Loading...
HomeMy WebLinkAboutSDP201800005 Correspondence 2018-03-30 PHONE(434)977.0205 l, FAX(434)296.5220 "'fir Nitio0 INFO.ROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. LAND SURVEYING A PROFESSIONAL CORPORATION Serving Virginia Siner 1956 ENGINEERING 914 MONTICFI IC)ROAD LAND PLANNING C:HARLOTTESVILLF VIRGINIA 22902 , N"11.I.IAM J.LEDBLFUR.L.S. BRIAN D.JAMISON.L.S. JIM L. FA(:GARC.P.E. DAVID A.JORDAN.L.S. DAVID M.ROBINSON.P.E. RRISIOPIILR C.V1 IN IE.RS.L.S. AMMY M.(i1i(N(Gl..I..A. TO: Mr.JT Newbery DATE: March 30,2018 County of Albemarle JOB #: 8053 Department of Community Development PROJ: Old Trail Village Block 7—Phase 2 401 McIntire Road, Suite 227 SDP 2018-000005 Charlottesville,Va.22902-4596 X Attached Under separate cover via the following items: #of Copies Date Job # Description 4 3/29/2018 Old Trail Village Block 7,Phase 2 Final Site Plan These are transmitted as checked below: _For Approval/Signature _For your use Please return _As requested _Resubmitted w/revisions X Review/Comment For Bids due Other REMARKS: SIGNED: Ammy George COPY TO: If enclosures are not as noted,kindly notify us at once. PHONE(434)977-0205 • FAX(434)296-5220 1111 INFO@ROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. A PROFESSIONAL CORPORATION LAND SURVEYING Serving Virginia Since 1956 ENGINEERING LAND PLANNING 914 MONTICELLO ROAD CHARLOTTESVILLE,VIRGINIA 22902 WILLIAM J.LEDBETTER.L.S. BRIAN D JAMISON,L.S. JIM L.IAGGART.P.L. DAVID A.JORDAN,L.S. DAVID M.ROBINSON.P.E. KRIti FOP} ER C WINTERS.L.S. AMMY M.GEORGE.L.A. March 30, 2018 Mr.J.T. Newberry, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road, Rm. 227 Charlottesville, VA 22902-4596 RE: Old Trail Village, Block 7, Phase 2 (SDP2018-00005) Dear Mr. Newberry, I have reviewed your comments from March 22, 2018, below are the individual responses. PI nin . On heet 1, please remove the ARB signature line from the approval block. The ARB signature line has been removed from the approval block. ve Section 4.12.16 - Please show how a 9'x 18' parking spot fits on Lot 13. The parking space has been revised to be 18' long on its shortest side measured from the back of curb. I count a total of 50 parking spots provided, but the "Parking Provided" calculation on Sheet 1 only notes 42 spaces. Please revise this calculation to include 8 proposed parking spaces within the parking lot. The phasing of the project have changed. The parking lot that was previously shown has been removed.The parking lot will be designed and built when the commercial property is developed. The total number of parking spaces proposed is 43 parking spaces. Section 4.12.8 - Please submit an updated shared parking agreement. There may need to be signage in the proposed parking area as required by Section 4.12.11(b). The phasing of the project have changed.The parking lot that was previously shown has been removed. The parking lot will be designed and built when the commercial property is developed.A Parking Agreement is not needed at this time. OTV Block 7, Phase 2 SDP2018-00005 1 0. On Sheet 6, please update the Development Chart to indicate of the units are market rate. Please clarify the information currently shown for Block 7 applies to development within Block 7A (or Block 7 Ph. 1, 2). It may be easier to track if one line contained information for Block 7A and one line contained information for Block 7B until Block 7 is fully built-out. The Development Chart has been updated to show Block 7 as Phase 1 and Phase 2. p<6. Section 32.7.9.5 - I see there is a storm pipe along the Old Trail Drive frontage, but what other options exist to provide street trees along Block 7? The existing storm pipe that will be replaced as part of this project was also under the planting strip area. Street trees will be planted as close to the traffic circle without interfering with the storm sewer as possible. k7. Section 32.7.9.7(a)(2) -What type of screening can be used to screen the parking area from Lot 18? The phasing of the project have changed. The parking lot that was previously shown has been removed. The parking lot will be designed and built when the commercial property is developed.Any required or extra landscaping will be added at that time. I/8. [Question - Section 4.12.13] Will this commercial parcel require a dumpster (or a dumpster waiver)?A dumpster pad with screening is required for any commercial building above 4,000 square feet. The design of the building that will be constructed on the commercial parcel will be similar to that of Block 3C. It is assumed that the building will be a mixed-use building with curbside trash pick-up. Engineering 1. WPO and Road Plan approval must occur prior to final site plan approval. Acknowledged. 2. Topography must be field verified by designer within the past year. Please provide date of field verification. An additional field run survey was performed in July, 2017. It has been included in the list of other field run surveys on the Cover Sheet. 3. Ensure all recorded easements are identified with Deed book and page (missing DB&P for existing sanitary sewer easement) The recordation information for the Block 7A Phase 1 lots and easements have been noted on the plan. 4. Identify location of steep/managed/preserved slopes. It appears symbol is provided, but not shown on plans. The steep slopes areas have been added to the plan. OTV Block 7, Phase 2 SDP2018-00005 2 5. Provide storm sewer calculations for proposed storm sewer. The storm sewer profiles, details and calculations have been provided on the Road and Utility Plans (SUB2018-00012). Emily Cox has reviewed those plans and provided us with comments on February 5, 2018. 6. Provide details for all proposed structures (Drop inlets, CG-12, etc.) The storm sewer profiles, details and calculations have been provided on the Road and Utility Plans (SUB2018-00012). Emily Cox has reviewed those plans and provided us with comments on February 5, 2018. 7. Parallel parking must be a minimum of 9x20'. Currently shown as only 8' wide. All of the on-street parking within Old Trail has been designed to meet the standards in VDOT Road Design Manual Section B(1)4.0 It allows for the parking spaces to be 8 feet in width measured from the face of curb. If you have any questions or comments, please feel free to contact me. Sincerely, 46, Am y Geo Pge OTV Block 7, Phase 2 SDP2018-00005 3