HomeMy WebLinkAboutWPO201700036 Review Comments As-Built Reviews 2019-04-25COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project title: Project file number: Plan preparer: Owner or rep. Plan received date: Rev. 1 received date: Date of comments: Rev. 1 comments: Reviewers: Michelle & Barry, VSMP Permit plan review Rivanna Solid Waste Authority New Ivy Solid Waste Transfer Station WP0201700036 — Amendment 1 (AS -BUILT REVIEW) design: SCS Engineers — Anthony Tomlin [ttomlin@scsengineers.com] As -built: Lincoln Surveying RSWA — Phillip McKalips [PMcKalips@rivanna.org] Michelle Simpson[msimpson@rivanna.org] Barry Hertzler — Project Manager [BHertzler@lantzcc.com] 28 Nov 2018 19 Apr 2019 11 Dec 2018 25 April 2019 Emily Cox See updated comments below. We received as -built drawings for the above referenced plan. In order to process these as-builts and close out the DEQ general construction permit, the items below need to be addressed. It is our understanding that some items have been shared with the County inspector, John Yerby, however, please provide all items in one, concise package for review. If you have any questions, feel free to contact me. 1. Provide a bond inspection request form. Since this is a County project, there is no fee associated, but the application is still necessary. Form can be found here: http://www.albemarle.org/upload/images/forms_center/departments/Community Develop ment/forms/bonds/Bond_ Inspection_ Request_Form.pdf Rev. 1: Comment addressed. 2. Termination form: https://www.deq.vir ig nia.gov/Portals/O/DEQ/Water/Publications/CGPNoticeofrerminatio n20l4.pdf Rev. 1: Comment addressed. Ensure all applicable items in the following checklist are provided: http://www.albemarle.org/upload/ima,ges/forms_center/departments/Community Develop ment/forms/applications/WPO_VSMP_Construction _ Record_ Drawings Policy 23MU20 14.pdf It appears the following items are still necessary: a. Inspection records. b. Geo-coordinates of all facilities. c. Verified drainage area maps. Engineering Review Comments Page 2 of 3 d. As -built profiles (as -built plan -view was provided). e. Computations or verification/certification that as -built is equivalent or better than design. (Per County code 17-422-D....."...certifying that the stormwater management facility has been constructed in accordance with the approved plan.." f. Ditch lines on as -built. g. Material layers. Rev. 1: Comment addressed. 4. See attached pictures. Structure Al2 has a pipe outfalling directly into it. This is not shown on the approved plans or the as -built. Where is this pipe coming from? Is it the outfall of the trench drain? Please have your engineer review as this is not allowed. If the water is supposed to be going into the sand filter, it obviously is not. If the water is allowed to be bypassed, it should be tied into the structure, not outfalling on top. I ....... 1 ,. =�r �� _ 1 ,�yf�'�.. ,�F.a��'�.a.=�'�.t�d'-fix 5—'_•. -_ .,. .. \T-. .