HomeMy WebLinkAboutWPO201600053 Correspondence 2017-11-27Ana Kilmer
From: Ana Kilmer
Sent: Monday, November 27, 2017.2:30 PM
To: David Brockman (dave@oldtrailvillage.com); 'Jeremy Fox' •
Cc: Jennifer Pritchett; Mark Hopkins
Subject: Bond Inspection Request for WPO-2016-00053 - Old Field Upper Subdivision
This is to inform you that when the amendment came in 2016 for the project mentioned above, Matt approved the
amendment on 10/21/2016, but he did not increase the amount of the bond for this project. This project is bonded
under the original WPO numbers:
WPO-2004-00004
WPO-2004-00005
Please update your records.
Thank you
Ana D. Kilmer
Management Analyst
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer@albemarle.org
1
I GEO-TERRAIN ORGANIZATIONi
RINFORMATION':NFiDR"
YOUR GOALS FOUNDED ON U M INC
ATION'.U
Now
November 16, 2017
March Mountain Properties, LLC
Attn: Dave Brockman
1005 Heathcroft Circle
Suite 100
Crozet. Virginia 22932
RE: Pond Embankment 8ackfill Construction
Ballard Pond COT
Albemarle County, Virginia
GTO Project No.:17G-238-084
Dear Mr. Brockman:
As requested,an engineering representative of Geo-Terrain Organization, Inc.(GTO)has visited the above
referenced project site on various occasions to monitor the backfill for the pond embankmentconstructionfortheresidentialdevelopment.
Our staff has exercised the degree of care normally associated with a project of this type. On October 6'n,2017,GTO personnel observed the fill area subgrade. The fill subgrade was observed to be a firm brown
sandy silt that graded downward to saprolitic rock, an impervious subgrade for the embankment
foundation. Once any unstable material was removed, the area was checked for stability utilizing theheavydutyconstructionequipmenton-site. The area appeared to be stable, and backfill operations tofinishsubgradeelevationswereabletobegin.
GTO personnel observed and checked the backfill operations. Appropriate soil samples from the on-site
borrow areas were obtained and transported to our laboratory for moisture-density relationship testingstandardProctor) in general accordance with VTM-1 and ASTM D698. In addition,field density testing
using nuclear methods (ASTM D2922) were performed during soil subgrade backfill placement. Test
results indicate soil backfill placed up to and including November 3rd,2017 appear to conform to project
specifications with regards to in-place densju. Please see the field test results listed below and the
attached laboratory data sheet enclosed for additional information.
Orea
l'ildr)
1 DO-A INTERSTATE BUSINESS PARK FREDERICKSBURG, VA 22405 •OFFICE: 540.368-5724• FAX: 540-368-5725
March Mountain Properties, LLC
Re: Pond Embankment Backfill Construction
Ballard Pond COT
November 16, 2017
Page 2
Summary of Soil Density - Pond Embankment Backfill
Location
Elevation Dry
Below Density Moisture Proctor
PercentAlongSubgradepcf) Dam Number Compaction
it)
N End 5 95.7 22.5 1 95.0
S End 5 99.2 21.6 1 98.5
N End 4 96.0 22.1 1 95.3
S End 4 95.9 21.9 1 95.2
N End 3 100.0 21.0 1 99.3
S End 3 96.5 22.0 1 95.8
N End 2 95.7 23.2 1 95.0
S End 2 97.4 21.7 1 96.7
N End 1 96.8 23.1 1 96.1
S End 1 97.3 22.8 1 96.6
N End 0 96.2 22.7 1 95.5
S End 0 100,2 20.3 1 99.5
Thank you for the opportunity to assist you in this capacity. If you have any questions regarding this
letter, please do not hesitate to contact our office.
Respectfully ., .mired,
t7r.,;.,,,,.
pGeo-Ter r-. iz- on, Inc. z = v"-in up :
Ara'- -4 ~//
j
VG
eZ
P-ter /.ra, P.E. PETER JAMESFAARA d\
Ge. echnical Engineer ' NO.029839
Q mot.
C:/GTO Document Folder/GTO Geotechnical 2017/17G-238-084/Ballard Pond Backfill Letter 11-16-17.d c?".<'pl,/n v it G `c`
a
Moisture-Density Relationship Test
110
I ,
III :..:Lr m tu
105
I 1,i1916% 1
1 1pi I II
i
ra\ I
100
a
MOMME it
11111::1111111taugill0
95 FA pplitik111111111I/111111111 :1111111111111MIII90PIS=1 :
1,• • u n ZAV for1.1...... ,Sp.G. _
85 12.655101520253035
Water content, %
r—-Rock Corrected —p—-Uncorrected
Test specification: ASTMD 698-12 Method A Standard
ASTM D4718-15 Oversize Corr.Applied to Each Test Point
Elev/ Classification Nat
Depth USCS AASHTO Moist Sp.G. LL PI
4 No.200
23.0 2.65 0.9
ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION
Maximum dry density= 100.7 pcf 100.3 pcf Brown sandy Silt and Clay,trace gravel
Optimum moisture= 19.4 % 19.6 %
Project No. 17G-238- Client: March Mountain Properties,LLC Remarks:
Project: Ballard Pond COT
0 Source of Sample: Dam Fill Sample Number: I
Geo-Terrain Organization
Figure
091Iit0 v GINIq.
40490
Waynesboroaynesboro
LANDSCAPE&GARDEN CENTER
P.O. Box 717 • 2032 West Main Street • Waynesboro,VA 22980• Phone 540-942-4646 • Fax 540-949-7743
November 17,2017
Tom Paquette
A.G.Dillard
914 Monticello Road
Charlottesville,VA 22902
Office phone: 434=977-0205
Fax: 434-296-5220
Cell: 540-246-1780
E-Mail: tom@agdillard.com
Re: Upper Ballard Pond Landscape Scope of Work
Waynesboro Landscape Service proposes to furnish labor,materials, and equipment to install the
following scope of landscape work:
Furnish and Install:
Zone 2-3 (2-4 foot o.c. spacing)
200 (two hundred) 1 gal. Hibiscus moscheutos/Marsh Hibiscus
350 (three hundred fifty) 1 gal. Panicum virgatum!Switchgrass
200 (two hundred) 2"plug Typha/Cattail
Zone 1. (18-24 inch o.c. spacing)
2,700 (two thousand seven hundred) Bare Root Elodea canadensis/Water Wood
1,500 (one thousand five hundred) Bare Root Valisneria americana/Wild Celery
Prepared by:
Lee Quillen
AMERICAN ASSOCIATION OF NATIONAL LANDSCAPE VIRGINIA NURSERY&
NURSERYMEN, INC. NURSERYMAN'S ASSOCIATION LANDSCAPE ASSOCIATION
At blt
e
oEtED
tan raw
7' -' aynesboro
LANDSCAPE&GARDEN CENTER
P.O. Box 717 • 2032 West Main Street • Waynesboro,VA 22980• Phone 540-942-4646 • Fax 540-949-7743
November 17,2017
Tom Paquette
A.G.Dillard
914 Monticello Road
Charlottesville,VA 22902
Office phone: 434-977-0205
Fax: 434-296-5220
Cell: 540-246-1780
E-Mail: tom@agdillard.com
Re: Upper Ballard Pond Landscape Scope of Work
Waynesboro Landscape Service proposes to furnish labor,materials,and equipment to install the
following scope of landscape work:
Furnish and Install:
Zone 2-3 (2-4 foot o.c. spacing)
200 (two hundred) 1 gal. Hibiscus moscheutos/Marsh Hibiscus
350 (three hundred fifty) 1 gal. Panicum virgatum/Switchgrass
200(two hundred)2"plug Typha/Cattail
Zone 1 (18-24 inch o.c. spacing)
2,700(two thousand seven hundred)Bare Root Elodea canadensis/Water Wood
1,500 (one thousand five hundred) Bare Root Valisneria americana/Wild Celery
Prepared by:
Lee Quillen
AMERICAN ASSOCIATION OF NATIONAL LANDSCAPE VIRGINIA NURSERY&
NURSERYMEN, INC. NURSERYMAN'S ASSOCIATION LANDSCAPE ASSOCIATION