Loading...
HomeMy WebLinkAboutARB201800005 Application 2018-01-04 , ` # 96 €� , Albemarle Co 7 � Development Department McIntire G �' ;force:r,434)296-5832 Fax: (434)972-4126 .. ..j Planning Application PARCEL/_OWNER INFORMATION ThIP 056A2-01-00-02900 Owner(s): CROZET CENTER PARTNERS LLC Application# ARB2OI$00005 PROPERTY INFORMATION ACREAGE Legal Description CROZET SHOPPING CENTER .A. Magisterial Di=t White Hall El Land Use Primary Commercial Current AFC; Not in A/F District + Current Zoning Primary' Downtown Crozet District _-. APPLICATION INFORMATION Street Address 5764 THREE NOTCH'D RD CROZET,22932 Entered By Application Type Architectural Review Board Jennirer Smith�cl L__! i 1.3;2018 Project DOLLAR GENERAL - SIGN REFACING Received Date 01/04/18 Feceised Date Final C Submittal Date 01/08/18 Total Fees Closing File Date Submittal Date Final Total Paid Revision Number I I — Comments Legal Ad SUB APPLICATION(s) Type Sub Applicatio Comment SIGN 01/08/18/ /18 APPLICANT /CONTACT INFORMATION CortactType Narne Address CityState Zip I Phones ' PhorteCeil I >,^ r 4c.tec3rd CROZET CENTER PARTNERS LLC P 0 BOX 610 AAyNESBORO V.4, 225E0 PrimeCr :=a ' BETH ROBINSON - HIGHTECH SIGNS 2165 SEMINOLE TRAIL CH4RLOTTESCILL 22901 4349747900 Signature of Contractor or Authorized Agent Date • Application and Checklist for Sign Permit Part A: Applicant and Parcel Information Project Name: Do i I C.r Ei c ri e Y'a Address: S7+2 3 N.)o 1-Gh-e d 12_ci Ct czet Tax map and parcel(s): 05(D el 2-- el -CC- 02900 Zoning: v:);I-{Gic Croz-e+ Contact Person(Who should we call/write concerning this project?): 't't i()n I PC j" ci / P)Y Address 2 ((,)SSelY);n0(e, Trci Cityc s V�v 1 Lcfie5 V 11(C' State viq Zip 229{.) Daytime Phone( )974-7'j DC x-I05 Fax#( ) ]4-- (089 6 E-mail b Owner of Record: Caaze+ Cen+er Pet r-.{-i7e r.S 1-11-- Address F.0. 'j o x (9 I O City (ADcky YE S b C YC State V Pi Zip Z2-9 0 Daytime Phone( ) Fax#( ) E-mail Contractor Name/Business Name: -{-' Ch}�e-i 5 t•c)O S Address 2-I l0 5 Se rn.r1 o 112, tat: City JC V r l,&fltSV State VA Zip 22571 O Daytime Phone( ) '1 7`1- -19 00 Fax#( ) 9 74-1i*9 F E-mail 1-i'-sarck. rn Part B: Determining application requirements and fees 1. Sign Permit-Please indicate which sign type you are applying for: ❑ Freestanding or Monument Sign: $91.64 p If a footing is required,an additional fee is required: $32.64 Wall Sign(Including property,awning,fuel pump canopy signs): $91.64 lAr Sign Refacing: Fr€es+ ,n 1 $59.00 2. Electrical Permit-Will the sign be tluminated? Yes (Illuminated signs require an electrical permit and an electrical schematic) $48.96 ❑ No $ 0.00 3. ARB Review-Will the permanent sign(s)be constructed in an Entrance Corridor? (See the Entrance Corridor map in the Sign Permit Application packet for a list of Entrance Corridors.) L Yes (This sign will be constructed in an Entrance Corridor and it does not meet the conditions of a $129.00 Comprehensive Sign Review See ARB requirements next pages) El Yes (This sign will be constructed in an Entrance Corridor and it does meet the conditions of a Waive Fee Comprehensive Sign Review. See ARB requirements next pages.) ❑ No (This sign will not be constructed in an Entrance Corridor) $0.00 FEE TOTAL (Please add all the amounts checked in sections 1-3): $ — FOR OFFICE USE ONLY BP 9/ - (/;) ARB# Fee Amount$ 5C1 Date Paid By who? Weceipt Check# 11,C By aS- County of Albemarle Departm n ICtommunity Development 401 McIntire Road Charlottesville,VA 22902 Voice: (434)296-5832 Fax: (434)9724126 11/1/2015 Page 1 of4 • • Part C: Submittal Items Required Noe: Submittal packages must contain 4 collated copies of all information unless otherwise indicatrrl Additional submittal materials may be required if review by the Architectural,Review Board is necessary. Applicants will be notified if additional materials or ARB review are required. SECTION 1: FREESTANDING, SUBDIVISION OR DIRECTORY SIGNS A. Submittal Requirements ❑ Site plan or latest approved plat showing,to scale,the proposed location of the sign(s)with dimensions. ❑ Distance from the sign to the property lines and/or edge of the VDOT right-of-way. ❑ A footing/foundation diagram showing how the base or pole will be anchored in the ground. ❑ If the sign will be located in an easement,a letter of approval from the easement holder will be required. ❑ A to-scale color illustration of the proposed sign showing ❑ Dimensions of the sign,including overall height from the ground;cabinet size, length,width and depth;base ' size,etc. (Be sure to also include these dimensions on the diagrams provided in the Sign Permit Application packet) ;II' Proposed lettering and/or graphics in their proposed location. Entrance Corridor Requirements:if the sign is to be constructed in an Entrance Corridor,also provide a color illustration of the front and side elevations of the sign showing: o If internally illuminated,indicate which areas of the sign are opaque and which are illuminated.Internally illuminated cabinet signs must have opaque backgrounds.(Opaque materials don't allow light to pass through. When lit only from behind,the color of an opaque material cannot be detected nor can objects be seen through it.) o identification of proposed materials and colors. Include standard color id numbers(Pantone,Benjamin Moore, Acrylic,etc.)for all materials,text,graphics,base,faces,trim caps,returns,etc. o Provide accurate physical samples of all colors proposed,preferably in the material proposed. (Paint chips that accurately reflect the proposed colors are acceptable.) o Provide a site plan showing proposed landscaping around the sign,including botanical names and planting sizes. o Additional submittal materials may be required if review by the Architectural Review Board is necessary. (The applicant will be notified if this requirement applies.) B. Inspection Requirements for Freestanding,Subdivision or Directory Signs ❑ Applicant must mark the location of the property lines and the location of the sign with stakes in preparation for a preliminary zoning inspection. (All four corners of the sign must be marked with stakes that are easily visible to all inspectors.) ❑ A preliminary zoning inspection must be completed to verify the location of the sign before the permit can be issued. ❑ Freestanding signs are required to have footing inspections. (scheduled by applicant) ❑ Freestanding signs are required to have electrical inspections if illuminated. (.scheduled by applicant) ❑ Freestanding signs are required to have final building and zoning inspections. (scheduled by applicant) 1 1/1/2015 Page 2 of 4 • to SECTION 2: WALL SIGNS A. Submittal Requirements drawing,to scale,showing dimensions of the sign(length,height,depth). Elev tion drawing(s)or modified photograph of the entire building,to scale and in color, h showing The sign location on the building,sign height above grade,and the length of building frontage.(Be sure to also .nclude these dimensions on the diagrams provided in Appendix B) Sign lettering and/or graphics in their proposed location. Entrance Corridor Requirements: If the sign is to be constructed in an Entrance Corridor also provide a color illustration of the front and side elevations of the sign showing: o Indication of sign type(channel letters,cabinet,panel,etc.). o Indicate on the drawings the proposed materials and colors. Include standard color identification numbers (Pantone,Benjamin Moore,Acrylic,etc.)for all materials,text,graphics,faces,trim caps,etc.For channel letter signs,indicate on the drawing that the raceway color shall match the color of the wall to which the raceway is attached. o Provide accurate physical samples of all colors proposed in the sign,preferably in the material proposed.(Paint chips that accurately reflect the proposed colors are acceptable.) o Location of proposed light fixtures and manufacturer cut sheets describing illumination type,intensity,style, shielding,color,and height.All lighting must meet ordinance requirements as outlined in Section 4.17. o For internally illuminated signs,indicate which areas of the sign are opaque and which are illuminated. (Opaque materials don't allow light to pass through.When lit only from behind,the color of an opaque material cannot be detected nor can objects be seen through it. Internally illuminated cabinets must have opaque backgrounds.) B. ,Inspection Requirements for Wall or Projecting Signs all and projecting signs are required to have electrical inspections if illuminated.(Scheduled by applicant) Wall and projecting signs are required to have final building and zoning inspections. (Scheduled by applicant) SECTION 3:ILLUNIINATION REQUIREMENTS A. If the proposed sign is to be illuminated,the applicant must provide the following: eelectrical permit lectrical schematic ❑ The location of proposed light fixtures identified on a plan and/or elevation ❑ Manufacturer cut sheets describing illumination type, intensity,style,shielding,color, and height.All lighting must meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance. SECTION 4: WORK VALUATION 11/1/20I5 Page 3 of4 • A. Work Valuation • 75 co Part D: Applicant Agreement Applicant must read and sign • Each application package must contain 4 folded copies of all plans and documents being submitted. Only 1 set of material/color samples is required All submittal items become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies in their own files. • The application package is not complete without this checklist,completed,signed,and included with the required submittal materials indicated on the checklist I hereby cert01 that the information provided on this application and accompanying information is accurate, true and correct to the best of my knowledge and belief and contains all information required by these checklists t1 • 3 Signature I of person completing checklist Date kh 1Z°\SI t)r) I Pe6,ec_: - 1Yl �. (+3+)`'V7 - ce x. 1 I Z Printed Name/Title Daytime phone number of Signatory County of Albemarle Department of Community Development 401 Mclntire Road,North Wing,Charlottesville,VA 22902-4596 (434)296-5832 Tel,(434)972-4126 Fax www.albcmarle.org 11/1/2015 Page 4 of 4