HomeMy WebLinkAboutSUB201800098 Review Comments Final Plat 2019-04-08of aL��
4if tom--�
,E7r'
IRGII3I�
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434-296-5832
Fax 434-972-4126
Memorandum
To: Kris Winters (kwinters@roudabush.com)
From: Paty Saternye, Senior Planner
Division: Planning
Date: Final: August 1, 2018
FINAL UPDATE: November 27, 2018 (Still based on 6/4/18 submission but updated
for the approval of Variation #53, 54 & 55)
Rev. 1: February 27, 2019
Rev. 2: April 8, 2019
Subject: SUB 201800098 Belvedere Phase 11B — Final Subdivision Plan
The County of Albemarle Planning Division will recommend approval of the plat referenced above once the
following comments have been satisfactorily addressed (The following comments are those that have been
identified at this time. Additional comments or conditions may be added or eliminated based on further review.):
[Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless
otherwise specified.]
Conditions of Preliminary Plat Approval (from letter dated 8/4/16):
14. [COD] Two different sections have been provided for Belvedere Blvd. One of them is adjacent to the
Village Green and has a median. The other is farther away from the Village Green and does not have a
median. Although the ZMA drawings do show the median ending just past the Village Green, neither of
these road sections match those that are provided in the COD. Also, the plan views of Belvedere Blvd do
not match the two street sections provided for it. Work with Engineering, Fire/Rescue, and VDOT to
establish approvable road widths and road sections and ensure that the road sections match the roads
shown in the plan views. Any differences from the COD, other than an increased in pavement width to
satisfy comments from the SRC reviewer, must be approved through a variation. Also, see comment # 16
below.
Final: Comment not fully addressed. Address the following:
b) The road sections are not part of this final plat and are being reviewed in, and will be finalized with, the
proposed Belvedere Phase 11B Road Plan. This final plat will not be approved until the final road plan is
approved and the roads are built or bonded. This final plat will be required to show the right of way road
widths specified in that road plan, once it is approved.
Rev. 1: Comment not yet fully addressed. This final plat will not be approved until the final road plan
is approved and the roads are built or bonded.
Rev. 2: Comment not vet fully addressed. This final plat will not be approved until the final
road plan is approved and the roads are built or bonded.
24. [14-302(A)4&5] Private & public easements. Provide the location and dimensions of all existing and
proposed private and public easements. Existing easements should be labeled with the appropriate DB and
PG reference. Proposed easements should be labeled with the intended holder. Show the existing
easements on the adjoining property that are, or will be, connecting to the onsite existing and proposed
easements.
Final: Comment not fully addressed. Address the following:
e) Provide the legal documents required for the maintenance and ownership of the stormwater drainage
easements. Those documents will be reviewed by the County Attorney's office. They must be
approved, sign, notarized and a signed copy provided to the County prior to approval of this final plat.
They must also be recorded with the plat.
Rev. 1: Comment not yet fully addressed. Address the following:
i. A deed for stormwater drainage was submitted. However, the type of deed and the
template used are not the correct ones. Attached please find the County's template for
public road drainage easements.
Rev. 2: Comment not yet fully addressed. Address the following:
1. In the deed of dedication for the public stormwater drainage easement revise
the grantee's signature line to specify "JEFFREY B. RICHARDSON COUNTY
EXECUTIVE", not lust "County Executive" and to not include the "By:" next to
the signature line.
2. It does not appear that any "Public" stormwater drainage easements are
proposed in TMP 62A3-1. If it is correct that only "private" stormwater drainage
are proposed in that parcel then the inclusion of that parcel in the deed of
dedication and easement for the "public" storm drainage easement is not
needed in this specific legal document. Engineering has asked for clarification
on which storm drainage easements are public and private. Address this
comment once that comment has been addressed.
3. Section C, on the first page, only references TMP 63A3-1 and not TMP 61-160.
Since most, if not all (see comment above), of the proposed "public" storm
drainage easement are within TMP 61-160 this parcel should be included.
4. Ensure the revision date is updated, or a blank is provided to allow it to be
added later, once other comments on the plat are addressed.
ii. Please see engineering reviewer's comments in reference to the storm drainage
easements. Some easement specified as "public" storm easements do not carry water
from the public roads, are located in the private alleys, and therefore some of the
easements or portions of some easement should be "private" storm easements.
Rev. 2: Comment not yet fully addressed. Address the following:
1. Address Engineering's comment on public versus private storm drainage
easements and the labels provided.
2. It appears that on sheet V14 a "private" storm drainage easement is labeled as
"Public". Ensure the drainage easements are labeled correctly.
iii. Either integrate these private storm drainage easements into the supplemental agreement
or provide a separate deed that ensure the HOA maintains them. If they are to be part of
the supplemental agreement provide another highlighted version of the original
declaration that shows where the maintenance of the previous private storm drainage
easements was specified.
Rev. 2: Comment not yet fully addressed. Address the following in the
Supplemental Declaration:
a) On Page 2, in section E., where the sheets are specified, not all of the sheets
that show the easement for private maintenance are specified. Ensure they
specify all sheets and not lust the beginning sheets. These easement are
shown on sheets V9 through V12 and V13 through V16.
b) On Page 4, in section 3.b., the plat for Phase IVA-1 is specified. This is a
document that will not have been recorded at time of recordation of this
supplemental agreement. Will this plat be attached to the supplemental
agreement, and if so should it not be referred to as an attached exhibit?
c) Ensure the revision date is updated or a blank is provided in order to allow it to
be added later.
33. [Comment] Address all of the attached Site Review Committee (SRC) comments. See the attached
comments from zoning, engineering, Inspections, fire/rescue, E911, VDOT, and ACSA. Contact the
individual reviewer if you have any questions or require additional information. See the cover sheet for their
contact information.
Final: Comment not fully addressed. See and address the attached comments. See the attached comments
from zoning, engineering, Inspections, E911, VDOT, ACSA and RWSA. Comments from Transportation
Planning and Fire Rescue are still pending and will be forwarded to you once they are available.
Rev. 1: Comment not fully addressed. See the attached comments from some of the other reviewers.
VDOT and Zoning comments are still pending and will be forwarded once they are provided. Ensure all
reviewer comments are addressed.
Rev. 2: Comment not fully addressed. See the attached comments from other reviewers.
Please note that VDOT, in an email, has agreed that their comment #2 is not required since
the easement and note/label specified in their comment are already shown on sheet V12.
Please communicate directly with the VDOT, and other reviewers, to ensure that their
remaining comments are, and what will be necessary to address them is, understood.
34. [14-303] Contents of final plat. A plat meeting all the requirements for final subdivision plats per the
subdivision ordinance.
Final: Comment not fully addressed. Address all comments above and below.
Rev. 1: Comment not fully addressed. Address all comments above and below.
Rev. 2: Comment not fully addressed. Address all comments above and below.
Final Plat Comments:
40. [Comment] Submit the deed(s) for maintenance and easement for the temporary turn around easement.
This deed must be reviewed by the County Attorney's office. It must be approved, signed, notarized and a
signed copy must be submitted. This deed must be recorded with the final plat.
Rev. 1: Comment not yet fully addressed. The comment response letter specified that the
"requisite deeds have been submitted with the final plat revisions as a supplement." Please
specify which deed is meant to put in place the maintenance for the temporary turn around or what
section(s) of the supplemental declaration and original declaration will put this maintenance in
place. It is separate from Cornelius Alley and I do not think it is considered part of the "private
right of ways".
Rev. 2: Comment not vet fully addressed. Address the following in the Turnaround
Easement and Agreement:
a) Revise the Sheets specified within the document to specify the correct sheets. There
are no Sheets V or VI. Sheets are labeled as "V#" (ex. V2).
b) Ensure the revision date is updated, or a blank is provided to allow it to be added later,
once other comments on the plat are addressed.
42. [Comment] Provide the proposed 10' access easement, shown on the last submission of the Phase 1113
Road Plan, that ties the proposed Blvd. right of way into the existing access easement for TMP 62-2A.
Rev. 1: Comment not vet fully addressed. It does not appear that the realignment, creation,
or vacation of a portion of the existing easement for the drivewav access to TMP 62-2A is
included in the deeds or declarations already submitted. Either specify where this is
already being handled in the legal documents already provided, revise them to do so, or
provide the appropriate deeds for this change in the driveway.
Rev. 2: Comment addressed. Deed must be recorded with the plat.
43. Rev. 1: [New Comment] Submit the deed for the proposed sight distance easement at the corner of Farrow
Drive and Fowler Street. Although this easement will be dedicated to the County for Public Use, and the
County Executive will be signing it, no template exists at this time. This deed must be submitted and
reviewed by the County Attorney's office. It must be approved, signed, notarized, the signed copy submitted
and then signed by the County Executive. This deed must also be recorded with the final plat.
Rev. 2: Comment not fully addressed: Address the following:
a) Remove the redundant "Return" in the upper left corner of the first page. This is in the
"Return to:" area.
b) This document, since the easement is dedicated to the County for Public Use, must be
signed by the County Executive. Add a signature area for the County and ensure it
includes all required information, including the current County Executives name and
title.
c) Add the standard County acceptance language to the deed, which is "The County,
acting bV and through its County Executive, duly authorized bV resolution adopted by
the Board of Supervisors of the County of Albemarle, Virginia, accepts the conveyance
of this property pursuant to Virginia Code _4 15.2-1803, as evidenced bV the County
Executive's signature hereto and the recordation of this Deed." This is typically
included as the final provision before signatures.
d) Ensure the revision date is updated, or a blank is provided in order to allow it to be
added later, once other comments on the plat are addressed.
44. Rev. 1: fNew Commentl Ensure that the order of recordation for all deeds and declarations. and what
will be approved at the same time as the Phase 11113 plat and deeds, is considered and correct. It
appears that in the supplemental declaration for Phase 11113 (Page 3, section 3.b.) that the Phase IVA-1
plat is referenced, and blanks are left its deed book and page number. However, it is my
understanding that the applicant wishes to record Phase 11113 prior to when the Phase IVA-1 will be
able to be approved. Therefore, this reference needs to be considered and likely revised.
Rev. 2: Comment addressed. However, see comment above about including an exhibit for the Phase
IVA-1 olat. and referencina the exhibit in the declaration. since it will not have been recorded arior to
the recordation of this the supplemental agreement.
Please contact Paty Saternye in the Planning Division by using psaternye(a)albemarle.org or 434-296-5832 ext.
3250 for further information.
Stephen C. Brich, P.E.
Commissioner
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
16M Orange Road
Culpeper. Virginia 22701
March 26, 2019
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Paty Saternye
Re: Belvedere Phase IIB — Final Plat
SUB-2018-00098
Review #3
Dear Ms. Saternye:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Roudabush, Gale, &
Associates, revised 4 March 2019, and offers the following comments:
Streets intended to be public must be dedicated to the County for Public Use, please
clearly note this.
2. Provide sight distance easements and a note stating that sight distance easements are
dedicated to public use and shall be kept clear of visual obstructions, including but not
limited to fences, structures, and landscaping.
3. The road plan is currently under review and has not been approved. We do not
recommend plat approval before road plan review is complete.
4. Also include a note stating that VDOT will only maintain within drainage easements to
the extent necessary to protect the roadway from flooding or damage.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process. If further information is
desired, please contact Justin Deel at 434-422-9894.
Sincerely,
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Review Comments for SUB201800098 Final Plat 1-1
Project Name: BELVEDERE PHASE IIB - FINAL
Date Completed: Thursday, March 21, 2019 Department/DivisiordAgency: Review Status:
Reviewer: Emily Cox
LJ CDD Enaineerina
Requested Changes
lue. Both are
Page: 1 County of Albemarle
Printed ❑n: 1 G4l0812019