Loading...
HomeMy WebLinkAboutWPO201500049 Bond Release WPO VSMP 2017-09-14 pFA pa i COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: (.70-klro'i/fif CCAYPr PLAN/PERMIT NO. 17L/PO 20I S —ctOyq DATE: /L 9211 T I This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control Inspector 2v/V" 6 ALL ��4.� � �/� ,� • no g itP/b0f Community Development Department All erosion control Inspection fees invoiced on the above project have been collected. • Director of Community Development/County Engineer Date Accounting Department • • All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer n LDEP11CommuNY DevetopnenIWonnzVnspealomtROSION CONTROL PERFORMANCE BOND RELEASE REVISEDS 2B 2012.0oc �}}}���A1441_ y '1II I/la' 9/.1air_ 12t4 $/u/ , - n Qe.o /(,ems- STORM WATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: (`/o -1 oOc ' rear PLAN/PERMITNO. W('o LP IS `cacti 9 DATE: t 2 ,Sy (7 • This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control Inspector Accounting Department All erosion control inspection fees invoiced on the above project have been collected. • Chief Accountant Date Cc: Ana Kilmer I:IDEPT1Communily DevelopmenllFormsllnspeclIonsISTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc t tte County of Albemarle Department of Community Development Memorandum To: Ana Kilmer;Management Analyst Greg Harper,Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 12 September 2017 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Claudius Center TMP: 056A2-01-00-07000 SITE PLAN NUMBER: 2015-04900 FACILITY DESCRIPTION Type(s) and number of BMPs '. 1 —manufactured BMP (incl.non-structural) #— [click to select type] • • Description of Outfall drains to storm system (Ex:24"RCP from 36"CMP riser) Water Quality ® Yes ❑No Design Storm ; ❑ 1 Oyr ❑2yr Any Additional Information 1Filtera unit activated. (incl. stream buffer mitigation) A copy of the site plan and details of the BMP(s) are attached. I:DEPTCommunity Development\FormsUnspections\SWM Bond Release Fonn-conversion to permanent swm facility REVISED 3 8 2010.doc