HomeMy WebLinkAboutWPO201400100 Bond Release Stormwater Management Plan 2017-04-17 sr4-1lC,:
�QQ GS�N1\�` County of Albemarle
�G.• ��P\ Department of Community Development
G�-4 Memorandum
Ana Kilmer, Management Analyst
Greg Harper, Water Resources Manager
From: Mark Hopkins
Division: Inspections—E&S Control
Date: 17 April 2016
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Farmington Country Club Dump Regrading Plan
TMP: 060E20-00-00-00100
SITE PLAN NUMBER: 2014-00100
FACILITY DESCRIPTION
Type(s) and number of BMPs 1 — [click to select type]
(incl.non-structural) #— [click to select type]
Description of Outfall Level Spreaders to pipe under train tracks
(Ex:24"RCP from 36"CMP riser)
Water Quality ® Yes ❑No
Design Storm ❑ l0yr ❑ 2yr
Any Additional Information Level Spreaders ar ethe only SWM on site
(incl.stream buffer mitigation)
(04g//7
A copy of the site plan and details of the BMP(s) are attached.
4 5 J /2 r e.se.i t ea
I:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc
STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: f."--7 /11/1/79,1-CM 4 (Al 1/ ✓'y
PLAN/PERMIT NO. ?0/9 —O42tx,
DATE: /7 /7
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all erosion control inspection fees invoiced have been paid.
Erosion Control In ector
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
Cc: Ana Kilmer
I:IDEPT1Community DevelopmenllFormslInspeclionslSTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc
L
4OF Nese
og po
�T r�
:14650;
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
EROSION CONTROL PERFORMANCE BOND RELEASE
PROJECT NAME: �—£f'/'1 /r1 (O�v ji (/ avy rfe,96- efA9
PLAN/PERMIT NO. ?c2/y--CO/OO
DATE: /7 Xi- l 7
This project has been satisfactorily completed and the erosion control performance bond may be
released at this time if all erosion control inspection fees invoiced have been paid.
21.4Lrosion&Control I Spector
I iVt.Q3 F V ip
V f ShiT it
Community Development Department
All erosion control Inspection fees invoiced on the above project have been collected.
Director of Community Development/County Engineer
Date
Accounting Department
All erosion control inspection fees invoiced on the above project have been collected.
Chief Accountant
Date
Cc: Ana Kilmer RitAltik
Nilo).-
I 1DEPT1Commtmlly DevelopmeonFonnsVnspeCl onsIEROSION CONTROL PERFORMANCE BOND RELEASE REVISED 5 29 2012.doc
' 1