Loading...
HomeMy WebLinkAboutSP201900004 SP Checklist 2019-04-16SPECIAL USE PERMIT CHECKLIST for Virginia Institute of Austism / TMP 061W0-02-00-002A1 t�RGtN�? After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.33 that must be submitted with the official application TK Required for Provided with application? application SECTION 33.33 (County Staff) (Applicant) X X NOTE to staff: if providing additional comments are provided within the checklist boxes, please distinguish those comments with different color print AND italic/underlined print or some other method that can be distinguished when copied with a black and white YES NO copier/printer. X X A narrative of the project proposal, including its public need or benefit; X X A narrative of the proposed project's consistency with the comprehensive plan, including the land use plan and the master plan for the applicable development area; X X A narrative of the proposed project's impacts on public facilities and public infrastructure. X X A narrative of the proposed project's impacts on environmental features. X X One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; X X Concept Plan: may be the same as the Minor Amendment X X 1) the street network, including circulation within the project and connections to existing and proposed or planned streets within and outside of the project; Need to show pickup/dropoff circulation and traffic flow of buses — no street network is needed or proposed X 2) typical cross -sections to show proportions, scale and streetscape/cross- sections/ci rcu lation; X X 3) the general location of pedestrian and bicycle facilities; May show if applicable, however it does not appear any are proposed or needed X X 4) building envelopes; Does not appear that the building envelope is changing SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2 X X 5} parking envelopes, Zoning will determine the number of parking spaces needed. It is likelythere is already more than sufficient parking X X fi} public spaces and amenities If possibly connecting to proposed greemnay shown in the Comprehensive Plan. This -s not required X ) areas to he designated as conservation and/or preservation areas; X SEE C1.0 S} conceptual: stormwater detention facility locations, NOTES /EMAII, X SEE C1..0 91 conceptual grading-, NOTES /EMAIL X X Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. 'Note, Zoning will determine if SP is required for these uses in G1 zoning district. If no SP is needed, applicant may proceed directly to site plan amendment. If SP is needed, applicant may be able to hold CAC meeting to replace public hearings, given the scale of the proposal and the similarity to surrounding and existing uses. - Parking justification (for how many spaces are needed for the office and private school uses) -Pickup/dropoff circulation and bus traffic flow - Proposed greenspace area converted from parking lot area. Coordinate with Engineering for Floodplain Development Permit. - Attached :SPChecklist. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit, Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains al I information marked on this checklist as required for application. 04-01-19 Signature of person completing this checklist Tod Kanellopoulos 434-296.5832 ext. 3270 SPECIAL USE PERMIT CHECKLIST 0412013 Page 2 of 2 One (1) Completed and Signed Copy of the Checklist for a Special Use Permit