Loading...
HomeMy WebLinkAboutARB201800160 Staff Report 2019-04-09ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2018-160: Auto Zone #6464 Review Type Initial Site Plan, preliminary architectural review Parcel Identification 061WOOlOA00300 Location Southwest corner of the intersection of Rt. 29 and Westfield Rd. Zoned Commercial (C1)/Entrance Corridor (EC) Owner/Applicant University of Virginia Foundation/Timmons Group (Clint Shifflett) Magisterial District Rio Proposal To construct an auto parts retail store with associated site improvements. Context This site is located in a heavily developed commercial area that includes a mix of retail and office buildings, motels and gas stations. Visibility The development will be readily visible from the Entrance Corridor. ARB Meeting Date April 15, 2019 Staff Contact Margaret Maliszewski 19:101BE" 811K'sto) 'A'1 A restaurant building (the Asian Buffet) that predated the establishment of the Entrance Corridors was previously located at this site. A demolition permit was issued for that building in 2011. On January 3, 2017 the ARB reviewed an Initial Site Plan for the Shops at Westfield Road at this site. The ARB recommended the following as a condition of Initial Plan approval: "Provide all planting clear of all utilities and easements, increasing planting area as needed, or provide documentation from easement holders indicating no objection to the planting. This includes sufficient space to accommodate large shade trees, ornamental trees and shrubs along the Rt. 29 frontage; large shade trees and shrubs along the Westfield Road frontage; and large shade trees and shrubs along the south and west perimeters of the parking lot." On March 20, 2017, when presented with a revised planting plan involving frontage tree sizes smaller than required, it was the consensus of the ARB that the frontage planting requirements should be met, but a combination of street -front and additional planting in other available areas could be considered. The ARB encouraged the applicant to pursue measures to reduce required parking. An ARB application was received on December 17, 2018 for an Auto Zone store at this site. The application was reviewed and was presented to the ARB on January 22, 2019. At that meeting, the applicant requested deferral and the ARB voted to accept the request. A revised submittal was made on March 4 for ARB review on April 15. The revised submittal includes changes to the architectural design (change in primary wall surface from Hardiplank to EIFS, removal of the shed roof element, addition of metal trellises on the north elevation), revisions to the site layout and landscaping (removal of the 9-parking-space row on the south side of the site, removal of 7 parking spaces along the EC, reconfiguration of the site entrance on Seminole Trail, relocation of the dumpster, addition of shrubs on the north perimeter of the site), and a preliminary monument sign illustration. ANALYSIS Gray highlight = means the guideline can't be reviewed at initial site plan stage, but recommendations can be provided for final Yellow highlight = means the guideline can only be reviewed for location/configuration at the initial plan stage Regular text = means the guideline can be reviewed at initial plan stage, can be made a condition of initial plan approval, and can be the basis for denial REF I GUIDELINE ISSUE RECOMMENDATION Structure design 1 The goal of the regulation of the design of development within the The proposed building design has no Revise the building designated Entrance Corridors is to insure that new development particular connection to the historic design — materials, forms within the corridors reflects the traditional architecture of the area. architecture of the area or the surrounding and features — to reflect Therefore, it is the purpose of ARB review and of these context of buildings. The breaking down of the traditional Guidelines, that proposed development within the designated the building length into bays and the raised architecture of the area Entrance Corridors reflect elements of design characteristic ot IS height of the entrance bay (though slight) and to establish a ficant historical landmarks, buildings, and structures of the are features that can be found in traditional cohesive whole. Focus on ottesville and Albemarle area, and to promote orderly and architecture, but they are also found across materials, windows, tive development within these corridors. Applicants should F many styles and regions, and are not a architectural elements hat replication of historic structures is neither required nor specific expression of local traditions. that function, appropriate ed. The primary proposed building material is wall treatments at the front fagade. 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, plasticized stucco. Thin brick is used for land, and vegetation. In order to accomplish the integration of pilasters and water table. The cornice at the Provide glass samples buildings, land, and vegetation characteristic of these sites, the top of the building is painted foam. and specs for review. Guidelines require attention to four primary factors: compatibility Although brick is a material traditionally with significant historic sites in the area; the character of the used in the area, it is used here as a Revise the building Entrance Corridor; site development and layout; and landscaping. secondary material. EIFS represents the vast majority of materials proposed for this design to limit EIFS to a secondary material or 3 New structures and substantial additions to existing structurdl should respect the traditions of the architecture of historically building; this extensive use of EIFS is not eliminate it completely. significant buildings in the Charlottesville and Albemarle area. appropriate for a building with this level of Photographs of historic buildings in the area, as well as drawings visibility on the EC. of architectural features, which provide important examples of this tradition are contained in Appendix A. The combination and placement of forms and features in the proposed design result in 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area'El an uncoordinated appearance. The historic structures is not intended to impose a rigid design solution placement of the decorative horizontal for new development. Replication of the design of the important stucco band relative to the transom windows historic sites in the area is neither intended nor desired. The and the top of the storefront windows Guideline's standard of compatibility can be met through building results in an awkward appearance. scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow The stucco sign band on the EC elevation individuality in design to accommodate varying tastes as well as appears top-heavy above the storefront special functional requirements. windows and takes on the appearance of a billboard. The central bay of the front 5 It is also an important objective of the Guidelines to establish a pattern of compatible architectural characteristics throughout th4 elevation appears to be sized and designed Entrance Corridor in order to achieve unity and coherence. around the sign. It is not appropriate for the Building designs should demonstrate sensitivity to other nearby primary experience of a building on the EC structures within the Entrance Corridor. Where a designated to be its signage. Further study and corridor is substantially developed, these Guidelines require additional treatment in the upper wall area striking a careful balance between harmonizing new development (center and end bays) would be appropriate. with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. Proposed glass is a combination of a strongly tinted green glass for the storefront 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible with the form? and transoms, and black spandrel glass for and features of the significant historic buildings in the area, the four individual windows on the EC side exemplified by (but not limited to) the buildings described in of the building. Blankness is a primary Appendix A [of the design guidelines]. The standard of characteristic of this building design; the compatibility can be met through scale, materials, and forms fake windows are not a convincing which may be embodied in architecture which is contemporary resolution of the problem. well as traditional. The replication of important historic sites in Albemarle County is not the objective of these guidelines. 10 Buildings should relate to their site and the surrounding context of buildings. 11 The overall design of buildings should have human scale. Scale should be integral to the building and site design. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive whole. 13 Any appearance of "blankness" resulting from building design The left elevation has no windows or doors. Revise the design to should be relieved using design detail or vegetation, or both. A darker, horizontal stucco band is the only relieve the blankness of relief in the EIFS bays. At some the left side elevation. undetermined point in the future, a second Landscaping may be an phase of building development could appropriate treatment. eliminate visibility of this wall. Until that time, additional treatment — possibly Revise the color of the landscaping — would be appropriate. service door on the right elevation to blend with The right side elevation has a single solid the building colors. door painted bright red — an unnecessary emphasis on this utilitarian feature. The Revise the design of the elevation incorporates 4 metal trellises front elevation to achieve below the decorative stucco band. a more balanced distribution of forms and The front elevation incorporates transoms features, and a better and windows with spandrel glass to relieve proportioned upper wall blankness. The transoms have an area. uncomfortable relationship with the decorative stucco band, and the transoms at Revise the decorative the far right and left ends appear awkward band to provide a with no windows below them. A more consistent alignment traditional use of transoms and decorative function for the building bands (see W. Main St. building pictured features. below), in which features align under a continuous band, might be more Revise the design to appropriate. resolve blankness without relying on fake or awkwardly placed architectural features. 14 Arcades, colonnades, or other architectural connecting devices No connecting devices are provided. The See recommendations should be used to unify groups of buildings within a development, site plan shows a potential future phase of above. building development. The design for this future building has not been provided. A level of compatibility with the Auto Zone building will be required, but continuation of the current proposed design is not recommended. 15 Trademark buildings and related features should be modified to The proposed architectural design is a Revise the trademark meet the requirements of the Guidelines. version of a company standard. Changes are design to meet the EC re ired to meet the guidelines. guidelines. 16 Window glass in the Entrance Corridors should not be highly tintel The materials list on the elevations sheet Provide additional or highly reflective. Window glass in the Entrance Corridors identifies Evergreen glass for the storefront information on the should meet the following criteria: Visible light transmittance and transom windows, and black spandrel proposed window glass. (VLT) shall not drop below 40% Visible light reflectance (VLR) glass for false windows that flank the Provide specs indicating shall not exceed 3001o. Specifications on the proposed window storefront. Spandrel glass does not meet the that VLT is not below glass should be submitted with the application for final review. guidelines. Specifications have not been 40% and VLR is not provided for the green tinted glass, but it above 30%. Provide has been ARB policy to not approve glass samples. with heavy tints. The spandrel windows and the transoms don't appear to be fully Revise the building integrated into the architectural design. design to replace the false windows with architectural design and/or elements that reflect local architectural traditions and contribute to a cohesive whole. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the The dumpster enclosure has been shifted to Show the locations of overall plan of development and shall, to the extent possible, li a location that allows the proposed building rooftop equipment on a om atible with the building designs used on the site. to mostly shield it as viewed from the EC. roof plan. Show the locations and heights of 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, these features A note on the elevations sheet indicates that rooftop equipment on the will still have a negative visual impact on the Entrance Corridor all RTUs are fully screened with the 21' architectural elevations. street, screening should be provided to eliminate visibility. a. building height. Loading areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, f. Above -ground utilities, and g. Chain link fence, barbed wire, razor wire, and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation ­4 st 04 a. Walls, b. Plantings, and c. Fencing. 20 Surface runoff structures and detention ponds should be designed to New underground pipes are proposed for None. fit into the natural topography to avoid the need for screening. When stormwater management. visible from the Entrance Corridor street, these features must be fully integrated into the landscape. They should not have the appearance of engineered features. 21 The following note should be added to the site plan and the A note indicating that all RTUs are fully Add the standard architectural plan: "Visibility of all mechanical equipment from the screened is included on the elevations sheet. mechanical equipment Entrance Corridor shall be eliminated." The standard note appears on sheet CO.1 of note to the architectural the site plan. drawings. 22-31 Lighting A lighting plan has not been provided. The Provide a complete landscape plan notes 20'-tall pole lights, but lighting plan for review. the light pole detail shows 20'-tall poles on Include a pole light detail 3' concrete bases. The detail notes a 209- that shows 20' as the watt LED "D" series area light with bronze maximum height, finish furnished by Auto Zone. including the base. Landscaping 7 The requirements of the Guidelines regarding landscaping are The landscape plan shows large shade trees Increase planting area to intended to reflect the landscaping characteristic of many of the (ginkgo), 3'/2" caliper at planting, 35' on accommodate all required area's significant historic sites which is characterized by large center along the EC frontage. Groups of 3 planting. shade trees and lawns. Landscaping should promote visual order sweetbay magnolia, 2" caliper at planting, within the Entrance Corridor and help to integrate buildings into are interspersed. The sweetbay magnolia are Indicate the height of the the existing environment of the corridor. typically sold by height, not caliper. Eight of the sweetbay magnolia fall within the overhead power lines. Provide a copy of 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that share similar characteristics. Such common elements allow for more flexibion in the design of structures because common landscape features will help to harmonize the appearance of development as seen from the street upon which the Corridor is centered. water line easement. The ginkgo trees can grow 50-80' tall and are located 10' from overhead power lines. The magnolias can grow 10 — 30' tall and are located 2' and 10' from the overhead Dominion's input on the landscape plan. Increase the shrub planting size to 24" minimum. 32 Landscaping along the frontage of Entrance Corridor streets should include the following: lines. The applicant has stated that the a. Large shade trees should be planted parallel to the Entrance proposed design takes into consideration Shift the Elm out of the Corridor Street. Such trees should be at least 3'/2 inches caliper input received from Dominion Power on sanitary easement. (measured 6 inches above the ground) and should be of a plant tree placement, but Dominion's guidelines species common to the area. Such trees should be located at leas] for planting near power lines recommend every 35 feet on center. only shrubs — no trees — within 15' of b. Flowering ornamental trees of a species common to the area, overhead lines. Increasing planting area to should be interspersed among the trees required by the precedin the west beyond the power and sanitary paragraph. The ornamental trees need not alternate one for one with lines, and shifting trees into the new the large shade trees. They may be planted among the large shade planting area, would ensure appropriate trees in a less regular spacing pattern. planting into the future. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of gid One Allee lacebark elm is located within the Entrance Corridor street. sanitary easement. The ACSA requires that d. An area of sufficient width to accommodate the foregoing the tree in the sewer easement be shifted out plantings and fencing should be reserved parallel to the Entrance of the easement. Furthermore, ACSA warns Corridor street, and exclusive of road right-of-way and utility that they will not be responsible for easements. replacement of trees/shrubs located in easements. Dominion Power will trim trees within their easements as they choose. The property owner would be required to replace any trees and shrubs that are removed, but mature trees would typically be replaced by trees of the original planting size. For these reasons, planting outside of easements is appropriate A row of shrubs, 18-24" at planting, is shown along the EC and Westfield Road frontages. These include Virginia Sweetspire, compact Inkberry, and Winterberry. The Inkberry is evergreen; the others are not. The shrub planting size does not meet the guidelines. 33 Landscaping along interior roads: Allee lacebark elms, 21/2" caliper at None. a. Large trees should be planted parallel to all interior roads. Su1A planting, are shown along Westfield Road trees should be at least 21/2 inches caliper (measured six inches averaging 30' on center. above the ground) and should be of a plant species common to the area. Such trees should be located at least every 40 feet on center. 34 Landscaping along interior pedestrian ways: Sidewalk is provided around the building Provide medium trees, a. Medium trees should be planted parallel to all interior pad, but trees are not provided on the south 2%2" caliper at planting, in pedestrian ways. Such trees should be at least 2'/2 inches caliper side. the grass area south of the (measured six inches above the ground) and should be of a species building. common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: Trees are not provided on the west parking a. Large trees should align the perimeter of parking areas, locatel perimeter or on the south side of the 40 feet on center. Trees should be planted in the interior of parking southern travelway. Only 4' of planting area areas at the rate of one tree for every 10 parking spaces provided is provided between the western property and should be evenly distributed throughout the interior of the line and the parking lot. The space is filled parking area. with a continuous row of Virginia willow b. Trees required by the preceding paragraph should measure 2 (Itea Virginica). Much of the south side of inches caliper (measured six inches above the ground); should bi the site is occupied by a gas easement, but evenly spaced; and should be of a species common to the area. approximately 75' along the travelway is Such trees should be planted in planters or medians sufficiently available for planting. large to maintain the health of the tree and shall be protected by curbing. 53 parking spaces are required for the c. Shrubs should be provided as necessary to minimize the parking proposed use; 55 spaces are proposed, area's impact on Entrance Corridor streets. Shrubs should measure requiring 6 interior trees. 7 interior parking 24 inches in height. lot trees are provided in areas north and east of the building. They include London plane trees, and heritage river birch at 2'/2" caliper. Three swamp white oaks are provided in the western parking row. These could count towards the 6.5 perimeter trees required there. When the phase 2 building is constructed, additional parking will be needed. 36 Landscaping of buildings and other structures: The left elevation has no windows or doors. Provide trees and shrubs a. Trees or other vegetation should be planted along the front of Landscaping could help soften the in the grass area on the long buildings as necessary to soften the appearance of exterior appearance of this wall. The building pad south side of the walls. The spacing, size, and type of such trees or vegetation extends southward beyond the Auto Zone proposed building to should be determined by the length, height, and blankness of such building footprint, presumably for a future soften the building's walls. building. This area could be planted in the appearance. b. Shrubs should be used to integrate the site, buildings, and other interim. structures; dumpsters, accessory buildings and structures; "drive thru" windows; service areas; and signs. Shrubs should measure at least 24 inches in height. 37 Plant species: a. Plant species required should be as approved by The tree species appear in the various lists. the Staff based upon but not limited to the Generic Landscape Plan Recommended Species List and Native Plants for Virginia Landscapes (Appendix D . 38 Plant health: The following note should be added to the landscape The plant health note appears on the sheet Revise the plant health plan: "All site plantings of trees and shrubs shall be allowed to L2.0 of the plan, but it includes a typo. note on L2.0 to read, "All reach, and be maintained at, mature height; the topping of trees it site....". prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of theplant." Site Development and layout Development paftern 6 Site development should be sensitive to the existing natural The proposed development would add a Clarify how parking and landscape and should contribute to the creation of an organized right in/right out entrance at the south end landscaping requirements development plan. This may be accomplished, to the extent of the parcel's Rt. 29 frontage. The existing will be met in Phase 2. practical, by preserving the trees and rolling terrain typical of the entrance onto Westfield would remain. The area; planting new trees along streets and pedestrian ways and proposed building is oriented parallel to Rt. choosing species that reflect native forest elements; insuring that 29. A grass area on the south side of the site any grading will blend into the surrounding topography thereby is occupied by easements and continues into creating a continuous landscape; preserving, to the extent the adjacent parcel. The proposed practical, existing significant river and stream valleys which may development would not impact any existing be located on the site and integrating these features into the design distant views. of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the The plan indicates a future Phase 2 building. site, or the Entrance Corridor. It is not clear from the proposal that parking and landscaping requirements will be able 39 The relationship of buildings and other structures to the Entrance None. Corridor street and to other development within the corridor to be met with an additional building. should be as follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f. The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic relationship of the site to Grading is proposed across the site, but it is None. surrounding conditions by limiting the use of retaining walls and by not expected to result in a major change in shaping the terrain through the use of smooth, rounded land forms the relationship of the existing site to that blend with the existing terrain. Steep cut or fill sections are surrounding conditions. No retaining walls generally unacceptable. Proposed contours on the grading plan shall are proposed. Ue roun�ec with a ten foot minimum radius where they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the drip line All existing trees are to be removed. None. of any trees or other existing features designated for preservation in the final Certificate of Appropriateness. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement 10 of heavy equipment within this area. 44 Natural drainage patterns (or to the extent required, new drainage New underground pipes are proposed for None. patterns) should be incorporated into the finished site to the extent stormwater management. possible. SIGNS Note that the elevations show a channel Note that 3M 3630-143 letter Auto Zone wall sign on the front Poppy Red and elevation of the building. A freestanding equivalents, and 3M monument style sign is also proposed. 3630-44 Orange are not These signs include red "Auto Zone" letters approvable sign colors. and a series of orange stripes. The proposed Revise the sign drawings red is 3M 3630-143 Poppy translucent accordingly. vinyl, which corresponds to Pantone 485. The orange is 3M 3630-44 orange Indicate on the landscape 3630-44 3630-143 translucent vinyl, which corresponds to plan the proposed Pantone 1655. The red is the shade that is monument sign location typically not approved in the ECs as a and show coordinated primary sign color. The orange falls outside landscaping at the base. the standard approvable color range. Include a note stating that the sign location is shown for information only; a separate sign application is required for review and approval. 11 Staff recommends the following as the primary points of discussion: 1. The trademark architectural design 2. The use of spandrel glass windows, transoms, and metal trellises to relieve blankness 3. The use of heavily tinted green glass 4. The proposed red and orange sign colors 5. The landscape and utility conflicts Staff recommends that the ARB forward the following recommendations to the Agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: 1. Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: Resolve all plant and utility conflicts. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. • Regarding the final site plan submittal: A Certificate of Appropriateness is required prior to final site plan approval. The following items must be addressed: 1. Revise the building design — materials, forms and features — to reflect the traditional architecture of the area and to establish a cohesive whole. Focus on materials, windows, architectural elements that function, appropriate wall treatments at the front fagade. 2. Provide glass samples and specs for review. 3. Revise the building design to limit EIFS to a secondary material or eliminate it completely. 4. Revise the design to relieve the blankness of the left side elevation. Landscaping may be an appropriate treatment. 5. Revise the color of the service door on the right elevation to blend with the building colors. 6. Revise the design of the front elevation to achieve a more balanced distribution of forms and features, and a better proportioned upper wall area. 7. Revise the decorative band to provide a consistent alignment function for the building features. 8. Revise the design to resolve blankness without relying on fake or awkwardly placed architectural features. 9. Revise the trademark design to meet the EC guidelines. 10. Provide additional information on the proposed window glass. Provide specs indicating that VLT is not below 40% and VLR is not above 30%. Provide samples. 12 11. Revise the building design to replace the false windows with architectural design and/or elements that reflect local architectural traditions and contribute to a cohesive whole. 12. Show the locations of rooftop equipment on a roof plan. Show the locations and heights of rooftop equipment on the architectural elevations. 13. Add the standard mechanical equipment note to the architectural drawings. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 14. Provide a complete lighting plan for review. Include a pole light detail that shows 20' as the maximum height, including the base. 15. Increase planting area to accommodate all required planting. Indicate the height of the overhead power lines. Add trees elsewhere throughout the site to compensate for the potential future loss of landscaping in easements and other site impacts. 16. Provide a copy of Dominion's input on the landscape plan. 17. Increase the shrub planting size to 24" minimum. 18. Shift the Elm out of the sanitary easement. 19. Provide medium trees, 2%2" caliper at planting, and shrubs in the grass area south of the building to soften the building's appearance. 20. Revise the plant health note on L2.0 to read, "All site....". 21. Clarify how parking and landscaping requirements will be met in Phase 2. 22. Note that 3M 3630-143 Poppy Red and equivalents, and 3M 3630-44 Orange are not approvable sign colors. Revise the sign drawings accordingly. 23. Indicate on the landscape plan the proposed monument sign location and show coordinated landscaping at the base. Include a note stating that the sign location is shown for information only; a separate sign application is required for review and approval. 13 This report is based on the following submittal items: Sheet # Drawing Name Revision Date C0.0 Cover 3/4/2019 C0.1 Site Plan Notes 3/4/2419 C0.2 Existing Conditions 3/4/2419 C 1.0 Site Layout 3/4/2019 C LA Site Details 3/4/2019 CLB Site Details 3/4/2019 CIA Grading and Drainage Plan 3/4/2419 C 1.2 Utility Plan 3/4/2019 C 1.3 Conceptual Stormwater Management Plan 3/4/2019 DLO Demolition Plan 3/4/2019 L 1.0 Landscape Plan 3/4/2019 L2.0 Landscape Notes & Details 3/4/2019 CE1 Color elevations 2/18/2019 1.1 Freestanding sign illustration 1/11/2019 - EIFS painted SW6086 Sand Dune (walls) and SW6088 Nuthatch (accent band and cornice); Evergreen lass; red anodized metal storefront, Stoneworks "firehouse" brick - 14