Loading...
HomeMy WebLinkAboutWPO201400100 Bond Release Stormwater Management Plan 2017-04-17 sr4-1lC,: �QQ GS�N1\�` County of Albemarle �G.• ��P\ Department of Community Development G�-4 Memorandum Ana Kilmer, Management Analyst Greg Harper, Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 17 April 2016 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Farmington Country Club Dump Regrading Plan TMP: 060E20-00-00-00100 SITE PLAN NUMBER: 2014-00100 FACILITY DESCRIPTION Type(s) and number of BMPs 1 — [click to select type] (incl.non-structural) #— [click to select type] Description of Outfall Level Spreaders to pipe under train tracks (Ex:24"RCP from 36"CMP riser) Water Quality ® Yes ❑No Design Storm ❑ l0yr ❑ 2yr Any Additional Information Level Spreaders ar ethe only SWM on site (incl.stream buffer mitigation) (04g//7 A copy of the site plan and details of the BMP(s) are attached. 4 5 J /2 r e.se.i t ea I:\DEPT\Community Development\Forms\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: f."--7 /11/1/79,1-CM 4 (Al 1/ ✓'y PLAN/PERMIT NO. ?0/9 —O42tx, DATE: /7 /7 This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control In ector Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer I:IDEPT1Community DevelopmenllFormslInspeclionslSTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc L 4OF Nese og po �T r� :14650; COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: �—£f'/'1 /r1 (O�v ji (/ avy rfe,96- efA9 PLAN/PERMIT NO. ?c2/y--CO/OO DATE: /7 Xi- l 7 This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. 21.4Lrosion&Control I Spector I iVt.Q3 F V ip V f ShiT it Community Development Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer RitAltik Nilo).- I 1DEPT1Commtmlly DevelopmeonFonnsVnspeCl onsIEROSION CONTROL PERFORMANCE BOND RELEASE REVISED 5 29 2012.doc ' 1