Loading...
HomeMy WebLinkAboutSUB201900053 Review Comments Easement Plat 2019-04-22COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Easement Plat Review Project: Hillcrest Vineyard and Winery, LLC (Plat) Plan preparer: Tom Shumate, Jr, LS, 1000 W. Main St. Waynesboro, VA 22980 [tom)a,tomshumatesurveyor.com] Owner or rep.: Augusta Professional Park, LLC —P.O. Box 300, Lyndhurst, VA 22952 [mmc inniskr717.net] Plan received date: 29 Mar 2019 Date of comments: 22 Apr 2019 Reviewer: John Anderson Project Coordinator: Andy Reitelbach SUB2019-00053 Engineering easement plat review comments: 1. Sheet 1 a. [14-303.0.] Provide signature panel for the (authorized) county agent. b. For TMPs 60-20 & 20B, either on plat or in Note block (lower left), provide bk.-pg. ref. to most recent real estate record of transfer, or, if most recent, instrument creating parcel. c. Ref. requirements at 14-208.2.C. (image, below /p. 2): i. Include Note at 14-302.B.10.: "The stream buffer(s) shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." ii. [14-302.B.9.] Provide floodplain information. Note may indicate parcels lie in FEMA Zone `X', or similar. iii. [14-302.B.7.] Provide water supply watershed notation. iv. [14-302.B.7.] Provide agricultural /forestal notation. v. Not strictly required: Albemarle requests note stating critical slopes exist on TMPs 69-20 and 69-20B. We suggest showing critical slopes wherever they occur, graphically. Again, this is not a requirement. 2. Sheet 2 a. Include DEQ Guidance Note: text image, below (Note 7. from similar forest /open space easement plat). b. Revise 4.200 Ac. easement label to read 4.200 Acres Forest & Open Space Easement. c. Please include legend /note, S = ? (Nail set, IPS, etc.) 3. Sheet 3 a. Provide TMP information similar to that for TMP 69-20 (sheet 2), for TMP #69-47C. b. Please include legend /note, F = ? (Nail found, IPF, etc.) c. If proposed Extended Detention pond limits are revised, or Ext. Det. Pond outfall routes in a new direction (west, for example), revise proposed easement as needed. d. Provide /label private drainage easement from Ext. Det. Pond outfall to receiving stream, including across Dick Woods Lane 30' easement. [14-43 LA.1.] Engineering Review Comments Page 2 of 2 e. Provide Access between Dick Woods Lane and SWM Facility Easement, such that vehicles may legally access the SWM facility other than by parking on the edge of SR 637. Provide metes /bounds, label as SWM Facility Access Easement, and list acreage. [Ref. same as d.] f. Revise 0.386 Acre Storm Water Pond Easement to read `0.386 Acre [rev. Ac. if needed] SWM Facility Easement.' 14-208.2 C. Plat requirements and documents to be submitted: Sections 14-300, 14-301, 14- 302(A)(1), (2), (3), (4), (5), (6), (11), (14) and (15), 14-302(B)(1), (2), (4), (5), (6), (7), (9) and (10), 14- 303(A), (B), (C), (D), (E), (F), (H), (I), (L), (0) and (P), 14-312 and 14-314_ DEO Guidance Note 7. THE FOREST AND OPEN SPACE EASEMENT IS SUBJECT TO THE GUIDANCE SET FORTH BY DEO IN THE VIRGINIA STORMWA TER MANAGEMENT PROGRAM. THEAREAS WILL REMAIN UNDISTURBED IN A NATURAL, VEGETATED STATE, EXCEPT FOR ACTIVITIES AS APPROVED BY THE LOCAL PROGRAM AUTHORITY, SUCH AS FOREST MANAGEMENT, CONTROL OF INVASIVE SPECIES, REPLANTING AND REVEGETA TING, PASSIVE RECREATIONS (EG. TRAILS), AND LIMITED BUSH -HOGGING TO MAINTAIN DESIRED VEGETATIVE COMMUNITY (BUT NO MORE THAN FOUR TIMES A YEAR, EXCEPT AS PERMITTED BY EXISTING EASEMENTSAND AGREEMENTS). FURTHER, THE CONSTRUCTION, INSTALLATION, RELOCATION, REPAIR, REPLACEMENT, OPERATION, AND MAINTENANCE OF NEW OR EXISTING PUBLIC UTILITY STRUCTURES AND FACILITIES SHALL BE PERMITTED WITHIN THE FOREST AND OPEN SPACE EASEMENTS AND ACCESS TO SUCH STRUCTURES AND FACILITIES SHALL BE PERMITTED AS DESCRIBED IN EXISTING AND FUTURE UTILITY EASEMENTS AND AGREEMENTS. 14-431.A.1 Sec. 14-431 Easements for stormwater management facilities and other control measures. The agent shall require each subdivider to establish easements for stormwater management facilities and other control measures, as follows: A. The following easements shall be required: 1. An easement for all stormwater management facilities and other control measures located on the property shall be established whenever the improvement is designed and/or constructed beyond a street right-of-way or access easement, and shall extend from all drainage outfalls to an adequate channel as defined in 4 VAC § 50-30-10 that satisfies the minimum standards in 4 VAC § 50- 30-40(19) to the boundary of the property. SUB201900053 Hillcrest Vineyard & Winery LLC 042219