Loading...
HomeMy WebLinkAboutWPO201500049 Bond WPO VSMP 2017-04-10 leterul t.r Oah a-56 DemRemised: 'T�/U^/7 Pee Paid: 44. tlT ��Received A.. �, "' `/���`"'latalce: Forturd to Mattelentent \n,il�.t ✓ ®tt 1 • I BOND INSPECTION REQUEST APPROVED PLAN r# 2OIS- OOO 4 PROJECT NAME: _ 6. O tit)s QUR (As lkted cm the appro+ed plan) This is to request that an inspection be performed by the County. Where tees are assessed. a fee is required for each inspection. Please check the inspections requested. ;11LJ N SMPNESCI' Erosion Control.Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 S250 6.4 0 Subdivision(roads,drainage,etc )per Subdivision Ordinance section 14-435 and 14-438. S269 X,9W 0 Water& Sewer per Subdivision Ordinance section 14-435 $269 'eche Development Performance bond(Incomplete Site Work&Landscape Maintenance) $301 TOTAL FEES /1 Z Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development.401 McIntire Road.North Wing.Charlottesville, VA 22.902,Attention: Management Analyst-Phone 434-296-5832: Fax 434-972-4126. All roads and storrnwater facilities will require construction record drawings, inspection reports.and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance ofall hondcd improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only he made once all site work is complete. I'hc revised estimate should be sent to; EMAIL: YX tW€T1'114 K Q«°,,,„0 Z • OR REGULAR MAII,ADDRESS: (pS35 WOOD 6OV RNt C . Cvt oit7 V v} WC13Z attire of Ovsner'Developer / PreVeva Print Name Date RL-vsse07t15'2t)14 72J2015.1:3:_*.t5