Loading...
HomeMy WebLinkAboutWPO201500060 Bond Estimates WPO VSMP 2017-01-05 Town&Country Shopping Center,VSMPIWPO201500060 WPO file number- 201500060 Erosion and Sediment Control Bond Estimate Item Item N.9 VIA Unit Cost Cost Number fr>s_Nedl 1 stablaation(PS,1S) 124 acres 35,000 00 $6,20000 2 tree protection O U. Oft 55.00 S0 00 3 silt fence(SF) 350 ft 35.00 31.800.00 4 safety fence(SAF) 180 ft $5.00 $900.00 5 diversion(DD,FD,RWD) 535 ft $13.00 $6,955.00 6 temporary slope drain(TSD) pipe length 0 ft pipe diameter 0 in $0.00 S0.00 7 earthwork for trap WI) 8 height of dam at toe 2 ft cut at high side 3.5 ft 9 height of Si at face 3.5 6 cut at face 3.5 ft 10 length of dam 20 ft length of cut 50 ft 11 top width 2 6 width of cut 30 ft 12 31 5 of (area below transition) 129 5 sf 13 4 ft (total width of cut) 44 ft 14 -1.5 ft (depth below transitior 0 ft 15 -5.25 sf (area above transition 0 sf 16 87.5 cy (total fill volume) 383.7 cy 17 length of spillway 10 ft (TOAL CY estimate) 413 cy $13.00 $5,389.00 18 width of spibway 5 ft (spillway stone tons) 3.5 tons $50.00 S175.00 7 silt fence inlet protection(IP 5 $500.00 8 stone inlet protection(IP) 2 $400.00 9 outlet protection(OP) length 0 ft width 0 ft 0 S0 00 10 channel(SCC,matted) length 0 ft width 0 ft $0.00 11 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 12 construction entrance(CE) 0 $0.00 13 wash rack 1 $2,000.00 14 paved construction entrance 1 $3,500.00 15 rip-rap,Pieced depth 0 ft length 0 ft 18 width 0 (tons) 0 tons $60 00 S0 00 -17 Etter fabric(below nprap) vital 0 length 0.0 0 sy $3 10 SO 00 18 survey and layout(price per 0.1 mi.) area 0 traps and basins 0 $0 00 19 mobilization $500.00 20 stream crossing(computed independently) $0.00 cost sum $28,299.00 •• prof mgmt $4,244.85 ■ ESC_bond_WP0201500060_town&countryja111715 contingency 53,25439 ` Total $35,800 11/17/2015