Loading...
HomeMy WebLinkAboutSP201900003 SP Checklist 2019-04-16SPECIAL USE PERMIT CHECKLIST for Hunter's Way TMP 07800-00-00-049A0� ALA 11 k �IRGIl`I�P After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.33 that must be submitted with the official application CPP Required for Provided with application? (County Staff) application (Applicant) SECTION 33.33 XX NOTE to staff: if providing additional comments are provided within the checklist boxes, please distinguish those comments with different color print AND italic/underlined print or some other method that can be distinguished when copied with a black and white copier/printer. YES NO A narrative of the project proposal, including its public need or benefit, A narrative of the proposed project's consistency with the comprehensive plan, including the land use plan and the master plan for the applicable development area; X X A narrative of the proposed project's impacts on public facilities and public infrastructure. X X A narrative of the proposed project's impacts on environmental features. A narrative of the proffers proposed to address impacts from the proposed project. X One or more maps showing the proposed project's regional context and existing natural and manmade physical cond'ti ns; A revised Major Site Plan Amendment to address all County review comments shall be submitted with the SP request to act as the Concept Plan. X X 1) the street network, including circulation within the project and connections to existing and proposed or planned streets within and outside of the project; 2) typical cross -sections to show proportions, scale and streetscape/cross- sections/circulation; X yt 3) the general location of pedestrian and bicycle facilities; X X 4) building envelopes; 51 parr -king envelopes; X SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2 X 6) public spaces and amenities; X 7) areas to be designated as conservation and/or preservation areas; X 8) conceptual stormwater detention facility locations; X 9) cceeptual grading; especial Other studies or documentation, if applicable, and any other information X identified as necessary by the county on the pre -application comment form. - Required water consumption figures for the site - A revised Major Site Plan Amendment to address all County review comments shall be submitted with the SP request to act as the Concept Plan. - Attached SP Checklist. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. Signature of person completing this checklist Christopher Perez 3-20-19 434.296.5832 ext. 3443 SPECIAL USE PERMIT CHECKLIST 04/2013 Page 2 of 2