Loading...
HomeMy WebLinkAboutSUB201800171 Review Comments Road Plan and Comps. 2019-04-11John Anderson From: Deel, Justin <justin.deel@vdot.virginia.gov> Sent: Thursday, April 11, 2019 12:26 PM To: Jonathan Showalter; John Anderson; Adam Moore; Todd Marshall Subject: Lewis & Clark S&B Comments 0 Below are comments from our Structure & Bridge/Geotechnical section concerning Culvert 1. Note that comment 1 is in response to recent culvert replacements and associated relocation of utilities and easement acquisition costs that the Department has experienced. Note that this comment also applies to Culverts 2 & 3. There are still several geotechnical comments. I encourage you to have your geotechnical engineer(s) contact the reviewer directly in order to expedite resolution to these comments. The reviewer is Robert Vester, PE; he can be reached at 804-786-2107, or via email at Robert.Vester@vdot.virginia.gov . I am still working through reviewing the Land Use/Traffic Engineering concerns, which I hope to complete by Tuesday of next week. Once complete, we'll send a letter with any comments that we may have. Hopefully it will only include the below comments which you will already be on your way to addressing. Structure & Bridge There are multiple utilities/lines proposed above Culvert 1 described on Sheet C4.2. I have identified stormwater pipes, sewer line, conduits for Dominion, gas line, and additional PVC conduits. Culpeper District Structure & Bridge will not accept a structure into our inventory that poses future maintenance concerns by placing utilities above or below proposed structures. In this case, additional permanent easements or ROW should be acquired to relocate utilities outside the footprint of the proposed Culverts 1, 2, & 3. (Hopefully this will not be difficult given it's all UVA Foundation property -Justin) Geotechnical 1.) Plan Sheets, General: Please clarify why the VDOT Road and Bridge (R&B) PB-1 standard was not included in the plan sheets. 2.) GER, General: Although the Boring logs appear to have been provided using the "gINT" software on the VDOT template, soil descriptions provided on the boring logs do not appear to follow the guidelines provided in Chapter 3 of the VDOT Manual of Instruction (MOI). 3.) GER General: Soil parameters provided in the calculations do not all appear to match the soil parameters provided in the GER Narrative. 4.) GER Table of Contents: There appears to be a typo as the word "Fill" is misspelled in Section 6.3.2 5.) GER Narrative, Page A, 8" bullet: In the first sentence there appears to be an errant parenthesis symbol after station 50+00. 6.) GER Narrative, Page 10, Section 6.4: The second sentence states "According to VDOT memorandum MD 340- 10 dated August 2, 2010, the cut and fill slopes for this project are considered "non -critical slopes" and require a factor of safety of 1.3 for slope stability." This statement should be revised to reference Table 3-7 of the most current version of the Chapter III of the VDOT MOI. 7.) GER Narrative, Page 10, Section 6.4: The table of soil parameters provided does not appear to clarify if these values are for short-term total stress or long-term effective stress conditions. 8.) GER Narrative, Page 10, Section 6.4: Please clarify if the global slope stability analysis output provided in the appendices is based on short-term total stress or long-term effective stress conditions. 9.) GER Narrative, Page 11, Section 6.5.1: The recommendations provided in the narrative as well as the culvert bearing resistance calculations provided in the appendices of the revised GER appear to be based on Allowable Stress Design (ASD) methods. Please resubmit bearing resistance (nominal and factored) and loading pressure values (nominal and factored) as well as calculations using Load Reduction Factor Design (LRFD) methods. 10.) GER Narrative, Page 11, Section 6.5.1: The report narrative and the calculations in the appendices provide an estimated magnitude of settlement of approximately 1.3 inches. Please clarify if this magnitude of settlement is acceptable for the culvert structure as well as the roadway design. b. Please clarify if this magnitude of settlement is immediate elastic settlement. c. Please clarify the anticipated duration to achieve the estimated magnitude of settlement. 11.) GER Narrative, Page 11, Section 6.5.1: The recommendations provided for the culvert end wall foundations do not appear to be supported by design calculations provided in the appendices. Please provide calculations. Justin Deel, P.E. VDOT - Charlottesville 434-422-9894 540-717-1408 (c)