HomeMy WebLinkAboutWPO201400037 Bond Release WPO VSMP 2018-02-12 OF
�mn
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434) 296-5832 , Fax(434)972-4126
STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: /
4 �en&-'h e/c.C,Q Lik /Pi 4/I
PLAN/PERMIT NO. tJ/e& ZO/y - 000s 7
DATE:
07 -sa.5 2b/ &
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all re-inspection and annual main ance fees invoiced have been paid.
Erosion Control In pector
Community Development Department
All fees invoiced on the above project have been col ected.
Director of Community Development/ ounty Engines)
�?//I2-/ g
Date
Date As-built plan was approved by Engineering Division: ; N/A
DEQ Termination Date ; N/A
Cc: Ana Kilmer
Revised 10/16/2017
9
AIM
®oat
tesiCounty of Albemarle
Department of Community Development
Memorandum
To: Ana Kilmer,Management Analyst
Greg Harper, Water Resources Manager
From: Mark Hopkins
Division: Inspections—E&S Control
Date: 9 February 2018
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Albemarle Place Stormwatermanagement Plan
TMP: 061 W0-03-00-0190A0
SITE PLAN NUMBER: 2014-03700
FACILITY DESCRIPTION
Type(s) and number of BMPs 1 —manufactured BMP
(incl.non-structural) 1 —extended detention
Description of Outfall drains to VDOT storm system
(Ex:24"RCP from 36"CMP riser)
Water Quality ® Yes ❑No
Design Storm ® 10yr ❑ 2yr
Any Additional Information
(incl.stream buffer mitigation)
A copy of the site plan and details of the BMP(s) are attached.
I:\DEET\Community Development\FonnsWspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc