HomeMy WebLinkAboutARB201700136 Correspondence 2018-01-12 Brent Nelson
From: Brent Nelson
Sent: Friday,January 12, 2018 7:21 PM
To: 'mrolds17@yahoo.com'
Subject: ARB 2017-136, M Clinic Sign
Hi Randy- I just wanted to let you know that I am reviewing this ARB sign application and will be getting back to you
next week.
Brent
Brent Nelson
Senior Planner
Albemarle County
Department of Community Development
Planning Services Division
434-296-5832 ext. 3438
bnelson@albemarle.org
i
Brent Nelson
From: Randy Smith <mrolds17@yahoo.com>
Sent: Wednesday,January 17, 2018 10:46 PM
To: Brent Nelson
Subject: Re:ARB 2017-136, M Clinic Sign, Staff Comments
Mr Brent Nelson
I have forwarded this to the graphic art department for the required changes.
Thank You
Randy Smith
On Jan 17, 2018, at 4:26 PM, Brent Nelson<bnelson@a,albemarle.org>wrote:
Hi Randy,
I have reviewed your above-noted sign application. The following revisions are requested to make the
proposal consistent with the Entrance Corridor Sign Guidelines.
1. Revise the sign drawing by:
a. Adding text indicating the channel letter face color is to be white.
b. Adding text indicating the proposed channel letter return color. Approved
Comprehensive Sign Criteria for Albemarle Square require that it either match the white
face color or be bronze or black.
c. Adding the following text regarding raceway color: "The raceway color shall match the
color of the wall to which it is attached."
d. Indicating the distance from the bottom of the sign to the bottom of the red sign band
beneath and from the top of the sign to the top of the red sign band (directly above the
"L" letter).
e. Adding the following text limiting the intensity of LED illumination: "The level of
illumination provided by the LED lights will not exceed the illumination produced by a
single stroke of 30 milliamp(ma)neon."
f. Adding a latest revision date.
Please respond by email within 15 days of the date of this email indicating whether you will or will not
proceed with these revisions. Your decision to make the revisions will suspend the 60-day review period
associated with your original submittal. If you choose to complete the revisions, please email the revised
drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your
application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the
application without further revisions.
If you have any questions about this action, please contact me as soon as possible.
Brent
Brent Nelson
Senior Planner
Albemarle County
1
Brent Nelson
From: Randy Smith <mrolds17@yahoo.com>
Sent: Thursday, January 18, 2018 12:51 PM
To: Brent Nelson
Subject: Re: ARB 2017-136, M Clinic Sign, Staff Comments
Attachments: M CLINIC PROOF 1_18_18.pdf
Mr Brent Nelson
Attached is the revised sign drawings for the M Clinic sign at Albemarle Square. Let me know of any other
changes or corrections. If you have any question; Feel free to call or e-mail me anytime.
Thank You
Randy Smith
On Jan 17, 2018, at 4:26 PM, Brent Nelson<bnelson@albemarle.org>wrote:
Hi Randy,
I have reviewed your above-noted sign application. The following revisions are requested to make the
proposal consistent with the Entrance Corridor Sign Guidelines.
1. Revise the sign drawing by:
a. Adding text indicating the channel letter face color is to be white.
b. Adding text indicating the proposed channel letter return color. Approved
Comprehensive Sign Criteria for Albemarle Square require that it either match the white
face color or be bronze or black.
c. Adding the following text regarding raceway color: "The raceway color shall match the
color of the wall to which it is attached."
d. Indicating the distance from the bottom of the sign to the bottom of the red sign band
beneath and from the top of the sign to the top of the red sign band (directly above the
"L" letter).
e. Adding the following text limiting the intensity of LED illumination: "The level of
illumination provided by the LED lights will not exceed the illumination produced by a
single stroke of 30 milliamp(ma)neon."
f. Adding a latest revision date.
Please respond by email within 15 days of the date of this email indicating whether you will or will not
proceed with these revisions. Your decision to make the revisions will suspend the 60-day review period
associated with your original submittal. If you choose to complete the revisions, please email the revised
drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your
application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the
application without further revisions.
If you have any questions about this action, please contact me as soon as possible.
Brent
Brent Nelson
1