Loading...
HomeMy WebLinkAboutSP201700009 Checklist - Project Closeout (Administrative) Special Use Permit 2017-09-13 SPECIAL USE PERMIT / ZONING MAP AMENDMENT FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST ('lease complete this form within 30 days of final action,place in folder and forward to CDA for QC and status label. CDA will forward to the Imaging Center for digital closeout. SP/ZMA#SP-2017-00009 PROJECT TITLE: UVA Golf Indoor Practice Facility LEAD REVIEWER: Tim Padalino FINAL ACTION DATE: 9/13/2017 Hardcopy—File Folder Closeout: All documents listed should be placed in project folder in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche. Where applicable,please provide the digital location(path/name)of the document in the space provided. ® Application ® Scan ❑ Saved location ® Notification records/Abutting Owner correspondence ® Scan ❑ Saved location ® Project Review—Correspondence to/from Applicant(including emails)/Review Comments ❑ Scan ® Saved location (already in Laserfiche) E Engineering Folder-Information/documentation from Engineering Group ❑ Scan ❑ Saved location ❑ Approved Plan/Code of Development ❑ Scan ❑ Saved location ❑ PC and/or BOS Presentation Display Documents(Include Plan if not part of Staff Report) O Scan ❑ Saved location ® White Envelope(Staff Report,PC Minutes,Executive Summary,Action Letter,Presentation documents) OR—Minutes/Presentation available by contacting PC Recording Secretary Scan ❑ Saved location ❑ At the planner's discretion,copies of unapproved plans may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location ® Other Items(Please explain) Email Correspondence ❑ Scan ® Saved location I:\DEPT\Community Development\Planning Division\Tim Padalino\Current Dev Review\COMPLETE\SP201700009 UVa Golf Facility_Amend\Correspondence-Outlook Archive ® Other Items(Please explain) Due to complexity of application,numerous notes and working docs are contained in the file (within separate sub-folders) file for future reference; these do not need to be scanned or uploaded to Laserfiche. ❑ Scan ❑ Saved location NOTES: SP/ZMA project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label(same font&label color as project label)placed under the project label to reflect current project status and date; 3) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Director of Planning for corrective action. Issued 2/16/2010,Revised 3/29/2010,Revised 11/12/2012