Loading...
HomeMy WebLinkAboutWPO201400037 Bond Release WPO VSMP 2018-02-12 OF �mn COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434) 296-5832 , Fax(434)972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: / 4 �en&-'h e/c.C,Q Lik /Pi 4/I PLAN/PERMIT NO. tJ/e& ZO/y - 000s 7 DATE: 07 -sa.5 2b/ & This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re-inspection and annual main ance fees invoiced have been paid. Erosion Control In pector Community Development Department All fees invoiced on the above project have been col ected. Director of Community Development/ ounty Engines) �?//I2-/ g Date Date As-built plan was approved by Engineering Division: ; N/A DEQ Termination Date ; N/A Cc: Ana Kilmer Revised 10/16/2017 9 AIM ®oat tesiCounty of Albemarle Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper, Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 9 February 2018 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Albemarle Place Stormwatermanagement Plan TMP: 061 W0-03-00-0190A0 SITE PLAN NUMBER: 2014-03700 FACILITY DESCRIPTION Type(s) and number of BMPs 1 —manufactured BMP (incl.non-structural) 1 —extended detention Description of Outfall drains to VDOT storm system (Ex:24"RCP from 36"CMP riser) Water Quality ® Yes ❑No Design Storm ® 10yr ❑ 2yr Any Additional Information (incl.stream buffer mitigation) A copy of the site plan and details of the BMP(s) are attached. I:\DEET\Community Development\FonnsWspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc