to attend the site review meeting;however,I would be happy to meet with the developer to discuss this and other concerns about the site. Sheet SP3: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above 2. Label RWSA manholes according to attached GIS Map(MCI-MH-03,-04). Sheet SP4: 1. RWSA will not allow a fence or other obstructions directly over or adjacent to the meter vault at • the corner of Franklin Street and Moores Creek Lane 2. See General Comment#3 above regarding the proposed access driveway off of Moores Creek Lane 3. RWSA would like to discuss with the applicant and the ACSA the option of installing an additional water valve at the tee/tap location on Moores Creek Lane.At present,there is no inline valve to isolate the section of ACSA water line through the MCAWRRF from the proposed development connection. 4. Show and label RWSA utilities and easements according to General Comments#4&#5 above Sheet SPS: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above Sheet SP7: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above Sheet SP8: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above 2. The depth of the RWSA sanitary sewer line at the crossing with the proposed new 36"HDPE storm drain will need to be shown on the storm sewer profile in the final site plan. Virginia Department of Transportation—Adam Moore,Adam.Moorena vdot.virginia.gov—See attached Rivanna Water & Sewer Authority (RWSA) General Water & Sanitary Sewer Notes Last Revised: April 2016 1. All materials and methods of construction shall comply with the latest version of the General Water and Sewer Design and Construction Standards—Version 1.0,adopted in December 2015, except as modified below or modified in special notes. 2. RWSA shall approve all construction materials and methods of construction. A preconstruction conference shall be held with RWSA prior to the start of any work. 3. The contractor shall be responsible for notifying Miss Utility(1-800-552-7001). 4. RWSA Engineer(Victoria Fort at(434) 977-2970 ext.205)shall be notified three business days prior to the start of construction. 5. All work is subject to inspection by RWSA staff. No tie-ins to the existing system shall be made without coordination with and the presence of RWSA staff. No work shall be conducted on RWSA facilities on weekends or holidays without special written permission from RWSA. 6. For sanitary sewer line construction: RWSA may require bypass pumping for tie-ins to the existing system. All doghouse manholes must be pressure-tested before a connection is made to the system. 7. The location of existing utilities as shown on the plans is from data available at the time of design and is not necessarily complete or accurate. The Contractor shall be responsible for the verification of the location,size and depth of all existing utilities,both surface and subsurface. The Contractor shall immediately notify the Engineer of any discrepancies between the plans and field conditions. The Contractor shall use due diligence to protect all utilities and structures from damage at all times,whether shown on the plans or not. Damage to any existing utilities shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 8. Erosion and sediment control facilities shall not be permitted in the RWSA easement without special written permission from RWSA. No grading shall be permitted in the RWSA easement unless permitted otherwise by RWSA in writing. 9. No blasting shall be permitted within 100 feet of RWSA facilities without written permission and RWSA approval of the blasting plan. Ground monitoring during blasting and a pre-blast survey may be required. For blasting within 100 feet of any operative RWSA sewerlines,bypass pumping and/or pre-and post-CCTV may be required. RWSA may also require certification from a licensed professional engineer stating that the proposed blasting will not damage any RWSA facilities. Damage to any utilities due to blasting shall be repaired by the Contractor to the original condition at no additional cost to the Owner. 10. The contractor shall observe minimum separation requirements for utility crossings. When a crossing is made under an existing facility,adequate structural support shall be provided for the existing pipe. The area of the crossing shall be backfilled with compacted 57 stone to the springline of the existing pipe. 11. New water main installations shall be pressure tested,chlorinated,flushed and have water samples approved prior to making any permanent connection to the public water system. Approved methods of filling and flushing new water mains will be required to prevent any contamination of the public water system. 12. All easements for new RWSA facilities shall be recorded prior to placing the new facilities into service. 13. No permanent structural facilities will be permitted in the RWSA easement. This includes building overhangs,retaining walls,footers for any structure,drainage structures, etc. 14. Trees are not permitted in the RWSA easement. • Toll.0'ees vat �EJ--= // ru amwefi4PowO wort co ¢nw • II �' / (na arnx Fu sl �'� ( .Cr'J. ` I wiwc Rrrsx / _ �� •TaPNHr S¢Ert '�PMSL�� `Lfl4 *4 t r 'p•ssm man 7 RPCZ / " YYY" tl • My f ! C 4, !` 9 'yw d �f�,t . l&A" a _ IL'\ "h `s I ¢m>.igx u.O8.0: Ail A ^ BRO 5ET ▪ , 5� s+t�,4 y ! '� 2 r r i� "'c `'��aT' f SWAY SIRE • ' < .. w�T.L .�� y .fx4T et I ROUTE 1115 OWNERSHIPTO MAP 'I• NOT SCALE .r 'T.F' `�" 1 Y' S.tx• (X, c`� ROD.r Or+/M `"yam �.�.. / MIS I e•SKEET ewRtC LSiI*/v7LF FRI 2. CGNRACICR SISALS CELAN i CORM WITH ALL¢GLTPEKxry OI ITE PION LAPO D2 • qL�-Y> r ` �T' TA.WR S. CONTRACTOR omma SMALL IT/IL o N T 6 ¢R Ix ND m T PAVED ELT Pi t; i jj'IAA'R!— 6 Tr 1]l O YD comma SWAM PIT/IL D sIRLT W IR LL A E mama 4E VED AREAS ALA SHOWN ON y 1 `D°ar DRAWINGS PITH N ASIMLLT SURFACE COURSE t- 1 r•25 afGRPC MC A SON9ACNC SNAIL RESTORE AIL p'T.RFFD CRASS AREAS PICM S®N LOCOMANCC / )/ / C I eL9P rtun \2aSA IC SV) SOON mow C29200 OF DE PROJECT all.. 2`.1/ J. / j STA..MCIO++ PMP.fERML'EM S. SON9KFR SHALL Cowman imp uAq sIDTWwR CM¢WICr VALVE CLOSURES) `O `/ ! 1 e—1/r PCS CRSA FA3IYPT FOR BAUR RxM.FRIAOINTS OHCSIAS CM CTRA00.LII6NW. .` • F. ALL HATER RTO uN a AINTRP[F OF I FOOT ]. A.0 Co CIOR TO EUS7 BLOCK C 4IS NUY OF S Tot I FOOT r FROM NTNO EPIC EE /EIE `� C L o VAULw SKEET 'CwEI[THRUR PIGr Is IJOD E$FO 4S CA I CAE Or m[CAS VxN NOr®E H ` 2" ,/ Enw..DARE FOOT OF IARM/sTOAI DUST•SWND DTl1VC CAS u•W. 0� Q• , s¢D[RL SIRE¢DI Cu:a -WC(19J AWAY CC LIC (m rss'rnzsul VICINITY MAP i SCALE: I'=500' PLAN SCAM T•=10' 8" WATER MAIN PRf)FII P 400 I I yAmig 2Z2 4 aW 3 y° <DD g `6 Cj ?- I1I ax s .% _ 6-e seD E..1R et E F.DA•. nO - Earl D,..A.353- 0 S,I: Sporn Sm A'u L.CHIASAxO 1 -I Y ulx. Ex Ore.EI!.,Hs.SZIJE1 SI\\ r.rlr+Ana — Eea f5A ogee Over „-� }\ '� 1 Proµ'Aw1 r seD Ia•.a.eI�L9+cs�); c I + � ` 0 11 s emu[ .l+.�c •T]rv, ; 'S5.9= a.151Ej IOW vn I VAS TBNi-SSI.TT Ft MAN I SAO sW 42 ILFI) 230 IE ,� 8 A : eAm Y I ESD 0 PROFILE • SCALER I'=IU' Han. 1'=10'ved. + yy.9, mar,_, RNANNA WATER AND SEWER AVIHDRIIY pFANSL WATa L'DSER'IXATT HOIIIIL' amwRl Raker mmrnAHiom),Inc. T'R �,n AS SWAN WHOLESALE 1�TERMO PROGRAM R�vANN81 aa xD Aara"aNT Michael Baker 29 m.A,RAPE SAN CO o- M ,.SVE;md mIl Ifni.,Safi*. COO 23tu p SEn NHS Rae CS -�—` (uDnztr,D I N T E R N A T I O N A L Fa� pS7)43-am p`1p�b�r ..m ETMR'•D WADLES neauTINIIIITld �FI/...aaleordcam LB •Ns METER LOCATION 08 PUN AND PROFILE w2 n AMiwx - ....p m CN II lva,J • // y 2I f. to Oa4' 4\`- i 0 L OM 40R a 116t wEET) Ma MR PE PU) // xe TAPPING R3® • SM Gass _tot a c r e m eENe / sYP4s Q ` .mvp/y • Th. (\� oL xa. i E A/ „ / na'xe rviux i'R' •rex' \ (cHmro • / aLA` xh 'row�YP�� A sa RirYL wiwr DI 9WNERSHIP MAP �• ® vAr ' N01 ID SCALE NM WORK fripPrOA aaaCCC � 13WORK auHwEs: a are LL W,i L��® y� 1 nEY0.DN OF serswa uwmaax0 MIMES AMMNAim SL4D w]m ers(0). ` �'pAm' ® f 5. EXCAVATED.WEN NOCAM3 M DRUMM ]NE mMYCIW SHALL YPRn ESE ,p�V�HA -..� + s. SCAR LOCATION.SZE..TALE MO(NUM ALL SUBSURFACE MOM mORE Illiii V of•Y/Y $ 3. COCOMPACEOP SNAIL WAN N MOLT VAN ALL REOUR]ENR Or ME vow um LR[ or ART OF INTALLMONLe � � / Y O pEaHA1 <•'IDRIIE :it Z. ADOMFAC000.MALL!ESTOP*pant MAR[WY NOM M PAYED ARIAS M JfrOr } A A NELO F.`.T ON Ow�Lsi m14 MAIL 11r AV SKEET MS SWmACE PALL .o OVERLAY wnRE.ARw simNM / . 1°\• —"tiff OE¢•/ ('( II III CV A CONvni ETOR o3rA LORE STOREOF Alt &STU wx MAX MAR mx SEM N AaOROME )rL+ \Ri,/�' a\ .�? e•-, ,/11'f awo Q s coNMAL:OR SOIL CouNNAR MMEA WIN EWIWxNS pawn VLLM CLOSURES) C- /fy t :D '. 'PAYwuN. O Fos Tf-0INS MIw EASE ACV..AND CRY OF C,46aRMALLE E �� s16 M� \` rp7CN/.wry II 6. ALL rant WN mxrs NULL IN RESERVED. /I\U v. NmxuY Rs]PRESSURE We LOCATION W Is 31RE Pa _ 'f � \ F F ' NccnES WEw e. WanticwR TO Yuma TRAFFIC wawa COI6RLCERI N ACOHMwCE ism MOT 4LP tttYYY y;WASIElw S. CONTRACTOR.AMOCO 01 PDSISI UNEE CENANCE Of LOSURE STORAGE MI AU. PROS TO ANY LANE r CM \ 1MA m CLOSURES.VESICLE AGCm vast a wmuxm AT au was.aduowi Haw ICFym O 51RET i. , J 4�YL \\ many WYYEMLLL TRIM I CIMM Al A M HMI DGm-Ma ORM Or S 3( Erfi. o]•'�"'RE F .1r� COOT. W CAN VNIS IEMPOMY women OR Ma RAM As' M (D4>�•$0 33) `\ \N _ 10.COMMOTION.ar mLmu Dr wR'AND MAMMA Posh.V IMMURE DORM yICINITY MAP X.SMALL R N310®TO PMCONSRUCTON COMMIX ELAN ICINI Y MAP SCALE:r=10' 8a WATER MAIN PROFII F 370 up — Ip141rt- 'dfl______1 1 II s I I II_ ` Mx_ Paw rN 350 HID +. _ �.33IDS✓_ N� cr.. PWF ESl1i.S1 Isvo .. 3mxs AOr —I I _ - I n I a _ I r" g]f0 I - I -.-2 z I 1 3W PROFILE SCALE 1•WILS Hai. t SIRE'VeH. 1—- y I~ =E D_YN. ..i.n. RNMIA WRIER AND SEWER.AUIHORIIY R pw'V�' ®ALMu vA® kO cw II D rov ry meeeeL Bak N omRaou 4 mN. . • m '°YMx WHOLESALE NEIEPoNC PROGRAM M _ • '• OURWlMW.[YBCWAf1m HTE 2 B�ICA rm.Rmronw MORS9=� SEPT 2515 . - O - , 1w)N]r-ifm IMiERXAiIOpAI 10smm °+O� m"'Inc wimats WXEMGR /...mwwumn q�, m_ �'°A AMIER IACATON O3 PUN AK PROFILE Ne. Pm ot mum amen m-CM_ M HAM-Peas , -. 35 Jam,/ - , /1 \ - 77-40L� 66-43 ✓ p / BROgow p 77 40K Ple EE ��/ 11 56-43 G '9---.% 0�� A \-%\\\CI 0 / 77 OM El 56-87.1 //2 - V 77-40C1 te a!" 77-406 ^^ __ O r, 0 77-40N \l 7Y-4o 0 ',:'!:MCI=MHe05 \ •D - ti bow 0 4.Fs • MCI-MH-03'it,: �/ ti Q. • • \ COMCI-MH 02 7-40A O / • MCR-MH-01 r_ r r F MCWWPS 01 LJ n K., r N Z • - ,3:d : MCR-MH-02 \ !\ 77-21 '.`.4 \.. 77-386 ��t \ t .€MCR-MH-03 1 Of i Created by: VF Rivanna Water and Sewer Authority 1 Date: 11/22/2016 695 Moores Creek Ln,Charlottesville,VA 22902 RivA"NA RWSA Sanitary 434)977-2970 www.rivanna.org Sewer Mains on Map data is provided by the RWSA, Albemarle WATER&SEWER AU7R0Rli7 a TMP 77-40 40B 1 inch = 150 feet County GDS,City of Charlottesville,ACSA,UVA Feet FM,and VGIN, Duplication of this data without 0 75 150 300 RWSA Engineering Department permission is prohibited. t •; .r F COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange,Road Culpeper,Virginia 22701 Charles A.Kilpatrick,P.E. Commissioner November 18, 2016 County of Albemarle Department of Community Development • 401 McIntire Road Charlottesville, VA 22902 Attn: J.T. Newberry Re: Woolen Mills Light Industrial Park- Initial site plan SDP-2016-00059 Review#1 . Dear Mr. Newberry: The Department of Transportation,Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Dominion Engineering,dated October 07,2016,offers the following comments: , Land Use 1. Please show mill and overlay on plans in accordance with WP-2. 2. The mill and overlay will require work to centerline,so flagging operation will be necessary. Please note that the final site plan must show conformance with the VDOT Road Design . Manual Appendices B (1)and F, as well as any other applicable standards, regulations,or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process Sincerely th,AA., Adam J. Moore, S.E. Area Land Use Engineer Charlottesville Residency COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 November 21, 2016 s fmc ` ; Mike Myers 172 South Pantops Drive, Suite A {� � d 4-d ,l?it 220 East High Street J°�"' .t �- •�e. Charlottesville,VA 22902 - t,,,. Ati.4 a Q,,s,4 mmyers@dominioneng.com RE: SDP201600059 Woolen Mills Light Industrial Park—Initial Site Plan — Dear Mr.Myers: gP'-rs^kl The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services(Planner) Albemarle County Engineering Services(Engineer) Albemarle County Information Services(E911)(attached) Albemarle County Building Inspections Albemarle County Architectural Review Board Albemarle County Department of Fire Rescue Albemarle County Service Authority Rivanna Water and Sewer Authority Virginia Department of Transportation(attached) Comments reflect information available at the time the proposal was reviewed and should not be considered final. However,the Site Review Committee has attempted to identify all issues that are required to be resolved prior to final approval.The applicant should work with each of the reviewers individually to address the comments provided. Once all of the comments have been addressed,the Lead Reviewer will request copies for final signature by each reviewer. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, ,4• NAA47- J.T.Newberry Senior Planner CC: Elemental Ecotech, LLC c/o Chris Donalson 809 Bolling Avenue,Unit C Charlottesville,VA 22902 donal sonconstrco(a,aol.com r Albemarle County Planning Services(Planner)—J.T.Newberry,jnewberry(alalbemarle.org 4 1. [General Comment]—On Sheet SP1,under the Project Narrative,please correct the name of Moores Creek Road to Moores Creek Lane under the"Access"description. 2. [Section 32.6.2(h)]—On Sheet SP1,please list the other Site Review Committee members under the signature block. 3. [Chapter 18,Section 27]—On Sheet SP2,under Site Data,please change the zoning district to"Light Industry"(LI).Please also add the zoning overlay districts:Flood Hazard(FH)and Steep Slopes (Managed and Preserved). 4. [Section 4.20(b)]—On Sheet SP2,under Site Data,please clarify that the front setback is 10' from the edge of the right-of-way. 5. [Section 26.5(c)]—It appears the curbing for Canal Street would require construction activity within the 30' required buffer.The Zoning Division will need to confirm if this encroachment represents "construction ac,but please revise or submit an application for a special exception. 6. [Section 4.20(b)]—On Sheet SP2,under Site Data,pse add the stepback information from this (\+ A' section.Additionally,please add a note to specify which structures will be over 40 feet in height.It s.�l4bccc,k�f may be necessary to confirm with the Zoning Division whether or not the stepback regulations apply s 1-cf.6 ‘ to certain structures. Alvf kA 7. [Section 32.5.2(b)]—On Sheet SP2,under Site Data,please revise the proposed use from"industrial park"to a use that falls under one of the categories listed in Section 26.Based on the narrative on ko^r�1. Sheet SP1 and parking calculation,I expect the proposed use would be"Storage/Warehousing." 8. [General Comment]—On Sheet SP3,please accurately reflect the political boundary of the City and County.The right of way line for Franklin Street adjacent to TMP 77-40B is the City/County boundary line. 9. [Section 32.5.2(n)and Section 4.17]—Although Note 3 on Sheet SP5 indicates that no lighting above 3,000 lumens is planned at this time,a photometric plan may be necessary to confirm compliance with Section 4.17.4(b). Albemarle County Engineering Services(Engineer)—Matt Wentland,mwentland(a,albemarle.org 1. An approved WPO submittal and Floodplain Development Permit application will be required before the Final Site Plan can be approved. 2. Provide bumper blocks in areas where the parking is adjacent to sidewalk less than 6'wide. [18.4.12.16(e)] 3. Provide guardrail between the ends of travelways and retaining walls. 4. Storm sewer is not considered a public utility and is not allowed in preserved slopes unless there is no other alternative.Please provide justification for the location of the storm sewer to be reviewed by the Zoning Administrator and the Development Process Manager. Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmer( albemarle.org 1. Fire flow test required before final approval,please attach a copy to the final plans. 2. Relocate the hydrant on Farish Road to the left side of the road prior to building 1. 3. Please check building codes to see if a sprinkler system is required for building 1.If a sprinkler is required please show FDC on Address side of structure and with in 100'of the hydrant. 4. Please add a note to the plans. "Knox boxes required on each building,contact Albemarle County Fire Marshal office for location.Due to the design with retaining walls two boxes maybe required on buildings 3,4,and 5." Albemarle County Information Services(E911)—Derek Bedarf,dbedarf(a,albemarle.org No objection Albemarle County Building Inspections,Jay Schlothauer,jschloth@albemarle.org—No objection 1. No comments or conditions. Note: Due to the proximity of exterior walls on Buildings 1 and 11 to a property line, all, or portions of those walls,must be of fire-rated construction. Albemarle County Service Authority—Alex Morrison,aorrison@,serviceauthority.org 1. . Water/Sewer Construction Plan Review by the ACSA will be required at the final site plan stage. Submit 3 copies of the fmal plan along with water and sewer data sheets to the ACSA,Attn: Michael Vieira,PE,to begin the review. 2. Call out all water valves,fittings, etc. 3. Call out the water main sizes and material. 4. Call out the sewer main material. 5. Proposed retaining wall#11 is in conflict with proposed water and sewer. 6. Proposed retaining wall along the Moores Creek Lane entrance is in conflict with proposed water. 7. Proposed retaining wall#5 is in conflict with proposed water. 8. Proposed retaining wall#6 is in conflict with proposed sewer. 9. Proposed retaining wall#7 is in conflict with proposed water. 10. Due to the number and locations of retaining walls a looped water system within the development may not be practical. "' ..- - 11. Show water meters and sewer laterals for each building. 12. Will any building have sprinkler systems? 13. Is irrigation proposed on the site? "" 14. Is a fire flow test along Moores Creek Lane required? 15. Add water and sewer profiles. 16. City review and approval for the proposed sewer connection is required at the final site plan stage. Rivanna Water and Sewer Authority—Victoria Fort,vfortna,rivanna.org 1. RWSA General Notes should be on the plans(see attached). 2. If the development is expected to produce over 40,000 gallons of sewage per day,a flow capacity certification from RWSA will be required prior to final site plan approval: 3. RWSA has serious concerns about the proposed access driveway off of Moores Creek Lane. There is significant truck traffic in and out of the RWSA Moores Creek Advanced Water Resource Recovery Facility(MCAWRRF)at the end of Moores Creek Lane as well as Carter's Bakery on Franklin Street.RWSA is concerned that the addition of a driveway so close to Franklin Street and with such a narrow turning radius may result in traffic interruptions and/or accidents at this location,with impacts extending out to Franklin Street. 4. All RWSA utilities within the scope of the project need to be shown on all sheets.This includes the two future meter vaults located on Broadway Street and Moores Creek Lane near their intersections with Franklin Street(see attached plan sheets)and the RWSA sanitary sewer main which runs parallel to Moores Creek Lane(see attached GIS map). Include utility size,material (if known),and ownership(RWSA). 5. All RWSA easements within the scope of the project need to be shown on all sheets.This includes water line easements at the two meter vault locations(see previous comment,Deed Book 4690,Pages 637-644, 628-636), sewer easement over the RWSA sanitary sewer main (Deed Book 342,Pages 197-203),and the access easement shown on sheet SP3-(Deed Book 331 Page 549). 6. RWSA's contractor is currently scheduled to install the two meter vaults located on the property in early 2017. If there is any need to revise the vault locations to accommodate elements of the proposed site design,that will need to be determined in the next few weeks. I am unfortunately unable to attend the site review meeting;however,I would be happy to meet with the developer to discuss this and other concerns about the site. Sheet SP3: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above 2. Label RWSA manholes according to attached GIS Map(MCI-MH-03; -04). Sheet SP4: 1. RWSA will not allow a fence or other obstructions directly over or adjacent to the meter vault at the corner of Franklin Street and Moores Creek Lane r 2. See General Comment#3 above regarding the proposed access driveway off of Moores Creek Lane 3. RWSA would like to discuss with the applicant and the ACSA the option of installing an additional water valve at the tee/tap location on Moores Creek Lane.At present,there is no inline valve to isolate the section of ACSA water line through the MCAWRRF from the proposed development connection. 4. Show and label RWSA utilities and easements according to General Comments#4&#5 above Sheet SP5: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above Sheet SP7: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above Sheet SPS: 1. Show and label RWSA utilities and easements according to General Comments#4&#5 above 2. The depth of the RWSA sanitary sewer line at the crossing with the proposed new 36"HDPE storm drain will need to be shown on the storm sewer profile in the final site plan. Virginia Department of Transportation-Adam Moore,Adam.Moorenn,vdot.virginia.gov—See attached