HomeMy WebLinkAboutARB201900038 Staff Report 2019-04-30ARCHITECTURAL REVIEW BOARD STAFF REPORT
Project #/Name
ARB-2019-38: 6181 Rockfish Gap Office Expansion
Review Type
Preliminary Site Development Plan
Parcel Identification
055000000109AO
Location
6181 Rockfish Gap Turnpike, Crozet
Zoned
Highway Commercial (HQ, Entrance Corridor (EC)
Owner/Applicant
6181 Rockfish Gap Turnpike LLCBalzer & Associates, Inc. (Kent O'Donohue)
Magisterial District
White Hall
Proposal
To construct a parking area with 26 spaces and associated site improvements on 1.10 acres as well as two additions to
an existing building: a 950 square -foot rectangular volume to the east and a 2,650 square -foot rectangular volume to
the southeast, in the rear. The existing fagade will be renovated to be consistent with the new fagade.
Context
Located on the south side of Rockfish Gap Turnpike (Rt. 250), west of Pro Re Nata Brewery and east of the new
F&R office building and Rt. 797 (Hillsboro Lane). [Figure 1] While the land immediately north of the parcel is rural
and residential, this parcel is on the western edge of a commercial strip that includes three gas stations and a tractor
repair shop. The buildings are primarily single story, while nearby Restore N' Station is a two-story building.
Visibility
The building is clearly visible from the EC (Rt. 250/Rockfish Gap Turnpike).
ARB Meeting Date
May 6, 2019
Staff Contact
Heather McMahon
PROJECT HISTORY
DATE
APPLICATION/REVIEW TYPE
RESULT
9/20/2011
ARB-2011-91: Froehling & Robertson, Inc. Out
ARB staff reviewed and approved a County -wide Certificate of
Buildin Addition - Minor
Appropriateness for the addition of a re -fabricated shed to the site.
5/6/2019
ARB-2019-38: 6181 Rockfish Gap Office
The ARB will review this Preliminary Site Plan and Preliminary
Ex ansion, Preliminary Site Plan
Architectural Drawings for the first time.
This building predates the establishment of the EC, and there is only one previous ARB review, which was administrative. The ARB is
reviewing this Preliminary site plan and architectural drawings for the first time on May 6, 2019.
Figure 1: GIS Web map showing parcel (TMP 55-109A) with its Zoning Overlay (Highway Commercial). Note that the majority of parcels in the vicinity are either
zoned rural area (white) or highway commercial (red)
ANALYSIS
REF I GUIDELINE ISSUE RECOMMENDATION
GENERAL GUIDELINES
Purpose
1
The goal of the regulation of the design of development
This proposal is for the addition of two
None.
within the designated Entrance Corridors is to ensure that
separate (but connected) volumes to an
new development within the corridors reflects the
existing building that predates the
traditional architecture of the area. Therefore, it is the
establishment of the EC, as well as the
purpose of ARB review and of these Guidelines, that
renovation of the existing building's fagade.
proposed development within the designated Entrance
The character of the immediate area is rural
Corridors reflect elements of design characteristic of the
commercial, with one- and two-story
significant historical landmarks, buildings, and structures
vernacular buildings from the mid-20t'
of the Charlottesville and Albemarle area, and to promote
century through the early 21 st century. The
orderly and attractive development within these corridors.
proposed alterations, in form, materials, and
Applicants should note that replication of historic structures
scale, are in keeping with the neighboring
is neither required nor desired.
buildings that comprise this portion of the
EC. [Figures 2 and 3
PROPOSED I 1 SNED
EXPANSION M2
—OI 1N NEWCORRIDOR —111-1
�-
PROPOSED
EXPANSION 41 _- rvewuseo ovewxc EXISTING OFFICE Rewace GoaaR
6181 Rockfish Gap Turnpike, LLC. FLOOR PLAN
Figures 2 and 3: layout plan and floor plan, courtesy of applicant
NOT FOR CONSTRUCTION .�
3
2
Visitors to the significant historical sites in the
While this late-20t1i-century office building
None.
Charlottesville and Albemarle area experience these sites
does not reflect significant historical sites in
as ensembles of buildings, land, and vegetation. In order
the region, its vocabulary of low -slung
to accomplish the integration of buildings, land, and
horizontality and hipped roof does reflect the
vegetation characteristic of these sites, the Guidelines
buildings in the vicinity as well as local
require attention to four primary factors: compatibility
residential architecture. The proposed
with significant historic sites in the area; the character of
alterations retain these forms, while the
the Entrance Corridor; site development and layout; and
addition of street trees along the EC frontage
landscaping.
will further integrate the building in its
largely -rural environs.
Compatibility with significant historic sites:
3
New structures and substantial additions to existing
The additions proposed are substantial in size
None.
structures should respect the traditions of the architecture
and will greatly increase the mass of the
of historically significant buildings in the Charlottesville
building as well as the frontage along Rt.
and Albemarle area. Photographs of historic buildings in
250, the EC (the existing building is 2,850 sf
the area, as well as drawings of architectural features,
while the two additions are a combined 3,600
which provide important examples of this tradition are
sf — more than doubling the present
contained in Appendix A.
footprint). The proposed use of shingled,
hipped roofs and clapboard siding create the
4
The examples contained in Appendix A should be used as
a guide for building design: the standard of compatibility
appearance of a sprawling residential
with the area's historic structures is not intended to
structure rather than an identifiable office
impose a rigid design solution for new development.
space; however, this is in concert with the
Replication of the design of the important historic sites in
residential and rural nature of the area.
the area is neither intended nor desired. The Guideline's
standard of compatibility can be met through building
scale, materials, and forms which may be embodied in
architecture which is contemporary as well as traditional.
The Guidelines allow individuality in design to
accommodate varying tastes as well as special functional
requirements.
Compatibility with the character of the Entrance Corridor
5
It is also an important objective of the Guidelines to
The single -story scale proposed (and
None.
establish a pattern of compatible architectural
existing) is compatible with the adjacent
characteristics throughout the Entrance Corridor in order
buildings, while the use of two volumes is
to achieve unity and coherence. Building designs should
similar to the neighboring (to the west) F&R
demonstrate sensitivity to other nearby structures within
Office Building, in which two distinct
the Entrance Corridor. Where a designated corridor is
rectangular volumes are connected by a
substantially developed, these Guidelines require striking
breezeway. Both the F&R building and this
a careful balance between harmonizing new development
proposal emphasize a low -slung horizontality
with the existing character of the corridor and achieving
that is unobtrusive on the landscape.
compatibility with the significant historic sites in the area.
Site development and layout
6
Site development should be sensitive to the existing
The site development includes a parking lot
None.
natural landscape and should contribute to the creation of
of 26 spaces, which has been relegated to the
an organized development plan. This may be
rear (south) of the building, and a 20-foot-
accomplished, to the extent practical, by preserving the
wide private entrance drive that connects to
trees and rolling terrain typical of the area; planting new
the existing access road between the two
trees along streets and pedestrian ways and choosing
parcels at 6181 and 6185 Rockfish Gap
species that reflect native forest elements; insuring that
Turnpike. The site improvements require
any grading will blend into the surrounding topography
minimal cut and fill, although the clearing of
thereby creating a continuous landscape; preserving, to the
existing and mature trees is required. New
extent practical, existing significant river and stream
street trees are proposed on the EC frontage.
valleys which may be located on the site and integrating
these features into the design of surrounding development;
and limiting the building mass and height to a scale that
does not overpower the natural settings of the site, or the
Entrance Corridor.
Landscaping
7
The requirements of the Guidelines regarding landscaping
No lawns are proposed, but large shade trees
None.
are intended to reflect the landscaping characteristic of
are proposed along the EC which will better
many of the area's significant historic sites which is
integrate this parcel with the streetscape.
characterized by large shade trees and lawns. Landscaping
should promote visual order within the Entrance Corridor
and help to integrate buildings into the existing
environment of the corridor.
8
Continuity within the Entrance Corridor should be
obtained by planting different types of plant materials that
share similar characteristics. Such common elements
allow for more flexibility in the design of structures
because common landscape features will help to
harmonize the appearance of development as seen from
the street upon which the Corridor is centered.
SPECIFIC
GUIDELINES
Compatibility with significant historic sites
Structure design
9
Building forms and features, including roofs, windows,
The application package includes scaled
Provide material/color
doors, materials, colors and textures should be compatible
elevations, renderings of the proposed
samples for review.
with the forms and features of the significant historic
additions, and a description of some of the
buildings in the area, exemplified by (but not limited to)
proposed materials/color, which include
Consider adding
the buildings described in Appendix A [of the design
Hardie Plank siding in an unnamed off-white
architectural features to
guidelines]. The standard of compatibility can be met
color and a black shingle roof. The forms are
the roof to vary the
through scale, materials, and forms which may be
rectangular volumes capped with a similar
profile and mitigate large
embodied in architecture which is contemporary as well as
roof slope to that on the existing building.
blank expanses of roof
traditional. The replication of important historic sites in
The applicant has stated that "due to existing
cladding.
Albemarle County is not the objective of these guidelines.
grade... the proposed southern expansion's
FFE will be higher than the existing building.
As such, the corridor transition shall include
a ramp..." The resulting elevation oriented
towards the EC shows an expanse of roof, as
the roof of the south addition will be slightly
raised above the main building. No dormers
or breaks are proposed in this expanse of
roofing that can make the building appear
top-heavy. This could be mitigated by adding
dormers or other architectural features to
vary the roof profile and add relief to the roof
lane.
NEW I EXISTING
N—N EXISTN:J North Elevation: Existing + New
Figure 4: the facade (north elevation) oriented towards the EC, showing the existing building plus proposed addition to the east. Courtesy of the applicant.
10
Buildings should relate to their site and the surrounding
See above comments.
None.
context of buildings.
11
The overall design of buildings should have human scale.
The scale, at a single story with 35'
None.
Scale should be integral to the building and site design.
maximum height, is appropriate for this EC.
12
Architecture proposed within the Entrance Corridor
See above comments.
None.
should use forms, shapes, scale, and materials to create a
cohesive whole.
13
Any appearance of "blankness" resulting from building
The expanse of roof may be considered a
See recommendation in #9
design should be relieved using design detail or
vast blankness that should be mitigated with
vegetation, or both.
the addition of architectural features.
14
Arcades, colonnades, or other architectural connecting
None proposed.
None.
devices should be used to unify groups of buildings within
a development.
15
Trademark buildings and related features should be
This does not appear to be a trademark
None.
modified to meet the requirements of the Guidelines.
design.
16
Window glass in the Entrance Corridors should not be
The note has not been included on the
Include the standard window
highly tinted or highly reflective. Window glass in the
architectural renderings provided.
glass note on architectural
Entrance Corridors should meet the following criteria:
elevations.
Visible light transmittance (VLT) shall not drop below
40%. Visible light reflectance (VLR) shall not exceed
30%. Specifications on the proposed window glass should
be submitted with the application for final review.
Accessory structures and equipment
17
Accessory structures and equipment should be integrated
No accessory structures are proposed,
None.
into the overall plan of development and shall, to the
although a shed that exists to the south (rear)
extent possible, be compatible with the building designs
of the building will remain.
used on the site.
18
The following should be located to eliminate visibility from
The site plan does not show any proposed
Provide evergreen shrubs to the
the Entrance Corridor street. If, after appropriate siting,
loading or service areas. A storage area
northwest corner of the
these features will still have a negative visual impact on the
exists in the existing shed to the south of the
dumpster enclosure to further
Entrance Corridor street, screening should be provided to
building that was approved in 2011.
integrate it into the site.
eliminate visibility. a. Loading areas, b. Service areas, c.
Refuse areas, d. Storage areas, e. Mechanical equipment,
The refuse area is located in the northwest
If ground -mounted mechanical
f. Above -ground utilities, and g. Chain link fence, barbed
corner of the parking area, which is south of
equipment is proposed, show it
wire, razor wire, and similar security fencing devices.
and relegated behind the existing building,
away from the EC. It is expected to be
on the site plan. If roof-
mounted mechanical equipment
19
Screening devices should be compatible with the design of
the buildings and surrounding natural vegetation and may
partially visible from the EC. A trash
is proposed, provide a roof plan
consist of: a. Walls, b. Plantings, and c. Fencing.
enclosure (privacy fence) is proposed around
for review.
the dumpster, details of which have been
provided on Sheet C7.0. However, no
Ensure that all existing and
landscape screening is proposed; evergreen
proposed overhead and
shrubs placed on the northwest corner of the
underground utilities and their
dumpster may better integrate the enclosure
easements are shown
with its environs.
consistently throughout the site
plan set.
No mechanical equipment has been shown
on the site plans. If ground -mounted
mechanical equipment (such as HVAC units)
is intended, it must be shown on the site plan
and either located or screened in such a way
that visibility from the EC is eliminated. If
roof -mounted mechanical equipment is
proposed, then a roof plan showing the units
and their dimensions must be provided for
review.
There is a note on cover sheet that all utilities
will be installed underground; another states
"no external utility work is anticipated." The
two comments seem to be in opposition of
each other and the intention to install new
utilities needs clarification. Currently, only
proposed stormwater pipes are illustrated.
All existing and proposed utilities — both
overhead and underground — must be shown
consistently throughout the site plan set. This
is especially important on the landscape plan,
to ensure that no proposed tree will conflict
with a utility or its easement.
20
Surface runoff structures and detention ponds should be
Two bioretention basins are proposed on the
Provide shrubs, possibly
designed to fit into the natural topography to avoid the need
site: "Bio A" in the northeast corner of the
supplemented with groundcover
for screening. When visible from the Entrance Corridor
parcel, adjacent to the EC, and "Bio B" in the
and/or grasses, along the full
street, these features must be fully integrated into the
southwest corner of the parcel, relegated
frontage of the EC, including
landscape. They should not have the appearance of
behind the building and parking area. The
along the north side of the
engineered features.
latter will not be visible from the EC but the
basin, to integrate Basin A into
former will be. The proposed grading around
the development.
Bio A suggests a berm of approximately 3
feet in height will be created on the north
side, adjacent to the EC. A 6" HDPE will
also lead north from the retention basin to an
existing grate. Currently, the proposed
landscaping includes only two American
hornbeams in the center of the basin; this
will do little to mitigate the engineered
appearance of the basin from the EC.
Reshaping the basin in a more naturalistic
form and shifting it slightly to the south
would make the feature less prominent.
Furthermore, additional landscaping on the
northern and eastern edges of the basin
should be added to fully integrate this man-
made engineering feature into the natural
landscape. Shrubs, possibly supplemented
with groundcover and/or grasses, could be
used along the full frontage of the EC,
including along the north side of the basin, to
achieve more complete integration.
21
The following note should be added to the site plan and the
The note has been included on the Layout
None.
architectural plan: "Visibility of all mechanical equipment
Plan (Sheet C3.0).
from the Entrance Corridor shall be eliminated."
Lighting
22-
General Guidelines
No lighting plan with photometric values has
Provide a lighting plan that
28
been provided in this site plan set. A note on
shows all proposed wall -
the Landscape and Lighting Plan (Sheet
mounted and ground lighting
C8.0) states that "no freestanding lighting is
and includes photometric
proposed. All lighting will be building
values, a luminaire schedule,
mounted for building access purposes. These
and manufacturer's cut sheets.
fixtures will emit more than 3,000 lumens."
Correlate the placement of and
Another note reads "Low voltage path
show the proposed wall -
lighting may be also be used." Wall -mounted
mounted lights on the building
architectural lighting must be shown on
elevations.
building elevations as well as a lighting plan
that provides photometric values, a luminaire
schedule, and manufacturer's cut sheets.
29
The following note should be included on the lighting
The note has been included on the Landscape
None.
plan: "Each outdoor luminaire equipped with a lamp that
and Lighting Plan (Sheet C8.0)
emits 3,000 or more initial lumens shall be a full cutoff
luminaire and shall be arranged or shielded to reflect light
away from adjoining residential districts and away from
adjacent roads. The spillover of lighting from luminaires
onto public roads and property in residential or rural areas
zoning districts shall not exceed one half footcandle."
30-
Guidelines for the Use of Decorative Landscape Lighting
None proposed.
None.
31
Landscaping
32
Landscaping along the frontage of Entrance Corridor
Six trees are required for every 40' of the
Provide the height of the
streets should include the following:
234-foot EC frontage, and six trees have
overhead power line on the
a. Large shade trees should be planted parallel to the
been provided at an average of 35-feet on
north property line. Ensure that
Entrance Corridor Street. Such trees should be at least 31/2
center. Three of the trees are a large
the choice of trees planted in
inches caliper (measured 6 inches above the ground) and
deciduous species (pin oak) listed in the
the northeast property line will
should be of a plant species common to the area. Such
plant schedule provided on the Landscape &
not conflict with the overhead
trees should be located at least every 35 feet on center.
Lighting Plan (Sheet C8.0) as 3.5" caliper
line when grown to maturity.
b. Flowering ornamental trees of a species common to the
upon planting. The other three are medium
area should be interspersed among the trees required by the
deciduous trees (European hornbeams). The
Revise the plant schedule to
preceding paragraph. The ornamental trees need not
applicant has stated that he has provided
show the planting height for the
alternate one for one with the large shade trees. They may be
smaller trees on the eastern end of the site
EC frontage street trees at 3.5"
planted among the large shade trees in a less regular spacing
due to the existence of an overhead electric
caliper.
pattern.
line; yet the European hornbeam can mature
c. In situations where appropriate, a three or four board
to 40'-60' in height and 35'-40' in spread.
fence or low stone wall, typical of the area, should align
Depending upon the height of the power line,
the frontage of the Entrance Corridor street.
this choice of species may not avoid future
d. An area of sufficient width to accommodate the
conflicts with a utility. Furthermore, the
foregoing plantings and fencing should be reserved
plant schedule lists this tree species at a 2.5"
parallel to the Entrance Corridor street, and exclusive of
caliper at planting; the intent behind the 3.5"
road right-of-way and utility easements.
caliper requirement is for more immediate
impact and the guideline should be applied
consistently across the EC.
33
Landscaping along interior roads:
The interior drive shared by the two
None.
a. Large trees should be planted parallel to all interior
neighboring properties at 6181 and 6185
roads. Such trees should be at least 2%2 inches caliper
Rockfish Gap Turnpike has six existing 2"-
(measured six inches above the ground) and should be of a
caliper European hornbeams on the eastern
)antspecies common to the area. Such trees should be
side on thisparcel) which are to remain. The
10
located at least every 40 feet on center.
landscape plan shows tree protection fencing
around these six trees.
34
Landscaping along interior pedestrian ways:
The proposed sidewalk on the northwest
See comment below.
a. Medium trees should be planted parallel to all interior
corner of the building is flanked by two of
pedestrian ways. Such trees should be at least 2'/2 inches
the existing European hornbeams on site.
caliper (measured six inches above the ground) and should
The proposed sidewalk leading from the
be of a species common to the area. Such trees should be
parking area to the southeast corner of the
located at least every 25 feet on center.
buildin additions is devoid of landscaping.
35
Landscaping of parking areas:
Two perimeter parking -area trees have been
Provide additional perimeter
a. Large trees should align the perimeter of parking areas,
proposed in the Landscape & Lighting Plan
trees to the parking area,
located 40 feet on center. Trees should be planted in the
(Sheet C8.0), and the existing treeline on the
especially the northwest and
interior of parking areas at the rate of one tree for every 10
neighboring property to the east abuts the
northeast corners.
parking spaces provided and should be evenly distributed
eastern edge of the parking lot. Providing
throughout the interior of the parking area.
perimeter parking trees on the northwest
b. Trees required by the preceding paragraph should
corner of the parking area would further
measure 2'/2 inches caliper (measured six inches above the
screen the proposed dumpster and its
ground); should be evenly spaced; and should be of a
enclosure from the EC, while providing
species common to the area. Such trees should be planted
perimeter parking trees on the northeast
in planters or medians sufficiently large to maintain the
corner of the parking area would serve a dual
health of the tree and shall be protected by curbing.
purpose of shading the sidewalk that leads
c. Shrubs should be provided as necessary to minimize the
from the parking area to the southwest
parking area's impact on Entrance Corridor streets. Shrubs
building additions (see above comment).
should measure 24 inches in height.
The 26-space parking area has been allocated
three interior medium deciduous (red buds)
trees. 15 shrubs have been dispersed beneath
the two perimeter parking trees and three
interior parking trees provided.
36
Landscaping of buildings and other structures:
No shrubs or other plantings have been
Provide shrubs or other
a. Trees or other vegetation should be planted along the
provided along the front of the building.
plantings along the front of the
front of long buildings as necessary to soften the
[Figure 51. The addition of shrubs between
building.
appearance of exterior walls. The spacing, size, and type
the proposed street trees would soften the
of such trees or vegetation should be determined by the
building and better integrate it into the site.
length, height, and blankness of such walls.
b. Shrubs should be used to integrate the site, buildings,
and other structures; dumpsters, accessory buildings and
structures; "drive thru" windows; service areas; and signs.
Shrubs should measure at least 24 inches in height.
11
Figure S: rendering of the favade (north elevation) showing proposed landscaping along the EC. Courtesy of the applicant
37
Plant species:
All of the plant species are in County-
Consider substituting native
a. Plant species required should be as approved by the
approved plant lists; however, three of the
species for the non-native
Staff based upon but not limited to the Generic Landscape
six species proposed are non -natives, and
species proposed. Substitute a
Plan Recommended Species List and Native Plants for
Nandina domestica has become an invasive
native species for the invasive
Virginia Landscapes (Appendix D).
species in Albemarle. The use of locally
Nandina domestica.
native species where possible and the
substitution of Nandina domestica with a
Ensure that no one tree or shrub
native species would support the overall
species exceeds the 25%
health of the landscape.
threshold for the total number
of trees or shrubs on the site.
12
Furthermore, it is standard EC practice that
no one tree or shrub species exceed 25% the
total (in number) of all trees and shrubs
proposed. This practice is to avoid a
monoculture that is problematic for plant
health and longevity. The European
hornbeams may be over -represented on the
site. (Not all of the individual trees in the
wooded area along the east side of the site
are identified.) A similar situation exists for
the proposed shrubs, but this can be resolved
with the additional shrubs recommended in
#20.
38
Plant health:
The note has been provided on the
None.
The following note should be added to the landscape plan:
Landscape and Lighting Plan (C8.0)
"All site plantings of trees and shrubs shall be allowed to
reach, and be maintained at, mature height; the topping of
trees is prohibited. Shrubs and trees shall be pruned
minimally and only to support the overall health of the
lant."
Site Development and layout
Development paftern
39
The relationship of buildings and other structures to the
The site plan shows an organized pattern of
None.
Entrance Corridor street and to other development within
roads and pedestrian paths. The existing
the corridor should be as follows:
building and its additions are oriented
a. An organized pattern of roads, service lanes, bike paths,
towards and parallel to the EC street.
and pedestrian walks should guide the layout of the site.
Connections to the existing access drive and
b. In general, buildings fronting the Entrance Corridor
the main thoroughfare (Rt. 250/Rockfish Gap
street should be parallel to the street. Building groupings
Turnpike) have been provided. No open
should be arranged to parallel the Entrance Corridor street.
spaces have been provided, but 42% of the
c. Provisions should be made for connections to adjacent
site (0.46 acres) is impervious. No significant
pedestrian and vehicular circulation systems.
features or vistas exist that should be
d. Open spaces should be tied into surrounding areas to
preserved.
provide continuity within the Entrance Corridor.
e. If significant natural features exist on the site (including
creek valleys, steep slopes, significant trees or rock
outcroppings), to the extent practical, then such natural
features should be reflected in the site layout. If the
13
provisions of Section 32.5.2.n of the Albemarle County
Zoning Ordinance apply, then improvements required by
that section should be located so as to maximize the use of
existing features in screening such improvements from
Entrance Corridor streets.
f. The placement of structures on the site should respect
existing views and vistas on and around the site.
Site Grading
40
Site grading should maintain the basic relationship of the
The majority of the proposed grading is in
See comment in #20.
site to surrounding conditions by limiting the use of
the southern half of site, behind the building,
retaining walls and by shaping the terrain through the use of
for the parking area and the Bio B
smooth, rounded land forms that blend with the existing
bioretention basin. However, a significant
terrain. Steep cut or fill sections are generally unacceptable.
amount of grading is proposed in the
Proposed contours on the grading plan shall be rounded with
northeast corner of the site, adjacent to the
a ten foot minimum radius where they meet the adjacent
EC, for the Bio A bioretention basin. This
condition. Final grading should achieve a natural, rather than
may give the stormwater management
engineered, appearance. Retaining walls 6 feet in height and
facility an engineered appearance that should
taller, when necessary, shall be terraced and planted to blend
be mitigated by landscaping.
with the landscape.
41
No grading, trenching, or tunneling should occur within the
Tree protection fencing and a signed
Note that any trees that are
drip line of any trees or other existing features designated
conservation list have been shown on the
damaged or killed by grading or
for preservation in the final Certificate of Appropriateness.
Landscape & Lighting Plan (Sheet C8.0).
construction activities or by
Adequate tree protection fencing should be shown on, and
The grading proposed around the proposed
other means must be replaced.
coordinated throughout, the grading, landscaping and
sidewalk on the northwestern corner of the
erosion and sediment control plans.
building appears to fall within the drip line of
the second existing European hornbeam from
42
Areas designated for preservation in the final Certificate
of Appropriateness should be clearly delineated and
the north property line. Grading for the
protected on the site prior to any grading activity on the
parking area and for Bio B basin also appear
site. This protection should remain in place until
close to other European hornbeams that are
completion of the development of the site.
marked to remain. Any existing trees marked
to remain that are damaged or killed from
43
Preservation areas should be protected from storage or
movement of heavy equipment within this area.
grading or construction activities must be
replaced or the site will not be in compliance
with the approved site plan.
44
Natural drainage patterns (or to the extent required, new
See comments in #20 and #40.
See comments in #20 and #40.
drainage patterns) should be incorporated into the finished
site to the extent possible.
14
1.100T1uMW&Oa9OccI]U1UI040IMIY[13M
Staff recommends the following as the primary points of discussion:
1. The roof expanse and whether the additional of architectural features would mitigate its scale and vast blankness.
2. The appearance of Bio A bioretention basin from the EC and successful landscaping strategies to mitigate its appearance.
Staff offers the following comments to be addressed with the future site plan submittals:
1. Provide material/color samples for review.
2. Consider adding architectural features to the roof to vary the profile and mitigate large blank expanses of roof cladding.
3. Include the standard window glass note on architectural elevations: Visible light transmittance (VLT) shall not drop below 4001o. Visible light
reflectance (VLR) shall not exceed 30%.
4. Provide evergreen shrubs to the northwest corner of the dumpster enclosure to further integrate it into the site.
5. If ground -mounted mechanical equipment is proposed, show it on the site plan. If roof -mounted mechanical equipment is proposed, provide a roof
plan for review.
6. Ensure that all existing and proposed overhead and underground utilities and their easements are shown consistently throughout the site plan set.
7. Provide shrubs, possibly supplemented with groundcover and/or grasses, along the full frontage of the EC, including along the north side of the
basin, to integrate Basin A into the development.
8. Provide a lighting plan that shows all proposed wall -mounted and ground lighting and includes photometric values, a luminaire schedule, and
manufacturer's cut sheets. Correlate the placement of and show the proposed wall -mounted lights on the building elevations.
9. Provide the height of the overhead power line on the north property line. Ensure that the choice of trees planted in the northeast property line will not
conflict with the overhead line when grown to maturity.
10. Revise the plant schedule to show the planting height for the EC frontage street trees at 3.5" caliper.
It. Provide additional perimeter trees to the parking area, especially the northwest and northeast corners.
12. Provide shrubs or other plantings along the front of the building.
13. Consider substituting native species for the non-native species proposed. Substitute a native species for the invasive Nandina domestica.
14. Ensure that no one tree or shrub species exceeds the 25% threshold for the total number of trees or shrubs on the site.
15. Note that any trees that are damaged or killed by grading or construction activities or by other means must be replaced.
15
0M:3 0 W.1
This report is based on the following submittal items:
Sheet #
Drawing Name
Drawin Date/Revision Date
C1.0
Cover Sheet
3/25/19
C2.0
Existing Conditions Plan
3/25/19
C3.0
I Layout Plan
3/25/19
C4.0
Grading Plan
3/25/19
C7.0
Site Details
3/25/19
C8.0
Landscape & Lighting Plan
3/25/19
C9.0
VDOT Plan
3/25/19
n. .
New Office Expansion cover of renderings packetl
3/25/19
n•p•
Project Overview
3/25/19
n•p•
Existing Views/Adjacent Buildings
3/25/19
n•p•
Floor Plan
3/25/19
n•p•
Phased Building Elevations
3/25/19
n•p•
Exterior Elevations north and west
3/25/19
n•p•
Exterior Elevations [south and east]
3/25/19
n.p.
Aerial View Perspective
3/25/19
n•p•
Exterior View
3/25/19
n•p•
Exterior View
3/25/19
n•p•
East Side Street View
3/25/19
n•p•
West Side Street Perspective
3/25/19
16