HomeMy WebLinkAboutARB201800072 Correspondence 2018-06-06 ¢r PROJECTCIVIL MANENGINEERINGAGEMENT
H ''.4 `:
LAND PLANNING
ENGINEERING
C)
June 6, 2018
Margaret Maliszewski
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Regarding: RE: Pantops Corner Hotel Site
Dear Margaret,
Please find attached with this letter 6 packets of the Pantops Corner ARB submittal that was
requested.
Best Regards,
Kelly Strickland
Shimp Engineering, P.C.
Aork:k4c 1460 -40
Pacarei- Af2-5 covimAi4)-k-Af—
iM
14n kAAW ;x_ eixAel Jan L_Cu- 1 t^a
.c1" cv(t4V)3 �
(!95 ' k
IoF A
s awl*
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
May 25, 2018
Justin Shimp
Shimp Engineering
201 East Main Street, Suite M
Charlottesville, VA 22902
RE: ARB-2018-72: Pantops Corner
Dear Mr. Shimp,
The above-noted application for an Initial Site Plan been scheduled for the Albemarle County
Architectural Review Board meeting to be held on July 2, 2018. This meeting will begin at 1:00 p.m. in
Room 241 of the County Office Building at 401 McIntire Road, Charlottesville, Virginia.
Staff's recommendations on the application will be available approximately one week prior to the meeting
date identified above. Please note that if architectural designs are included in staff's review of this item,
the item will not be placed on the consent agenda.
If you have any questions,please feel free to contact me.
Sincerely,
,htipta 4A:
Margaret Maliszewski
Chief of Planning/Resource Management
cc: Pantops Corner LC C/O Henry Liscio Company
12704 Crimson Court Suite 101
Henrico Va 23233
File
4Al COUNTY OF ALBEMAR
uu Department of Community Development
we 401 McIntire Road,North Wing
'� _ Charlottesville,Virginia 22902-4596
.
IRGI:31P
434-296-5832
ALBEMARLE COUNTY ARCHITECTURAL REVIEW BOARD
TENTATIVE Agenda for July 02, 2018
ALBEMARLE COUNTY OFFICE BUILDING
1:00 PM — Room 241
NOTE: Plans and other items submitted for the regular review items listed below are available for viewing at the
County Office Building. If you are interested in viewing these documents, please contact the Department of
Community Development using the information listed in the letterhead.
1. Call to order
2. Establish a Quorum
3. Disclosures
4. Public Comment
5. Consent Agenda
6. Regular Review Items
a. SDP-2018-72: Pantops Corner Hotel
it: '
_�.._.._- ' Contact: Justin Shimp
i..
7. Work Session
a. SDP-2018-72: Pantops Corner—Building A
8. Other Business
a. Better Living: Material/color changes
b. Entrance Corridor Design Guidelines: Glass
c. Minutes:
d. Next ARB Meeting: July16, 2018
9. Adjournment
Consent Agenda
NOTES REGARDING PUBLIC MEETINGS
1. Each applicant is allowed to make a single presentation not exceeding 15 minutes in length.The applicant may divide the 15-minute allotment
among various presenters,but the total presentation time will not exceed 15 minutes.
2. Each member of the general public who wishes to speak on a matter shall be allowed one appearance not to exceed 3 minutes.
3. Any person aggrieved by any decision of the Architectural Review Board may demand a review of the application by the Board of Supervisors.
Such demand shall be made by filing a request therefore in writing with the clerk of the Board of Supervisors within ten calendar days of the date
of such decision.For additional information see section 30.6.8 of the Zoning Ordinance.
NOTES REGARDING ARB ACTIONS
1 Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid.If there is no site plan required for the
proposed work,the Certificate of Appropriateness is valid for 3 years.Applicants requesting an extension of the period of validity must do so in
writing.The letter must be received by the Director of Planning prior to the expiration date.
Margaret Maliszewski
From: Kelly Strickland <kelly@shimp-engineering.com>
Sent: Thursday, August 02, 2018 4:03 PM
To: Margaret Maliszewski
Cc: Nitin Kulkarni;justin@shimp-engineering.com; Michael McGowan
Subject: FW:ARB-2018-72-ARB action Response: Proposed Hotel at Pantops Corner.
Attachments: pantops corner action letter.pdf; Pantops Corner Initial Site Plan (ARB) Resubmittal
(08-02-18).pdf
Hello Margaret,
Here is a digital copy of the updated grading and utilitiy and landscape sheets from the Pantops Corner Initial Site Plan.
I'll drop off the hard copies to you as soon as they return from the printer.
Let us know if you need anything further.
Thanks,
Kelly Strickland
Shimp Engineering PC
434.981.6029
From: Nitin Kulkarni [mailto:dgnclave@gmail.com]
Sent: Wednesday, August 01, 2018 2:29 PM
To: 'Kelly Strickland'
Subject: FW: ARB-2018-72- ARB action Response: Proposed Hotel at Pantops Corner.
NITIN KULKARNI AIA
From: Nitin Kulkarni<dgnclave@gmail.com>
Sent:Wednesday, August 1, 2018 9:19 AM
To: 'Margaret Maliszewski' <MMaliszewski@albemarle.org>; 'Justin Shimp, P.E.'<Justin@shimp-engineering.com>
Cc: 'Mike McGowan' <mcgowan1950@gmail.com>; 'Tarun Patel'<tpatel@revparco.com>
Subject:ARB-2018-72-ARB action Response: Proposed Hotel at Pantops Corner.
Dear Margaret,
Thank you for providing a quick recap of the points discussed during the last work session. We have revised the hotel
building design to address the comments discussed during the last session and we hope this will satisfy the committee's
expectations.
The building is redesigned to respond to Rt. 20 as well as the internal bypass road with an angled plan. We have
designed the building as well as landscape elements like walkway, patios, storefronts, etc. at the short end of the
building creating an effective "Front"to address the bypass road effectively.
As you can see, the landscaping and grading is also updated to follow the EC guidelines minimizing the height impact of
the building by creating the "terracing" blended with landscaping facing the internal bypass road.
The towers are now redesigned to be identified better by transferring their"Visual weight" to the ground.
The brick facade is now redesigned to avoid the horizontal separation of the building mass and to blend and relate the
building elements more effectively.
Justin will forward you the revised landscaping proposal with is complimentary to this revised design by a separate email
and we will try our best to deliver the prints of both building and site to your office by Aug rd.
We will see you on August 6th during the upcoming work session.
1
*ay 4180'
Thank you.
Sincerely,
NITIN KULKARNI AIA NCARB
Cell +1-804-514-2455
Phone +1-804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination,copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Nitin Kulkarni,
AIA is not responsible for any undetectable alteration,transmission error,conversion,media degradation,software error,or interference with this
transmission
From: Margaret Maliszewski<MMaliszewski@albemarle.org>
Sent:Tuesday,July 17, 2018 5:12 PM
To:Justin Shimp, P.E. <iustin@shimp-engineering.com>
Cc: Mike McGowan<mcgowan1950@gmail.com>; Nitin Kulkarni<dgnclave@gmail.com>; 'Tarun Patel'
<tpatel@revparco.com>
Subject:ARB action
Dear Applicants,
The action letter from yesterday's ARB meeting is attached. Please let me know if you have questions.
Thanks.
Margaret
Margaret Maliszewski, Chief of Planning/Resource Management
Albemarle County Department of Community Development
401 McIntire Road
Charlottesville,VA 22902
434-296-5832 x3276
mmaliszewski@albemarle.org
2
Margaret Maliszewski
From: Heather McMahon
Sent: Friday, July 13, 2018 10:46 AM
To: Justin Shimp, P.E.
Cc: Michael McGowan; Peter Russell; Margaret Maliszewski
Subject: RE: ARB Section
Thank you for sending the files from Nitin as well as this last exhibit. I will send them all to the ARB now.
Thanks,
Heather McMahon, Senior Planner
Albemarle County Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 x3278
hmcmahon@albemarle.org
From:Justin Shimp, P.E. [mailto:justin@shimp-engineering.com]
Sent: Friday,July 13, 2018 10:40 AM
To: Heather McMahon <hmcmahon@albemarle.org>
Cc: Michael McGowan <mcgowan1950@gmail.com>; Peter Russell <peter@shimp-engineering.com>; Margaret
Maliszewski<MMaliszewski@albemarle.org>
Subject: Re: ARB Section
Hello Heather,
Here is the last one. Thanks!
Justin Shimp, P.E.
434-953-6116
On Jul 13, 2018, at 10:22 AM, Heather McMahon <hmcmahona,albemarle.org>wrote:
Hi Justin,
Margaret is out today and I have to pick this up where she left off; I don't know what you mean by the
"files from Nitin;" could you please send those to me so that I can pull them together with this cross
section and the exhibit Peter is going to send me so that I may email everything you want the ARB to
have for Monday together?
Thanks,
Heather McMahon, Senior Planner
1
Now *of
Albemarle County Department of Community Development
401 McIntire Road
Charlottesville,VA 22902
434-296-5832 x3278
hmcmahon@albemarle.org
From:Justin Shimp, P.E. [mailto:Justin@shimp-engineering.com]
Sent: Friday,July 13, 2018 10:14 AM
To: Heather McMahon <hmcmahon@albemarle.org>
Cc: Michael McGowan <mcgowan1950@gmail.com>; Peter Russell <peter@shimp-engineering.com>
Subject: Fwd: ARB Section
Hi Heather,
Got your email, We should have this cross section, the files from Nitin and then one more exhibit
of a proposed terrace entrance at the end of the Hotel that Peter will send you in just a few mins.
Thanks,
Justin Shimp, P.E.
434-953-6116
Begin forwarded message:
From: Justin Shimp <justin@shimp-engineering.com>
Subject: Fwd: ARB Section
Date: July 13, 2018 at 7:17:03 AM EDT
To: Margaret Maliszewski <MMaliszewski�7@albemarle.org>
For Monday's meeting
Sent from my iPhone
Begin forwarded message:
From: Kathleen Adams <kathleen@shimp-engineering.com>
To: Justin Shimp <iustin@shimp-cngineering.com>
Subject: Re: ARB Section
updated
On Thu, Jul 12, 2018 at 4:52 PM, Kathleen Adams
<kathleen(a@shimp-engineering.com> wrote:
2
Am still wo`leing on color but its taking longer than expected. So
for now its attached.
K;il \d,0,1,
Shimp Engineering P.C.
Kathleen N.Adams
Shimp Engineering P.C.
3
Now
Margaret Maliszewski
From: Nitin Kulkarni <dgnclave@gmail.com>
Sent: Friday,July 13, 2018 8:29 AM
To: Margaret Maliszewski
Cc: Cameron Langille; 'Tarun Patel'; 'Justin Shimp'; 'Michael McGowan'; 'Kelly Strickland'
Subject: Revised building submittal for conceptual review of the Architectural Design: Pantops
Corner Hotel building C 'Ville for July 16th meeting.
Attachments: Holiday_Pantops-REVISED_BUILDING_PRELIM-ARB_PLANNING-7-16-2018.pdf
Hello Margaret,
See attached revised preliminary ARB review document for ARB on Monday 16th.
We have not included this in the civil/site development package as the primary objective of this meeting is to get the
site plan elements discussed and approved. Also did not want to derail the conversation on building instead of site plan.
This presentation shows two options, one from last presentation with sloping roof and the new one generated in
response with flat roof.
We will carry this in print format on Monday, but just wanted to give you heads up on the comments heard during the
last meeting and our response in design:
I think it addresses most of the concerns ARB has raised during preliminary presentation namely,
1. Fewer materials: Shingles on roof and stone columns at canopy removed. Now we have brick,two color EIFS,
wood and metal flashing/coping only.
2. Lesser height impact due to flat roof
3. Better defined towers due to elimination of sloping roof
4. Canopy not inclined to avoid lighting infiltration
5. Simplified massing
Hope this will help satisfy ARB committee from their last set of comments. I look forward to see you on Monday.
Thank you.
NITIN KULKARNI AIA NCARB
Cell. +1-804-514-2455
Phone +1-804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination, copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Nitin Kulkarni,
MA is not responsible for any undetectable alteration,transmission error,conversion,media degradation,software error,or interference with this
transmission
From: Nitin Kulkarni<dgnclave@gmail.com>
Sent:Tuesday,June 5, 2018 8:20 AM
To: 'Margaret Maliszewski'<MMaliszewski@albemarle.org>
Cc: 'Cameron Langille'<blangille@albemarle.org>; 'Tarun Patel'<tpatel@revparco.com>; 'Nick Patel'
<npatel@kalyanhospitality.com>; 'Justin Shimp' <justin@shimp-engineering.com>; 'Michael McGowan'
<mcgowan1950@gmail.com>; 'Kelly Strickland' <kelly@shimp-engineering.com>
Subject: Final submittal for conceptual review of the Architectural Design: Pantops Corner Hotel building C 'Ville
Margaret,
1
Per your advice,we are planning to hand deliver these prints(6 copies 11x17) inext couple of days while meeting the
deadline for July 2nd review of the initial design. I am sending this PDF copy,just in case if you want to use this to project
on the projector during your internal meeting.
Please let me know what additional information ARB committee will be looking for, so that we can be prepared for July
2nd meeting?
Thank you and look forward to hear back soon.
N ITI N KU LKARN I M ARCH NCARB AlA
Principal
DESIGN ENCLAVE CONSULTANTS LLC
Glen Allen VA 23059
Cell. 804-514-2455
Ph 804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination,copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Design Enclave
Consultants is not responsible for any undetectable alteration,transmission error,conversion,media degradation,software error,or interference
with this transmission
From: Margaret Maliszewski <MMaliszewski@albemarle.org>
Sent:Wednesday, May 30, 2018 1:56 PM
To: Nitin Kulkarni<dgnclaveCc@gmail.com>
Cc:Cameron Langille<blangille@albemarle.org>; 'Tarun Patel'<tpatel@revparco.com>; 'Nick Patel'
<npatel@kalyanhospitality.com>; 'Justin Shimp' <lustin@shimp-engineering.com>; 'Michael McGowan'
<mcgowan1950@gmail.com>
Subject: RE: Revised submittal for preliminary review attached: Pantops Corner Hotel building C 'Ville
Nitin,
I'll plan on including the architectural review with the July 2 agenda item. 11 x 17 is OK for this submittal. I'll be treating
it as a conceptual review of the architectural design.
Margaret
From: Nitin Kulkarni<dgnclave@gmail.com>
Sent:Wednesday, May 30, 2018 12:29 PM
To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Cc: Cameron Langille<blangille@albemarle.org>; 'Tarun Patel' <tpatel@revparco.com>; 'Nick Patel'
<npatel@kalyanhospitality.com>; 'Justin Shimp' <Justin@shimp-engineering.com>; 'Michael McGowan'
<mcgowan1950@gmail.com>
Subject: RE: Revised submittal for preliminary review attached: Pantops Corner Hotel building C'Ville
Hello Margaret,
Thank you for your response. I think if you are ok, we definitely want to move ahead with July 2nd review of the initial
design.
I will work with our team to include the paper copies of the Architectural set to be delivered to your office by June 8tn
Are 11x17 size ok?
We will definitely work on the materials and will try to present a material board during the presentation if not ready by
June 8th
As I mentioned, these are the preliminary renderings and once we hear out ARB comments on preliminary,we will try to
work with these comments to create the revised final following that.
Thank you and look forward to go through this process with your positive recommendations.
Cameron,
Do you have any comments from site plan,setback/step-back compliance? Look forward to hear from you too.
2
Nape
Thank you all.
NITIN KULKARNI M ARCH NCARBA/A
Principal
DESIGN ENCLAVE CONSULTANTS LLC
Glen Allen VA 23059
Cell: 804-514-2455
Ph: 804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination,copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Design Enclave
Consultants is not responsible for any undetectable alteration,transmission error,conversion,media degradation,software error,or interference
with this transmission
From: Margaret Maliszewski<MMaliszewski@albemarle.org>
Sent:Wednesday, May 30, 2018 11:45 AM
To: Nitin Kulkarni<dgnclave@gmail.com>
Cc:Cameron Langille <blangille@albemarle.org>
Subject: RE: Revised submittal for preliminary review attached: Pantops Corner Hotel building C'Ville
Hello, Nitin.
Thanks for sending the revised architectural information. The drawings addressing visibility are very helpful, as
I think the removal of the stepped gable is an improvement. However, I think that there are still potential issues
with the number of materials, the number of building forms, and coordination among building forms and roof
forms in the updated version of the design.
The Initial Site Plan is scheduled for ARB review on July 2. Since the building design is this far along, I
recommend including this design with the initial plan for ARB review, so that you can get some direct input
from the ARB on the architecture. To do this, I need 6 paper copies of the architectural drawings. Please
provide these by 5 PM on June 8.
Please let me know if this is how you would like to proceed.
Thanks.
Margaret
From: Nitin Kulkarni<dgnclave@gmail.com>
Sent:Tuesday, May 22, 2018 1:07 PM
To: Margaret Maliszewski<MMaliszewski@albemarle.org>
Subject: RE: Revised submittal for preliminary review attached: Pantops Corner Hotel building C 'Ville
Thank you Margaret. Look forward to hear back your comments, so that we care prepare.
NITIN KULKARNI AIA
From: Margaret Maliszewski<MMaliszewski@albemarle.org>
Sent:Tuesday, May 22, 2018 1:04 PM
3
*140
To: Nitin Kulkarni<dgnclave@gmail.ccoom>
Subject: RE: Revised submittal for preliminary review attached: Pantops Corner Hotel building C 'Ville
Nitin,
Thanks for the information. I have a backlog of review items following a week-long conference, so it will take me some
time to get to this. I'll get back to you as soon as possible.
Margaret
From: Nitin Kulkarni<dgnclave@gmail.com>
Sent:Thursday, May 17, 2018 1:49 PM
To: Cameron Langille<blangille@albemarle.org>; Margaret Maliszewski<MMaliszewski@albemarle.org>; William
Gilbert<WGILBERT(albemarle.org>
Cc: 'Michael McGowan' <mcgowan1950@gmail.com>; 'Amir Patel'<amir@tankkgroup.com>; 'Nick Patel'
<npatel@kalyanhospitality.com>; 'Justin Shimp' <justin@shimp-engineering.com>
Subject: Revised submittal for preliminary review attached: Pantops Corner Hotel building C 'Ville
In response to our meeting at your office on Monday,April, 30th, 2018 we have updated and attached the revised
submittal for your review for the proposed hotel building with this email.
Some of the reference points in our discussion, which are addressed in this presentation are:
1. Alternate elevation (Option-1) with elimination of the stepped gable wall referred by you as "Non-C'-Ville"
character. For your and everybody's reference,we have included both the options. (Optioni-2 being the stepped
gable option)
2. We have added a three story extension to the main building block to comply with the "Step back requirement"
discussed during our meeting.
3. As you can see in the revised site plan, we have eliminated the road connection to the rear parking of the hotel,
which has eliminated all the retaining walls next to hotel and added the connection to the parking on the East of
the hotel. (Sorry,the north arrow is missing on the site plan but hotel is facing South towards US Route 250)
4. Slides#3 demonstrate the visibility of the hotel building from US Route 250. As you can see, any buildings
facing the Route 250 in the front portion of this plot will block the visibility of the hotel completely. It is only
when you are passing between these buildings when you are driving on 250 from East to West,you will see this
building.
5. Slide#4 demonstrates that this hotel from a narrow window when you come against the access road to the site.
Also the grading section shows the hotel will be set on level which is more than one story below the entry point
to the site, making only 3.5 to max 4 stories visible from US Route 250.
6. Please note that we have not added any landscape development to these slides, as that part is still in the works.
Once that design is complete, we will render these images with more context to the site development for final
ARB presentation.
Please feel free to advise us if you need any additional information to prepare for ARB to go with your positive
recommendation.Your help is well appreciated.
As mentioned before referring conversation to Margaret, please review the building placement and compliance with the
"step back" requirement of the hotel building. Hope you agree with our interpretation that we may not need to apply
for the variance.Also elimination of the front connector from Stony point side to the rear parking area of the hotel gives
up more continuity to the hotel parking using the east side connector to the front and rear parking of the hotel, which is
better from operations point of view.
Owners have chosen not to show any buildings in the front portion of the property, as for obvious reason that they are
still working on different options and do not want to block everyone in a wrong visual. But we all know definitely there
will be buildings in the front and they will be reviewed by you and the ARB team when they are ready for development.
4
Niue
Thank you all for your support and we look forward to work with you on this exciting project!
NITIN KULKARNI MARCH NCARB A/A
Principal
DESIGN ENCLAVE CONSULTANTS LLC
Glen Allen VA 23059
Cell: 804-514-2455
Ph 804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination,copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Design Enclave
Consultants is not responsible for any undetectable alteration, transmission error,conversion,media degradation,software error,or interference
with this transmission
From: Nitin Kulkarni <dgnclave@gmail.com>
Sent: Monday, April 30, 2018 8:38 AM
To: 'Cameron Langille' <blangille@albemarle.org>; 'Amir Patel'<amir@tankkgroup.com>; 'Michael McGowan'
<mcgowan1950@gmail.com>
Cc: Margaret Maliszewski (mmaliszewski@albemarle.org) <mmaliszewski@albemarle.org>
Subject: Pantops Corner Hotel building: Monday meeting in C'Ville
Cameron,
Thank you. Can you pass this on to Margaret for today's meeting?We think this gives a better picture of what we want
to do with the hotel building.
See you all at 11.00 today.
Thank you.
NITIN KULKARNI M ARCH NCARB A/A
Principal
DESIGN ENCLAVE CONSULTANTS LLC
Glen Allen VA 23059
Cell: 804-514-2455
Ph: 804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination,copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Design Enclave
Consultants is not responsible for any undetectable alteration,transmission error,conversion,media degradation,software error,or interference
with this transmission
From: Cameron Langille<blangille@albemarle.org>
Sent: Wednesday, April 25, 2018 4:21 PM
To: Nitin Kulkarni<dgnclave@gmail.com>; 'Amir Patel'<amir@tankkgroup.com>; 'Michael McGowan'
<mcgowan1950@gmail.com>
Subject: RE: Monday meeting in C'Ville
Hi Nitin,
Thanks for sending me the rendering. I have forwarded it to Margaret Maliszewski, one of the ARB planners who will be
at the meeting on Monday. Margaret will speak more about ARB requirements on Monday and she can address the
question about whether the treatment is acceptable.
-Cameron
5
i1ri+' .yam
From: Nitin Kulkarni<dgnclave@gmail.com>
Sent:Wednesday,April 25, 2018 4:01 PM
To: Cameron Langille<blangille@albemarle.org>; 'Amir Patel' <amirCa@tankkgroup.com>; 'Michael McGowan'
<mcgowan1950@gmail.com>
Subject: RE: Monday meeting in C'Ville
Cameron,
We have just started looking at this project and do not have much to present to ARB. I am familiar with the process as
we have gone through while working on another project on Pantops few years back. Attached is the franchise rendering
for this brand we are doing here, but not sure ARB will be receptive of this Architectural treatment.
I would say let us wait and hear out from them what they expect of us and then prepare something, which they will like
in the first go around? Let us know if you have a strategy to approach them as you will probably dealing with other office
buildings too?
We will have site plan and if needed building plans at this point.
NITIN KULKARNI M ARCH NCARB AIA
Principal
DESIGN ENCLAVE CONSULTANTS LLC
Glen Allen VA 23059
Cell: 804-514-2455
Ph• 804-200-4085
This communication is confidential and intended only for the recipient(s). Any other use,dissemination,copying,or disclosure of this
communication is strictly prohibited.If you have received this communication in error,please notify us and destroy it immediately.Design Enclave
Consultants is not responsible for any undetectable alteration,transmission error,conversion,media degradation,software error,or interference
with this transmission
From: Cameron Langille<blangille@albemarle.org>
Sent:Wednesday,April 25, 2018 3:36 PM
To:Amir Patel <amir@tankkgroup.com>; Michael McGowan<mcgowan1950Ca@gmail.com>
Cc: Nitin Kulkarni<dgnclave@gmail.com>
Subject: RE: monday
Good Afternoon,
The address of our office is 401 McIntire Road, Charlottesville,VA 22902. Come in through the door that has the
"Community Development" lettering over top and let the front desk personnel know you're here for a meeting with
Cameron.
Also, are there any architectural renderings that can be shared with us in advance of the meeting? This is particularly
helpful for the ARB staff to see ahead of the meeting.
-Cameron
From:Amir Patel<amir@tankkgroup.com>
Sent:Wednesday,April 25, 2018 9:17 AM
To: Michael McGowan<mcgowan1950@gmail.com>
Cc: Nitin Kulkarni<dgnclave@gmail.com>; Cameron Langille<blangille@albemarle.org>
Subject: Re: monday
6
Cameron can you send us the addrest of the meeting on Monday at 11. Thanks. Amir
Sent from my iPhone
On Apr 25, 2018, at 8:52 AM, Michael McGowan<mcgowan1950 cr gmail.com>wrote:
Amir and Nitin,
Cameron is co-ordinating Monday's meeting. Please communicate directly with him to simplify
things.
Thanks All,
M
Michael McGowan
434 8068549