HomeMy WebLinkAboutARB201900024 Staff Report 2019-04-09ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2019-24: C&F Bank at Stonefield Review Type Concept Plan/Advisory Review (first review) Parcel Identification 061 WO0300019AO Location West of Seminole Trail (Rt. 29), south of Lenox Avenue, north of Blackbird Lane, and east of Stoneridge Avenue. Zoned Neighborhood Model District (NMD)/Entrance Corridor (EC)/Airport Impact Area (AIA) Owner/Applicant OCT Stonefield Property Owner LLC/Design Develop (Bob Pineo) Magisterial District Jack Jouett Proposal To build a single -story, 64' x 45' bank building and associated drive-thru, travelway, and parking spaces. Context and Visibility The small area (acreage not provided) on which the proposed bank building will be sited is adjacent to and south of 3918 Lennox Avenue, in Block G of Stonefield Town Center. [Figure 1 ] It lies approximately 320 feet west of the Entrance Corridor. The east (fagade) and south (side) elevations will be visible from the Entrance Corridor, but the west (rear) and north (side) will not be visible. [Figure 21 ARB Meeting Date April 15, 2019 Staff Contact Heather McMahon lvv I-1SMv I+. . !' . 139, f�f 137 -IL 26+ 1 { Vo'1=IvaCA+ 2� 22+ 20. `2 1 +' % 209 32 24+ 206 s liti+fl 21 114+ 2055 s 2049 2113 2 112+ 6+� 0 '�,,yy kII YV S-. 1 i , f 3 5s�dL 866-02- 1215 \ 3171� v"1 W-D3--1 8 r�:' 61 W-02 4A-2 fi1 W 0c ,1195 1193 61 W-03--1'B y 61 W-03--19Ei 2160 3173�? il"'• 11 9 3125 Q 4A312-300+ rrr cville y 3928. 3111� wow r' Cv1 ern aP 97�e 3918 fr Branch 0P kb�r v"1W'-03-=I' fr Past ;£�lra {' t Fffice �,,O 3924 f.` 31 1470 r d+f Sy 2100 2503 fi, t':.:.,. ` ",IW-03--2A r �A n t c-as--i ti 10- 0-_: . r f 4ri ti " 2075-100+ !' 2401 F y C 2050-110+ ! f fr I �• 7+3� f 1954 2055+ frr • 2030+ U. N, \ �p 2020+ 1r 2035-105+ t 2014 y 1951.' 2015+ r fr Figure 1: The proposed location, outlined in a red box, is in Block G of Stonefield Town Center. The east fagade will be approximately 320 feet from the EC. Pr 2 PROPOSED C&F BANK AT STONEFIELD NORTHBOUND ON HYDRAULIC RD. ARB SUBMISSION ALBEMARLE COUNTY, VA ENTRANCE CQRR.IQQ.R MARCH 4, 2019 Figure 2: Existing site conditions as viewed from the northbound lanes of Rt. 29 and the proposed building's visibility from the EC. Courtesy of the applicant. PROJECT HISTORY The Albemarle Place rezoning was approved in 2003. ARB review of some site plans for the development followed in 2005 and 2006. This was followed by a change in developers, and no plans received final approval. In 2011, review resumed with the Regal Cinema, the Hyatt Place Hotel, and 8 of the retail buildings in Blocks A, B and C, with approvals in 2012 and 2013. The townhouses in Block D and shops in Blocks F and G were approved in 2014 — 2016. Approximately 80 sign and County -wide Certificate of Appropriateness applications were approved administratively throughout these years. This is the first review of the concept plan for the C&F Bank in Block G by the ARB. (See Attachment A) DETAILS OF THE PROPOSAL This is a proposal to develop a single -story, 64' x 45' bank building and associated drive-thru, travelway, and parking spaces to the immediate south of the row of commercial spaces at 3918 Lennox Avenue, immediately north of the Sperry Marine property, and east of the surface parking for Costco. The approved plan for Block G (the Certificate of Appropriateness was issued April 20, 2015) does not show a building in the proposed location [Figure 3]: ' � f 4 I nw en• wvr rwwln wr• o-u.w N V$M 1 ; - -.. -! cT Gr �Gr Gr cr Gr Gr- GT ca r-.� a lal f _ Pa aelli • a -- �' ��II P/ PB (2) P (2) PB (21 PB (p IV f51 G4 9,BOOcf . � PA _. AR I GT G3 N 19) 12, 1U,f AB L - -• __ • ._. 12}�i" ` - � • • I'. GG 111 M1H ■ nli qP � '- AB 7P Ak 1 GT , I BP� ,._�P _j ff � wfai _ •W. , f T wrsn GT PL (31 Ap PL []} N I51 AFf • a a F PA r — • •CGS qT. l y �� •. uD 131 AG I,1 1G Ie T Tow SF jl�ll""� �sR 6,000 sT GT r Wtl 3j . J q) .. AG z[k'161 .AR• PLA[11 G11) PL f(f111 7AG it IG'2. 11 ._... AG 11] f 1 • 1 G(B� vL �,3 PL (tl PL [,51 1,1Y Pr [zl � 1 p,w �'._1 �( yIG{el IG 19 twxc woxwnlnry I] AF AB ABw P• AB �Ap •� Al .FV I31 .. .. A6 • I� •,3L-- S. ae ti. � —tip. •,�� �. -�, � �.r�,. �.� J � / / "I U.S. ROvI'E?�SEMINULE7RAIL ' Figure 3: Approved site plan for The Shops at Stonefield, Phase II, Parcel G (ARB-2014-140), approved 4120115. 4 Therefore, future development here will require a Major Amendment to the Site Plan that must be reviewed by both the Site Review Committee and the ARB. As per the last updated Code of Development (ZMA-2013-9) for Albemarle Place (the former name of Stonefield), financial institutions are a permitted (or by -right) use in Block G; however, "Drive-in windows serving or associated with permitted uses" in Block G require a special use permit. In 2016, a Zoning Text Amendment was approved to make drive-thru windows a by -right use. Consequently, the applicant may request a Special Exception to revise the use table in the Code of Development, rather than apply for a Special Use Permit for this drive-thru window. ARB comments on the proposal will considered in the review of the Special Exception. (See Attachment B) ANALYSIS REF GUIDELINE CURRENT ISSUE RECOMMENDATION Purpose 1 The goal of the regulation of the design of development within The style of the building is contemporary; See recommendations the designated Entrance Corridors is to ensure that new while the style does not reflect the traditional below. development within the corridors reflects the traditional architecture of the area, it is in keeping with architecture of the area. Therefore, it is the purpose of ARB contemporary building designs in Block G of review and of these Guidelines, that proposed development within Stonefield, which the ARB reviewed and the designated Entrance Corridors reflect elements of design approved in 2014 and 2015. The proposed characteristic of the significant historical landmarks, buildings, building is neither close to nor associated and structures of the Charlottesville and Albemarle area, and to with historic sites in the region; thus, the promote orderly and attractive development within these choice of a contemporary design is not corridors. Applicants should note that replication of historic incompatible, especially given the local structures is neither required nor desired. context of Route 29. The proposed design is in character with the mixed -use and 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, commercial character of Stonefield and this land, and vegetation. In order to accomplish the integration of portion of the Route 29 EC. buildings, land, and vegetation characteristic of these sites, the Guidelines require attention to four primary factors: compatibility with significant historic sites in the area; the character of the Entrance Corridor; site development and layout; and landscaping. Com a ifity with significant historic sites// Compatibility with the character of the Entrance Corridor 3 New structures and substantial additions to existing structures This new structure has been described as None should respect the traditions of the architecture of historically blending in "with the scale and aesthetics of significant buildings in the Charlottesville and Albemarle area. the adjacent commercial uses" in Block G of Photographs of historic buildings in the area, as well as drawings Stonefield. These considerations express a of architectural features, which provide important examples of respect for neighboring buildings if not this tradition are contained in Appendix A. historically significant buildings in the Charlottesville -Albemarle area. Contextual 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area's compatibility has been met in scale, form, historic structures is not intended to impose a rigid design materials, and style. Visibility of the east REF GUIDELINE CURRENT ISSUE RECOMMENDATION solution for new development. Replication of the design of the fagade and south side of the building will be important historic sites in the area is neither intended nor desired. clear from the Route 29 EC. The Guideline's standard of compatibility can be met through building scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow individuality in design to accommodate varying tastes as well asspecial functional requirements. 5 It is also an important objective of the Guidelines to establish a The character of this portion of the EC is See recommendations pattern of compatible architectural characteristics throughout the mixed, with two sections of Stonefield's below. Entrance Corridor in order to achieve unity and coherence. mixed -use and commercial character Building designs should demonstrate sensitivity to other nearby interrupted by the light -industrial Sperry structures within the Entrance Corridor. Where a designated Marine property. The overall character of corridor is substantially developed, these Guidelines require this EC, however, is car -oriented suburban striking a careful balance between harmonizing new development fabric. This addition does not detract from with the existing character of the corridor and achieving the melange already present. Site compatibility with the significant historic sites in the area. development, layout, and landscaping are compatible with earlier 20th- and 21 st-century development in the vicinity. Site development and layout 6 Site development should be sensitive to the existing natural Although the area of Block G is currently None. landscape and should contribute to the creation of an organized underutilized, it has been cleared and graded. development plan. This may be accomplished, to the extent [Figure 4] There are no mature trees, rolling practical, by preserving the trees and rolling terrain typical of the terrain, significant water or landscape area; planting new trees along streets and pedestrian ways and features to preserve. The proposed site plan choosing species that reflect native forest elements; insuring that does not appear to include additional any grading will blend into the surrounding topography thereby grading, but it does propose to enlarge the creating a continuous landscape; preserving, to the extent amount of asphalt/impervious surface by practical, existing significant river and stream valleys which may creating a travelway that will connect the be located on the site and integrating these features into the throat at the east terminus of Blackbird Lane design of surrounding development; and limiting the building with the travelway that runs east of the mass and height to a scale that does not overpower the natural commercial buildings at 3918 Lenox settings of the site, or the Entrance Corridor. Avenue. The site development, therefore, is minimal. [Figure 5 and 6 Figure 3: Aerial view of the proposed location (marked with red crosshairs, in center -right of image) shows an undeveloped open space that has been cleared and graded. Imagery courtesy of Pictometry C&F BANK AT STONEFIELD „ALBEMP, I ITY, VA i ARB EXISTING SITE CONDITIONS SUBMISSION MARCH 4, 2019 I� C&F BANK ARMED ALBFIMARLECQ9NT'i, VA 'POSED 'A MAR. - Figure 5 (top) and 6 (bottom): Existing site conditions and Proposed site plan. Note that the eastern terminus of Blackbird Lane in top image will be continued eastward and then northward to connect with the existing travelway east of the commercial buildings at 3918 Lenox Avenue. 8 Landscaping 7 The requirements of the Guidelines regarding landscaping are The submittal includes the portion of the See recommendations in intended to reflect the landscaping characteristic of many of the approved landscape plan that was approved `Landscaping' section area's significant historic sites which is characterized by large for Block G in 2015; no new landscaping is below. shade trees and lawns. Landscaping should promote visual order proposed. Some of the landscaping depicted within the Entrance Corridor and help to integrate buildings into on the approved plan along the south side of the existing environment of the corridor. the site has not been planted. 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that share similar characteristics. Such common elements allow for more flexibility in the design of structures because common landscape features will help to harmonize the appearance of development as seen from the street upon which the Corridor is centered. Structure design 9 Building forms and features, including roofs, windows, doors, The proposed single -story building will Provide dimensioned materials, colors and textures should be compatible with the encompass 2,880 square feet (64' x 45'). elevations and floorplans forms and features of the significant historic buildings in the area, Only the east (fagade) and south (side) as well as material and exemplified by (but not limited to) the buildings described in elevations will be visible from the EC and color samples of the Appendix A. The standard of compatibility can be met through therefore fall under ARB purview. stone veneer and Hardie scale, materials, and forms which may be embodied in Panel for review. architecture which is contemporary as well as traditional. The The east fagade is broken into three bays, Correlate all renderings replication of important historic sites in Albemarle County is not with the middle (entrance) bay rising to 24'- and elevations regarding the objective of these guidelines. 6" from grade; the flanking wings have a height of 20'-0" from slab to top of parapet. the materials in the entrance bay. 10 Buildings should relate to their site and the surrounding context of buildings. These heights are consistent with the neighboring commercial spaces to the Provide window -glass 11 The overall design of buildings should have human scale. Scale should be integral to the building and site design. immediate north, where the main wall rises 22'-8" from grade and the corner towers rise specifications for review. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive whole. 26'-8" from grade. The taller tower form marks the entrance and is not unlike those Revise the window glass note to eliminate the first 13 Any appearance of "blankness" resulting from building design should be relieved using design detail or vegetation, or both. central features found at the Jared jewelry or BJ's Restaurant buildings, which are nearby clause, "Window glass in the Entrance Corridors 14 Arcades, colonnades, or other architectural connecting devices should be used to unify groups of buildings within a development. in Block G. Not only do the height and form relate the building to its surrounding should meet the following criteria:" If 15 Trademark buildings and related features should be modified to meet the requirements of the Guidelines. contextibuilt fabric, but they also maintain a human scale. spandrel glass is approved, the standard 16 Window glass in the Entrance Corridors should not be highly tinted or highly reflective. Reflectance off the outside pane of glass should window glass note must be kept below 7%. Specifications on the proposed window glass and The flat -roofed structure, in plan, is a simple be revised to further samples of tinted window glass should be submitted with the rectangle. The east facade [Figure 7] is qualify its allowance. application for final review. Window glass in the Entrance broken vertically by four pilasters that mark Corridors should meet the following criteria: Visible light the three bays. The facade is demarcated The conceptual transmittance (VLT) shall not drop below 40%. Visible light horizontally in a tripartite configuration: architectural design reflectance (VLR) shall not exceed 30%. adhered thin brick painted white (PPG suggests that a `Delicate White' 518-1) forms the bases of development of the the pilasters while the foundation is clad in a illustrated size, scale, and stone veneer (Alpine Ledgestone in `Dark form can be constructed Ridge'). The adjacent building has a dark tile with an appropriate base (Daltile, "Diamante-Grigio") of similar appearance for the proportions. The stone veneer previously Entrance Corridor. approved for Block G is Charles Luck Mastercut, "Sterling Rustic" and "Charcoal Gray." If the applicant wishes to use a different stone veneer, material samples will be required for review. Al UYMIINUM CHANNEL LE11ER SIGNAGE FAINTED PANroNE 343 C -- ROOF ACCESS 1 AfJf7ER C CHANNEL C ANi}PY WITH aNGLE6 SLATS .... . ?AINTE❑ PANTONE 343 C E}fISTING DUMPSTER ENClpSURC � I I� �C �'••5.xi A E d F C G B A Figure 7: Elevation of east facade. Courtesy of the applicant. The middle horizontal section, which is largely fenestrated, includes the engaged pilasters in EIFS siding PPG `Delicate 10 White' 518-1, a color previously approved in Stonefield), wall plane in EIFS siding (PPG `Sharkskin' 513-5, also a previously approved color), and anodized bronze aluminum storefront systems in clear glazing topped by Ipe canopies with C-channel frames painted green (Pantone 343C): PANTONE' 3�43 Note that, while the approved building material and colors for Block G (ARB-2014- 140) (See Attachment C) include Sunbrella awnings in black, natural, charcoal gray, navy blue, alpine green, and panorama taupe, the neighboring commercial building has only black awnings. And while several buildings throughout the Stonefield complex have canopies, staff is unaware of another instance in which the canopy frames are forest green. The proposed shade of green is a relatively dark one and is expected to have an appropriate appearance for the EC. The upper wall is composed of Hardie panel fiber cement boards with 6" exposure and a 3/4" aluminum reveal trim; while the color of the Hardie panel has not been provided, the "exterior finishes" page of the applicant's package shows an off-white color that is between the two shades of EIFS white and 11 taupe [Figure 8]. The materials and color palette are consistent with the neighboring buildings in Block G of Stonefield. The variation in colors and textures as well as the fenestration eliminate any concern of blankness on this elevation. Staff notes that there is a discrepancy between the east elevation provided and the renderings of the facade: the latter shows stone veneer surrounding the entrance storefront, rising from the stone foundation to the Hardie panel top, while the elevations depict EIFS. The stone veneer, which is more appropriate to the function of the entrance bay, is recommended. The south (side) elevation (labeled "left elevation" in the application package) will also be visible from the EC [Figure 9]. This elevation includes an ATM and two drive- thru teller windows that will require a Special Exception application to amend the language in the Code of Development. The design handles this blank and utilitarian facade by raising the stone veneer foundation higher, thereby reducing the amount of EIFS, and by adding two Ipe wood, C-Channel canopies to the two bays on level with the three canopies provided on the facade. The side elevation therefore is not expected to read as drive-thru windows as viewed from the EC, but a continuation of the same architectural elements provided on the front. 12 CULTURFD STONE PRO•fIT ALPINE LEDGESTONE I DARK RIDGE IPE WOOD ENTRANCE CANOPY WITH CHANNEL STEEL FRAME PA" _) PA.NTONE 343 C C&E BANK ATIMMItLD ALBEMARLE COUNTY, V/-� EIFS SIDING PAINTED IN PPG DELICATE WHITE 518-1 BRONZE ALUMINUM SIOREFRONT EIFS SIDING PAINTED IN PPG SHARKSKIN 513.5 ALUMINUM CHANNEL LETTER SIGNAGE PAINTED PANTONE 343 C Figure 8: Proposed materials and color palette. Courtesy of the applicant. HARDIE PANEL FIBER CEMENT BOARD 5" EXPOSURE WITH 314" ALUMINUM REVEAL TRIM ADHERED THIN 7 518" X 2 114'' BRICK PAINTED IN PPG DELICATE WHITE 518-1 iRB SUBMISSION MARCH 4 2n10 13 C&F BANK ATSTONEFIELD FRONT ELEVATION FROM ARB SUBMISSION ALBEMARLE COUNTY, VA INTER IQR PARKING LOT MARCH 4, 2019 Figure 9: Proposed south (side) and east (fagade) elevations. Courtesy of the applicant. 14 Lastly, the standard window glass note has been provided on the elevations, but the first clause, "Window glass in the Entrance Corridors should meet the following criteria," should be deleted. Manufacturers specifications for the windows have not been provided. In addition, the applicant has proposed an anodized bronze aluminum storefront system with clear glazing, but also spandrel -glazed transoms on the east fagade. The ARB has typically not favored spandrel glass in previous submissions, however, in this application, the small amount proposed and the fact that the transoms are separated from the main window systems by the canopies may make the use of spandrel glass appropriate. If spandrel glass is approved, the standard window glass note will have to be revised to further qualify its allowance. In sum, the conceptual architectural design suggests that a development of the illustrated size, scale, and form can be constructed with an appropriate appearance for the EC. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the No accessory structures or equipment are None. overall plan of development and shall, to the extent possible, be proposed. compatible with the building designs used on the site. 18 The following should be located to eliminate visibility from the No loading or service areas are proposed for None. Entrance Corridor street. If, after appropriate siting, these features this financial use. An existing refuse area will still have a negative visual impact on the Entrance Corridor with dumpster lies to the rear of the building street, screening should be provided to eliminate visibility. and will not be visible from the EC. a. Loading areas, b. Service areas, c. Refuse areas, d. Storage areas, e. Mechanical equipment, f. Above -ground utilities, and Proposed mechanical equipment (two HVAC g. Chain link fence, barbed wire, razor wire, and similar security units) is roof -mounted, and the applicant has fencing devices. provided a roof plan that shows the locations of the proposed units but not the units' 15 dimensions, primarily height. However, the two proposed units are located in the rear (west side) of the central pavilion, on a roof floor that is 16'-0" from slab; the parapet of the tower here is 24'-6" from slab, and with a difference of 8.5 feet, it is unlikely that mechanical units will be visible from the EC. 19 Screening devices should be compatible with the design of the No screening devices are proposed. None. buildings and surrounding natural vegetation and may consist of: a. Walls, b. Plantings, and c. Fencing. 20 Surface runoff structures and detention ponds should be designed No utility plan has been provided but must Note that a full site plan to fit into the natural topography to avoid the need for screening. be provided with a site plan set when the will be required with a When visible from the Entrance Corridor street, these features must applicant applies for a Major Amendment to Major Amendment to a be fully integrated into the landscape. They should not have the the site plan. Site Plan application. appearance of engineered features. 21 The following note should be added to the site plan and the The note has not been provided and should Provide standard architectural plan: Visibility of all mechanical equipment from the be provided on future site plan sets as well as mechanical equipment Entrance Corridor shall be eliminated. architectural drawings submitted for review. note to future site plans and architectural elevations. 22-31 Lighting No lighting plan was submitted with this Provide a lighting plan concept plan. Note that site lighting may not for review, including spillover onto public streets greater than11/2 photometric values of all footcandle; that all lights that emit more than proposed site and 3,000 lumens must be full cut-offs; and that architectural lighting, as light levels exceeding 20 footcandles are not well as a luminaire appropriate in the EC overlay district. schedule and manufacturer's specifications. Landsca in 32 Landscaping along the frontage of Entrance Corridor streets The parcel does not abut the EC; therefore, None. should include the following: this requirement is moot. a. Large shade trees should be planted parallel to the Entrance Corridor Street. Such trees should be at least 3'/2 inches caliper (measured 6 inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 35 feet on center. 16 b. Flowering ornamental trees of a species common to the area should be interspersed among the trees required by the preceding paragraph. The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: Included in this submittal is a portion of the Include a landscape plan a. Large trees should be planted parallel to all interior roads. Such landscape plan that was previously approved and schedule for the bank trees should be at least 2%2 inches caliper (measured six inches for Block G in 2015, and the approved Block site with the next above the ground) and should be of a plant species common to the G landscape schedule. A revised landscape submittal. area. Such trees should be located at least every 40 feet on center. plan and schedule illustrating the proposed changes to the bank site will be needed. 34 Landscaping along interior pedestrian ways: a. Medium trees should be planted parallel to all interior pedestrian ways. Such trees should be at least 2%2 inches caliper (measured six inches above the ground) and should be of a species common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: The proposed parking is 4 spaces in the front Provide 2 large shade a. Large trees should align the perimeter of parking areas, located (east side) of the building and 4 parallel- trees in the vicinity of the 40 feet on center. Trees should be planted in the interior of parking spaces on the proposed travelway. 4 parking spaces at the parking areas at the rate of one tree for every 10 parking spaces The Site Review Committee review process front of the bank. provided and should be evenly distributed throughout the interior will determine whether the quantity and of the parking area. location of these spaces are approvable. The b. Trees required by the preceding paragraph should measure 21/2 proposed trees to the south side of the lot, inches caliper (measured six inches above the ground); should be which were approved with Block G in 2015 evenly spaced; and should be of a species common to the area. but have not been planted, will serve to shade Such trees should be planted in planters or medians sufficiently the 4 parallel parking spaces. However, no large to maintain the health of the tree and shall be protected by trees are proposed for the four spaces in the curbing. front of the building. Two specimen trees c. Shrubs should be provided as necessary to minimize the would serve to soften the building's parking area's impact on Entrance Corridor streets. Shrubs should appearance and provide required canopy, but measure 24 inches in height. the sidewalk configuration does not appear to 17 allow for sufficient planting area. Adding trees on the east side of the travelway may be an alternative. 36 Landscaping of buildings and other structures: No vegetation is proposed for the building a. Trees or other vegetation should be planted along the front of foundations. Planting islands to the south and long buildings as necessary to soften the appearance of exterior to the north of the four parking spaces on the walls. The spacing, size, and type of such trees or vegetation east side of the building would serve to should be determined by the length, height, and blankness of such soften the elevation as well as provide walls. parking shade requirements. b. Shrubs should be used to integrate the site, buildings, and other structures; dumpsters, accessory buildings and structures; "drive thru" windows; service areas; and signs. Shrubs should measure at least 24 inches in height. 37 Plant species: No new landscaping has been proposed at None. a. Plant species required should be as approved by the Staff based this time. upon but not limited to the Generic Landscape Plan Recommended Species List and Native Plants for Virginia Landscapes (Appendix D . 38 Plant health: The note has not been provided on the Provide the standard The following note should be added to the landscape plan: All site conceptual landscape plan. plant health note on the plantings of trees and shrubs shall be allowed to reach, and be landscape plan. maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. Development Pattern 39 The relationship of buildings and other structures to the Entrance The proposal exhibits an organized pattern of The conceptual site Corridor street and to other development within the corridor roads and sidewalks, and provisions have design suggests that a should be as follows: been made for connections to adjacent development of the a. An organized pattern of roads, service lanes, bike paths, and pedestrian and vehicular circulation systems. illustrated size, scale, and pedestrian walks should guide the layout of the site. The Site Review Committee review process layout can be constructed b. In general, buildings fronting the Entrance Corridor street will determine whether the quantity and with an appropriate should be parallel to the street. Building groupings should be location of parking spaces are approvable. appearance for the arranged to parallel the Entrance Corridor street. Entrance Corridor. c. Provisions should be made for connections to adjacent The building is oriented parallel to the EC, pedestrian and vehicular circulation systems. but the building is not adjacent to the EC and d. Open spaces should be tied into surrounding areas to provide will be set back approximately 320 feet from continuity within the Entrance Corridor. the western edge of Route 29. e. If significant natural features exist on the site(including creek 18 valleys, steep slopes, significant trees or rock outcroppings), to No open spaces are proposed and no the extent practical, then such natural features should be reflected significant natural features exist to be in the site layout. If the provisions of Section 32.5.2.n of the preserved. No significant viewsheds exist on Albemarle County Zoning Ordinance apply, then improvements the site. required by that section should be located so as to maximize the use of existing features in screening such improvements from In sum, the conceptual site design suggests Entrance Corridor streets. that a development of the illustrated size, f. The placement of structures on the site should respect existing scale, and layout can be constructed with an views and vistas on and around the site. appropriate appearance for the Entrance Corridor. Site Gradin 40 Site grading should maintain the basic relationship of the site to This site has been previously graded and Show adequate tree surrounding conditions by limiting the use of retaining walls and by cleared. No additional grading is proposed in protection fencing on the shaping the terrain through the use of smooth, rounded land forms this conceptual plan, and any required plans. that blend with the existing terrain. Steep cut or fill sections are grading is expected to be minimal and on generally unacceptable. Proposed contours on the grading plan shall previously disturbed land. Some trees and be rounded with a ten foot minimum radius where they meet the shrubs are located close to proposed work. adjacent condition. Final grading should achieve a natural, rather Tree protection fencing will be needed. than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the drip line of any trees or other existing features designated for preservation in the final Certificate of Appropriateness. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. No grading, trenching, or tunneling should occur within the drip line of any trees or other existing features designated for preservation in the final Certificate of Appropriateness. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 19 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. Preservation areas should be protected from storage or movement of heavy equipment within this area. SIGNS Signs illustrated on the elevations are for Note that a separate sign information only. Signs will be reviewed and application will be approved with a separate sign application. required. SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The use of spandrel glass on the fagade. 2. The treatment of the south (side) elevation and the drive-thru windows. 3. The need for trees at the 4 parking spaces in front of the bank. Regarding the Special Exception for the Drive -through Staff recommends that the ARB forward the following recommendation to the Agent for the Site Review Committee: Because the conceptual site plan and architectural design suggest that a development of the illustrated size, scale, form and layout can be constructed with an appropriate appearance for the Entrance Corridor, the ARB has no objection to the request for the Special Exception. Regarding the site plan and architectural design: Staff offers the following comments to be addressed with the future site plan submittals: 1. Provide dimensioned elevations and floorplans as well as material and color samples of the stone veneer and Hardie Panel for review. 2. Correlate all renderings and elevations regarding the materials in the entrance bay. 3. Provide window -glass specifications for review. 4. Revise the window glass note to eliminate the first clause, "Window glass in the Entrance Corridors should meet the following criteria:" If spandrel glass is approved, the standard window glass note must be revised to further qualify its allowance. 5. . 6. Note that a full site plan will be required with a Major Amendment to a Site Plan application. 7. Provide standard mechanical equipment note to future site plans and architectural elevations: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 8. Provide a lighting plan for review, including photometric values of all proposed site and architectural lighting, as well as a luminaire schedule and manufacturer's specifications. 9. Include a landscape plan and schedule for the bank site with the next submittal. 10. Provide 2 large shade trees in the vicinity of the 4 parking spaces at the front of the bank. 11. Provide the standard plant health note on the landscape plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 12. Show adequate tree protection fencing on the plans. 20 13. Note that a separate sign application will be required. TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date Al.I Floor Plan 3/1/19 A1.2 Roof Plan 3/1/19 A2.1 Elevations 3/1/19 A2.2 Elevations 3/1/19 P. 1 Project Description 3/4/19 p. 2 Vicinity Ma 3/4/19 p. 3 Context Photos 3/4/19 p. 4 Existing Site Conditions 3/4/19 p. 5 Proposed Site Plan 3/4/19 p. 6 Existing/Proposed Northbound on Hydraulic Rd. Entrance Corridor 3/4/19 p. 7 Existing/Proposed Southbound on Hydraulic Rd. Entrance Corridor 3/4/19 p. 8 Front Elevation from Interior Parkin Lot 3/4/19 P. 9 Front Elevation from Parking Lot Exit 3/4/19 P. 10 Aerial 3/4/19 P. 11 Aerial 3/4/19 p. 12 Front Elevation 3/4/19 p. 13 Rear Elevation 3/4/19 p. 14 Entrance from Blackbird Lane 3/4/19 p. 15 Entrance from Stonerid e Ave. 3/4/19 p. 16 Pedestrian Planting Plan 3/4/19 p. 17 Exterior Finishes 3/4/19 21 ATTACHMENT A — Stonefield Review History DATE APPLICATION REVIEW TYPE RESULT 8/l/03 ARB-2003-87 Albemarle Place, Advisory Review The ARB provided recommendations on the Code of Development 12/19/05 ARB-2005-133 Albemarle Place, Work Session for Preliminary Site Plan The ARB provided recommendations to the applicant 5/15/06 ARB-2006-30 Albemarle Place, Sign and Final Site Plan The ARB recommended a work session 6/5/06 ARB-2006-31 Albemarle Place, Sign and Final Site Plan, Work Session The ARB provided comments 9/15/08 ARB-2008-131 Albemarle Place, Work Session The ARB provided recommendations to the applicant 1/3/11 N/A The Shops at Stonefield-Town Center, Work Session The ARB provided comments 4/18/11 N/A The Shops at Stonefield-Town Center, Work Session on Hyatt Place The ARB provided comments 5/16/11 N/A The Shops at Stonefield-Town Center, Work Session on conce t elevations for Regal Cinema and Trader Joe's The ARB provided comments 6/6/11 N/A The Shops at Stonefield-Town Center, Work Session on Town Center Buildings The ARB provided comments 6/20/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan The ARB held a work session on Regal Cinema and Trader Joe's elevations and provided comments 7/5/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan The ARB provided comments for a future resubmittal 7/5/11 ARB-2011-63 Hyatt Place at Stonefield, Preliminary Site Plan The ARB provided comments for a future resubmittal 7/18/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan The ARB provided comments for a future resubmittal 8/15/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan The ARB held a work session on Regal Cinema and provided comments 8/15/11 ARB-2011-79 The Shops at Stonefield Town Center, Preliminary Site Plan The ARB directed the applicant to return for a work session on buildings A1, A3, and B1 9/6/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan The ARB provided comments for a future resubmittal 9/19/11 ARB-2011-79 The Shops at Stonefield Town Center, Work Session The ARB provided comments 10/3/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan The ARB held a work session on Regal Cinema and provided comments 10/3/11 ARB-2011-79 The Shops at Stonefield Town Center, Work Session The ARB provided comments 10/3/11 ARB-2011-93 Hyatt Place at Stonefield, Final Site Plan Approval with conditions for administrative review 10/17/11 ARB-2011-62 The Shops at Stonefield, Regal Cinema, Final Site Plan Colors approved with conditions* 22 10/17/11 ARB-2011-112 The Shops at Stonefield, Final Site Plan Approval with conditions for administrative review 12/19/11 ARB-2011-112 The Shops at Stonefield, Work Session The ARB provided comments on signs and awnings 2/6/12 ARB-2012-6 Regal Cinemas at the Shops at Stonefield Approved illuminated wall sign with conditions 3/5/12 ARB-2012-20 The Shops at Stonefield, Building and Site Lighting The ARB provided comments for future submittal 3/19/12 ARB-2012-20 The Shops at Stonefield, Building and Site Lighting Approved with condition to be administrative) reviewed 4/2/12 ARB-2012-28 The Shops at Stonefield, Comprehensive Sign Plan The ARB provided comments for future submittal 8/5/13 ARB-2013-86 The Shops at Stonefield, Blocks F and G, Initial Site Plan The ARB provided recommendations to the site agent 3/28/14 ARB-2013-157 Stonefield, Phase 2, Final Site Plan The ARB approved the request and a CoA was issued 6/2/14 N/A The Shops at Stonefield Phase 2 Parcel G, Final Site Plan — introductory Work Session The ARB provided recommendations to the applicant 12/15/14 ARB-2014-133 Stonefield Townhomes D2 , Final Site Plan The ARB provided comments for future submittal 115115 ARB-2014-133 Stonefield Townhomes D2 , Final Site Plan Approved with conditions for administrative review 115115 ARB-2014-140 The Shops at Stonefield Phase 2 Parcel G, Final Site Plan — first review The ARB provided recommendations to the applicant 1/20/15 ARB-2014-140 The Shops at Stonefield Phase 2 Parcel G, Final Site Plan — second review The ARB approved the request with conditions 2/16/16 ARB-2016-2 The Shops at Stonefield Phase 2, Parcel G, Bldg. G1, Amendment (Jared Jewelry Store) — first review The ARB provided recommendations to the applicant 3/7/16 ARB-2016-2 The Shops at Stonefield Phase 2, Parcel G, Bldg. G1, Amendment (Jared Jewelry Store) — Work Session The ARB provided recommendations to the applicant 4/18/16 ARB-2016-2 The Shops at Stonefield Phase 2, Parcel G, Bldg. G1, Amendment (Jared Jewelry Store) — third review The ARB approved the request with conditions 1/7/19 ARB-2018-154 Hatt House at Stonefield, Preliminary Site Plan This will be the first review of the Preliminary Site Plan *Two meetings, in September 2013 and March 2014, were held in reference to the copper panels on the Hyatt Place Hotel, which were ultimately approved. 23 ATTACHMENT B — pages 1 and 2 of the Code of Development for Albemarle Place (ZMA-2013-9) CODE OF DEVELOPMENT APPENDIX A— FemiffiedfProhibitedUses by Sleek" ❑etober 15,1003 (revised ?Al *P-Permitted uses by block; SP-USas that maybaapph d bo via Special Uae Perm[t; ]3[aak- Uses pynhibhed wiihht block. The square foowgcs fair all ages shaded In this table shall aDwa teweidc the retail puniao of !ha non•rasidsntia] a9aars fuotago maximum e9tab]Ished In the Code of l]evelo menr in Tablul: "Uses I�hld' Black CIMP,1 2 3 Block A I8 C D B F U Electric, gas, oil and corraririaiwina Ikcililies, excluding loww atnrclures end including poles, lines, transfoimws, pipes, metere end related facilities IF dW lbutlon of lacal servka and owwd and operdtd by a public utllgy. Water disrrl"ion and sarvmp collectiwr fines, pmnpingstatians MA appurtenance owned and P P P P F P P Mated by the Albemarle Cow" Service Autbonty. Except as atbenvlse,vNpremlyprovided, cwmI —ba g,rpppUts and central eewetage syslens in comk%n once vilh Chapter 16 ofdve Cods of Albemarle and al] ether Eppltjm4k law. FyAory etnkeales- alothin aadAMC P IP 1 P 1 P 1 P 1 P 1 P T— -Z.. 1 I P t P I P I P I P I P 6 P Food end grocery stores incladtrig a Wi specialty attops as hamry, card milk ensar and wine and dreese Sim s P P I P P P I P I P Flmeral botues P P P P PP Fumaiturn and hmne a lImices sales and sar-Ace P P P P P P P Hardwat+e stare P P I P P P P P Health club au Wa P P P P P P P amfiQ all saks and dJstrilwtion eferetue 5.t.20 P P P P P P 1? .Home mid hushtess suvicesuch asgrounds care, dMking, exlermi wridscofPPA and Acr airandTnainknanae F P P P P P P HOSIMIs SP SP SP SP SP SP SP Hotel moxla avid inoa P P P P P P P Indoor athletic facilities P P P P P P P Indoor thmwwm P P P P P P P La6nmiories medicxt rn drmacaniical P P P P P P P Laundries, d vlsarmas P P P F F P P Lmimelmomt (prorided that an atPondant shall be oat duty at all hr u h P P P P P P service and rental Mmor Vehicle sales, service R Musical instrnmwu 5 New aal9ntodWe name 24 ATTACHMENT C — APPROVED BUILDING MATERIALS/COLORS ARB 2014-140: Stonefield Block G Building Part Material Brand Color Notes Wall Stone Charles Luck Sterling Rustic & Charcoal Gray Mastercut Veneer Thin Brick Painted PPG Porter Paints Delicate White 518-1 Ceramic Tile Daltile Diamante — Gri io Fiber Cement Board Hardi Board siding 6" exposure, painted PPG Porter Paints Delicate White 518-1 Fiber Cement Board Hardi Board siding 6" exposure, painted PPG Porter Paints Antique Silver 530-5 Synthetic Stucco Sto Stotherm Essence finished to match PPG Porter Paints Delicate White 518-1 Synthetic Stucco Sto Stotherm Essence finished to match PPG Porter Paints Sharkskin 513-5 Synthetic Stucco Sto Stotherm Essence finished to match PPG Porter Paints Flagstone 518-4 Wood lx6 Southern Cyprus, clear sealed, fire treated Fluropolymer To match PPG Porter Paints Delicate White 518-1 Coating and PPG Porter Paints Flagstone 518-4 Storefront Vision glazing in white Kynar storefront system VLT shall not drop below 40%; VLR shall not exceed 30% Awning Sunbrella Black 08 Natural 04 Charcoal Gray 44 Navy Blue 26 Alpine Green 55 Panorama Taupe 48 25